In order to protect and preserve the road network of the Township, ensure the efficient and safe movement of traffic, promote the development of a well-ordered community, further the objectives of comprehensive planning and best serve and protect the public health, safety and general welfare, no public, professional, commercial, industrial or other nonresidential or nonagricultural use and no multiple-family dwelling use, except for a development consisting of two-family dwellings, shall be permitted, nor shall any zoning permit be issued or occupancy permit countersigned for such uses, until site plan approval has been received according to the procedures of Part 1, § 75-7, and the requirements below and in § 75-67.
A.
Preliminary site plan submission requirements. In addition to the information required for a zoning permit, materials to be submitted with each application for site plan review shall clearly show the conditions on and adjacent to the site at the time of the application, the features of the site which are being incorporated into the proposed use or building and the appearance and function of the proposed use or building. Site plans shall be signed and sealed by either a New Jersey licensed professional engineer or registered architect. They shall be drawn in black on white at a scale of not less than one inch equals 50 feet. As a minimum, the application shall provide the following information, including plans for both before and after conditions:
(1)
The location, design and dimensions of each use and building.
(2)
The building or use setback distances from all property lines.
(3)
Special relationships to any existing buildings or structures in the general vicinity.
(4)
The location, dimensions and arrangement of streets, vehicular accessways, off-street parking and loading and unloading areas.
(5)
The location and dimensions of sidewalks, recreation and landscaped areas.
(6)
The location, design and dimensions of open areas, buffer areas, screening arrangements and public easements.
(7)
The amount, location, sizes and species of landscape materials.
(8)
Lighting of buildings, signs and grounds.
(9)
Size, type and location of signs.
(10)
The location, size and direction of flow of all streams, brooks, ditches, lakes and ponds.
(11)
Contours at two-foot intervals for slopes averaging 5% or greater and one-foot contours for slopes less than 5%, unless determined by the Township Engineer to be unnecessary in whole or in part.
(12)
Plans and design data for storm drainage facilities.
(13)
The location, arrangement and description of water supplies and sewage disposal facilities.
(14)
At a minimum, the floor plan and front elevation of all proposed principal buildings and all contemplated accessory buildings and structures.
(15)
The Tax Map sheet, block and lot numbers.
(16)
The name and address of owner, developer, and person preparing the plan.
(17)
A key map showing the location of the site and its relation to surrounding areas.
(18)
A certificate from the Tax Collector that all taxes are paid to date.
(19)
Such other data and plans as the Planning Board may require to properly take action on the application.
(20)
An environmental impact statement, as defined in §
75-15.
[Added 8-8-1991 by Ord. No. 271]
(21)
For all developments that will be required to provide affordable housing units in accordance with the provisions of §
75-36.1, Growth Share and Affordable Housing, six copies of an analysis of the growth share obligation created by the proposed development and a detailed explanation of how the applicant proposes to meet said obligation as set forth in §
75-36.1, and a plan for the affirmative marketing, screening, and selection of occupants of the low- and moderate-income units shall be provided. This plan shall conform to the regulations of the New Jersey Council on Affordable Housing, the Alloway Township Fair Share Plan, and Affirmative Marketing Ordinance. Details shall be provided regarding the applicant's plan for providing the affordable units and in doing so the applicant's compliance with the provisions of said COAH regulations and other relevant Township ordinances.
[Added 3-15-2007 by Ord. No. 401]
A1.
Additional preliminary site plan submission requirement for land mining operations. In addition to the foregoing information required for site plan review, any land mining operation shall submit the following information:
[Added 2-8-1991 by Ord. No. 270]
(1)
An accurate map at a scale of not less than 50 feet to the inch, including:
(a)
The location of the production site, the excavation area, setbacks from existing property and street lines and proposed access roads.
(b)
Detailed topographic information (contours at two-foot intervals for slopes averaging 5% or greater and one-foot contours for slopes less than 5%), showing the existing surface contours and drainage patterns and the proposed surface contours and drainage patterns following the termination of the excavation and restoration of the site.
(2)
A grading plan shall be submitted to indicate the extent and manner of excavation. The plan shall indicate the ultimate depth and contours for the entire site as well as ultimate depth and contours of each cell (five-acre maximum).
(3)
Results of one soil profile pit shall be submitted per each five acres of excavation area. The profile plan shall be made from January 1 to April 1 to clearly indicate the depth to seasonal high water table.
(4)
A description of the nature of the proposed operation, including:
(a)
The period and hours of operation.
(b)
The type of equipment to be used and measures proposed for avoiding safety hazards, wind erosion, excessive noise and other nuisance characteristics.
(5)
An environmental impact statement addressing the environmental considerations of § 75-67.
(6)
A traffic impact study and analysis report prepared by a New Jersey licensed professional engineer specializing in traffic engineering.
(7)
Sufficient information on the plans and in the impact statement as determined by the Board and Township Engineer, to demonstrate conformance with the design standards and conditions of this section.
(8)
All freshwater wetlands and wetland transition areas on the site shall be delineated and verified by the New Jersey Department of Environmental Protection.
(9)
A plan prepared by a New Jersey licensed engineer showing location and details of proposed monitoring wells and a program for sampling and monitoring groundwater in the highest water table entering and leaving its site, by a New Jersey certified laboratory, to determine any adverse effect of the land mine on safe drinking water standards.
B.
Final site plan submission requirements. In addition to the information required for preliminary site plan submission, the final submission shall show compliance with all conditions of preliminary approval.
C.
In connection with all site plan reviews, the Planning Board shall also, on the advice of the Township Engineer, determine the amount of the performance guaranty that should be filed with the Township prior to the issuance of any zoning permit or certificate of occupancy to ensure the timely installation of all improvements as shown on the site plan or required by the Planning Board, such as but not limited to drainage, street improvement, recreational areas, landscaping, off-street parking and loading areas, lighting, sidewalks and sanitary sewer and water lines. The performance bond or other security shall be approved by the Planning Board as to substance and by the Township Solicitor as to form. The provisions of N.J.S.A. 40:55D-53 shall govern said bonds and the completion, inspection and approval of said improvements and the payment of inspection fees.
C1.
Performance guaranty for land mining operation.
[Added 2-8-1991 by Ord. No. 270]
(1)
Before any permit, license, conditional use, site plan approval or certificate of occupancy may be issued for any land mining operation, the owner and operator shall file with the Township Clerk a performance guaranty. This may be a performance bond issued by an insurance company authorized to do business in the State of New Jersey or may be any security, including cash, that is approved by the Township Committee. Such performance guaranty shall be in an amount not to exceed 120% of the amount sufficient, in the opinion of the Planning Board based on recommendations by the Township Engineer, to assure the installation and maintenance of the required improvements and to assure the rehabilitation and any required monitoring of the site of operations, after having considered the area and depth of the excavation or proposed excavation along with any facts relevant to the cost of improving, maintaining, rehabilitating and monitoring the site. Any performance guaranty shall be approved as to form by the Township Solicitor.
(2)
Any such performance guaranty shall be accompanied by an agreement recordable as a deed in the County Clerk's office, signed by the applicant and landowner, if a different person, approved as to form by the Township Solicitor, granting the municipality and its agents the right of access to inspect the premises at any time and to install and maintain required improvements and to perform all necessary rehabilitation and monitoring of the site of operations in the event of forfeiture of the performance guaranty.
(3)
In the event of default, forfeiture shall be taken by the Township Committee after finding of default by the Township Committee after a public hearing held by the Township Committee on not less than 10 days' written notice, mailed to the principal and surety at their last known post office addresses, which notice shall be complete upon mailing. Forfeiture shall also be taken by the Township Committee upon a determination by it that a land mining operation has been abandoned, after a public hearing as provided above, or when, on the basis of a formal complaint and after a public hearing as provided above, the Township Committee finds that a public nuisance or hazardous condition has been permitted to exist for a period of 30 days by the owner or operator of a land mining operation after due notice thereof to the owner or operator by the Township Engineer or Zoning Officer.
(4)
The performance guaranty may be released by the Township Committee upon a finding by the Township Committee of satisfactory installation and maintenance of required improvements and restoration and monitoring of the completed project area. Portions of the performance guaranty may be released by the Township Committee upon its finding that proportional required improvements have been completed or that proportional stages of restoration or monitoring have been accomplished in accordance with the above-listed operating standards and restoration standards and with the terms of the permit, license, conditional use, site plan approval or certificate of occupancy.
D.
Supervision.
(1)
All required improvements shall be installed under the supervision and inspection of a designated representative of the Township, the cost thereof to be borne by the developer under the fee provisions of Part 5 of this chapter.
(2)
All construction stakes and grades thereon shall be set by a professional engineer in the employ of the developer or his contractor, and a duplicate copy of the notes made therefrom shall be filed with the Township Engineer.
(3)
No construction work shall commence without the Township Engineer being properly notified. Such notice shall be given at least one week before said commencement of work.