Once construction is complete, as-built plan certification shall be submitted by either a professional engineer or professional land surveyor licensed in the State of Maryland for approval by the Land Use and Planning Engineer to ensure that ESD planning techniques, treatment practices, and structural stormwater management measures and conveyance systems comply with the specifications contained in the approved plans. At a minimum, as-built certification shall include a set of drawings overlaying and comparing the approved stormwater management plan with what was constructed. The Land Use and Planning Engineer shall require additional information, including but not limited to, construction inspection reports, compaction reports and photographs, as applicable. If BMPs requiring Allegany Soil Conservation District approval are constructed, pond as-built must also be submitted for approval by the Allegany Soil Conservation District.