ZONING DISTRICT REGULATIONS
Minimum Regulations | |||
|---|---|---|---|
Lot Area (net) | 80,000 square feet | ||
Lot Width | 200 feet | ||
Building Setback | 50 feet | ||
Rear Yard | 30 feet | ||
Side Yard | |||
Total | 50 feet | ||
One Side | 25 feet | ||
Buffer Yard (depth) | 10 feet | ||
Maximum Regulations | |||
Building Height | |||
Farm Buildings/Silos | No Maximum | ||
Principal Buildings | 35 feet | ||
Lot Coverage | 12% | ||
Minimum Regulations | ||
|---|---|---|
Lot Area (Net) | 80,000 square feet | |
Lot Width | 200 feet | |
Building Setback | 50 feet | |
Rear Yard | 30 feet | |
Side Yard | ||
Total | 50 feet | |
Each Side | 25 feet | |
Buffer Yard (depth) | 10 feet | |
Maximum Regulations | ||
|---|---|---|
Building Height | 35 feet | |
Lot Coverage | 20% | |
Minimum Regulations | On-Lot Sewage And Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities | |
|---|---|---|---|---|
Lot Area (net) | 80,000 square feet | 30,000 square feet | 12,000 square feet | |
Lot Width | 200 feet | 125 feet | 100 feet | |
Building Setback | 50 feet | 40 feet | 30 feet | |
Rear Yard | 30 feet | 20 feet | 20 feet | |
Side Yard | ||||
Total | 50 feet | 40 feet | 30 feet | |
Each Side | 25 feet | 20 feet | 15 feet | |
Buffer Yard (depth) | 10 feet | 10 feet | 10 feet | |
Maximum Regulations | On-Lot Sewage And Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities | |
|---|---|---|---|---|
Building Height | 35 feet | 35 feet | 35 feet | |
Lot Coverage | 20% | 30% | 40% | |
Minimum Regulations | On-Lot Sewage And Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities |
|---|---|---|---|
Lot Area | 80,000 square feet | 50,000 square feet | 30,000 square feet |
Lot Width | 200 feet | 150 feet | 120 feet |
Building Setback | 60 feet | 60 feet | 60 feet |
Rear Yard | 60 feet | 50 feet | 50 feet |
Side Yard Total | 60 feet | 60 feet | 30 feet |
Each Yard | 30 feet | 30 feet | 15 feet |
Improvement Setback | 20 feet | 20 feet | 10 feet |
Buffer Yard (Depth) | 10 feet | 10 feet | 10 feet |
Landscaped Area | 50% | 40% | 30% |
Maximum Regulations | On-Lot Sewage And Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities |
|---|---|---|---|
Building Height | 50 feet | 50 feet | 50 feet |
Lot Coverage | 30% | 30% | 40% |
Paved Area | 40% | 50% | 60% |
Minimum Regulations | |||
|---|---|---|---|
Lot Area | 3 acres | ||
Lot Width | 250 feet | ||
Building Setback | 80 feet | ||
Rear Yard | 50 feet | ||
Side Yard | |||
Total | 80 feet | ||
One Side | 40 feet | ||
Improvement Setback | 30 feet | ||
Buffer Yard (Depth) | 20 feet | ||
Landscaped Area | 30% | ||
Maximum Regulations | |||
|---|---|---|---|
Building Height | 50 feet | ||
Lot Coverage | 40% | ||
Paved Area | 60% | ||
Minimum Regulations | |||
|---|---|---|---|
Lot Area | 3 acres | ||
Lot Width | 250 feet | ||
Building Setback | 80 feet | ||
Rear Yard | 50 feet | ||
Side Yard | |||
Total | 80 feet | ||
One Side | 40 feet | ||
Improvement Setback | 30 feet | ||
Buffer Yard (Depth) | 20 feet | ||
Landscaped Area | 30% | ||
Maximum Regulations | |||
|---|---|---|---|
Building Height | 50 feet | ||
Lot Coverage | 40% | ||
Paved Area | 60% | ||
Minimum Regulations | ||
|---|---|---|
Construction Site Area | 40 acres | |
Construction Site Contiguous Lot Width Building Setbacks | 200 feet | |
Perimeter of PBOI Zoning District, including existing streets | 100 feet | |
Existing Residential Use | 100 feet | |
Improvement Setback | ||
Perimeter of PBOI District, including existing streets | 75 feet | |
Existing Residential Use | 75 feet | |
Buffer Yard | ||
Perimeter of PBOI District, including existing streets | 25 feet | |
Existing Residential Use | 25 feet | |
Landscaped Area of Construction Site | 20% | |
Maximum Regulations | ||
|---|---|---|
Building Height | 75 feet | |
Impervious Area of Construction Site | 80% | |
Minimum Regulations | On-Lot Sewage and Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities | |
|---|---|---|---|---|
Lot Area | 80,000 square feet | 30,000 square feet | 12,000 square feet | |
Lot Width | 200 feet | 125 feet | 100 feet | |
Building Setback* | 30 feet | 30 feet | 30 feet | |
Rear Yard | 30 feet | 20 feet | 20 feet | |
Side Yard | ||||
Total | 50 feet | 40 feet | 30 feet | |
Each Side | 25 feet | 20 feet | 15 feet | |
Buffer Yard (depth) | 10 feet | 10 feet | 10 feet | |
Maximum Regulations | On-Lot Sewage and Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities | |
|---|---|---|---|---|
Building Height 35 feet | 35 feet | 35 feet | ||
Lot Coverage 20% | 30% | 40% | ||
* | The building setback shall not apply in the event there are existing structures located within 30 feet of the ultimate right-of-way on any one of the three adjoining lots on either side of the subject lot. In such cases, the minimum setback shall be equal to the setback of the structure closest to the road but located no closer than the line of the ultimate right-of-way. |
Minimum Regulations | On-Lot Sewage and Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities |
|---|---|---|---|
Lot Area | 80,000 square feet | 40,000 square feet | 20,000 square feet |
Lot Width | 200 feet | 150 feet | 100 feet |
Building Setback* | 30 feet | 30 feet | 30 feet |
Rear Yard | 30 feet | 30 feet | 20 feet |
Side Yard Total | 50 feet | 40 feet | 30 feet |
Each Yard | 25 feet | 20 feet | 15 feet |
Improvement Setback | 20 feet | 10 feet | 10 feet |
Buffer Yard (depth) | 10 feet | 10 feet | 10 feet |
Landscaped Area | 50% | 40% | 30% |
Maximum Regulations | |||
|---|---|---|---|
Building Height 35 feet | 35 feet | 35 feet | |
Lot Coverage | 30% | 30% | 40% |
Paved Area | 40% | 50% | 60% |
* | The building setback shall not apply in the event there are existing structures located within 30 feet of the ultimate right-of-way on any one of the three adjoining lots on either side of the subject lot. In such cases, the minimum setback shall be equal to the setback of the structure closest to the road but located no closer than the line of the ultimate right-of-way. |
ZONING DISTRICT REGULATIONS
Minimum Regulations | |||
|---|---|---|---|
Lot Area (net) | 80,000 square feet | ||
Lot Width | 200 feet | ||
Building Setback | 50 feet | ||
Rear Yard | 30 feet | ||
Side Yard | |||
Total | 50 feet | ||
One Side | 25 feet | ||
Buffer Yard (depth) | 10 feet | ||
Maximum Regulations | |||
Building Height | |||
Farm Buildings/Silos | No Maximum | ||
Principal Buildings | 35 feet | ||
Lot Coverage | 12% | ||
Minimum Regulations | ||
|---|---|---|
Lot Area (Net) | 80,000 square feet | |
Lot Width | 200 feet | |
Building Setback | 50 feet | |
Rear Yard | 30 feet | |
Side Yard | ||
Total | 50 feet | |
Each Side | 25 feet | |
Buffer Yard (depth) | 10 feet | |
Maximum Regulations | ||
|---|---|---|
Building Height | 35 feet | |
Lot Coverage | 20% | |
Minimum Regulations | On-Lot Sewage And Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities | |
|---|---|---|---|---|
Lot Area (net) | 80,000 square feet | 30,000 square feet | 12,000 square feet | |
Lot Width | 200 feet | 125 feet | 100 feet | |
Building Setback | 50 feet | 40 feet | 30 feet | |
Rear Yard | 30 feet | 20 feet | 20 feet | |
Side Yard | ||||
Total | 50 feet | 40 feet | 30 feet | |
Each Side | 25 feet | 20 feet | 15 feet | |
Buffer Yard (depth) | 10 feet | 10 feet | 10 feet | |
Maximum Regulations | On-Lot Sewage And Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities | |
|---|---|---|---|---|
Building Height | 35 feet | 35 feet | 35 feet | |
Lot Coverage | 20% | 30% | 40% | |
Minimum Regulations | On-Lot Sewage And Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities |
|---|---|---|---|
Lot Area | 80,000 square feet | 50,000 square feet | 30,000 square feet |
Lot Width | 200 feet | 150 feet | 120 feet |
Building Setback | 60 feet | 60 feet | 60 feet |
Rear Yard | 60 feet | 50 feet | 50 feet |
Side Yard Total | 60 feet | 60 feet | 30 feet |
Each Yard | 30 feet | 30 feet | 15 feet |
Improvement Setback | 20 feet | 20 feet | 10 feet |
Buffer Yard (Depth) | 10 feet | 10 feet | 10 feet |
Landscaped Area | 50% | 40% | 30% |
Maximum Regulations | On-Lot Sewage And Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities |
|---|---|---|---|
Building Height | 50 feet | 50 feet | 50 feet |
Lot Coverage | 30% | 30% | 40% |
Paved Area | 40% | 50% | 60% |
Minimum Regulations | |||
|---|---|---|---|
Lot Area | 3 acres | ||
Lot Width | 250 feet | ||
Building Setback | 80 feet | ||
Rear Yard | 50 feet | ||
Side Yard | |||
Total | 80 feet | ||
One Side | 40 feet | ||
Improvement Setback | 30 feet | ||
Buffer Yard (Depth) | 20 feet | ||
Landscaped Area | 30% | ||
Maximum Regulations | |||
|---|---|---|---|
Building Height | 50 feet | ||
Lot Coverage | 40% | ||
Paved Area | 60% | ||
Minimum Regulations | |||
|---|---|---|---|
Lot Area | 3 acres | ||
Lot Width | 250 feet | ||
Building Setback | 80 feet | ||
Rear Yard | 50 feet | ||
Side Yard | |||
Total | 80 feet | ||
One Side | 40 feet | ||
Improvement Setback | 30 feet | ||
Buffer Yard (Depth) | 20 feet | ||
Landscaped Area | 30% | ||
Maximum Regulations | |||
|---|---|---|---|
Building Height | 50 feet | ||
Lot Coverage | 40% | ||
Paved Area | 60% | ||
Minimum Regulations | ||
|---|---|---|
Construction Site Area | 40 acres | |
Construction Site Contiguous Lot Width Building Setbacks | 200 feet | |
Perimeter of PBOI Zoning District, including existing streets | 100 feet | |
Existing Residential Use | 100 feet | |
Improvement Setback | ||
Perimeter of PBOI District, including existing streets | 75 feet | |
Existing Residential Use | 75 feet | |
Buffer Yard | ||
Perimeter of PBOI District, including existing streets | 25 feet | |
Existing Residential Use | 25 feet | |
Landscaped Area of Construction Site | 20% | |
Maximum Regulations | ||
|---|---|---|
Building Height | 75 feet | |
Impervious Area of Construction Site | 80% | |
Minimum Regulations | On-Lot Sewage and Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities | |
|---|---|---|---|---|
Lot Area | 80,000 square feet | 30,000 square feet | 12,000 square feet | |
Lot Width | 200 feet | 125 feet | 100 feet | |
Building Setback* | 30 feet | 30 feet | 30 feet | |
Rear Yard | 30 feet | 20 feet | 20 feet | |
Side Yard | ||||
Total | 50 feet | 40 feet | 30 feet | |
Each Side | 25 feet | 20 feet | 15 feet | |
Buffer Yard (depth) | 10 feet | 10 feet | 10 feet | |
Maximum Regulations | On-Lot Sewage and Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities | |
|---|---|---|---|---|
Building Height 35 feet | 35 feet | 35 feet | ||
Lot Coverage 20% | 30% | 40% | ||
* | The building setback shall not apply in the event there are existing structures located within 30 feet of the ultimate right-of-way on any one of the three adjoining lots on either side of the subject lot. In such cases, the minimum setback shall be equal to the setback of the structure closest to the road but located no closer than the line of the ultimate right-of-way. |
Minimum Regulations | On-Lot Sewage and Water Facilities | Public or Community Sewage Facilities | Public or Community Sewage and Water Facilities |
|---|---|---|---|
Lot Area | 80,000 square feet | 40,000 square feet | 20,000 square feet |
Lot Width | 200 feet | 150 feet | 100 feet |
Building Setback* | 30 feet | 30 feet | 30 feet |
Rear Yard | 30 feet | 30 feet | 20 feet |
Side Yard Total | 50 feet | 40 feet | 30 feet |
Each Yard | 25 feet | 20 feet | 15 feet |
Improvement Setback | 20 feet | 10 feet | 10 feet |
Buffer Yard (depth) | 10 feet | 10 feet | 10 feet |
Landscaped Area | 50% | 40% | 30% |
Maximum Regulations | |||
|---|---|---|---|
Building Height 35 feet | 35 feet | 35 feet | |
Lot Coverage | 30% | 30% | 40% |
Paved Area | 40% | 50% | 60% |
* | The building setback shall not apply in the event there are existing structures located within 30 feet of the ultimate right-of-way on any one of the three adjoining lots on either side of the subject lot. In such cases, the minimum setback shall be equal to the setback of the structure closest to the road but located no closer than the line of the ultimate right-of-way. |