Water supply. If the water is to be supplied from the site and a flow of 100,000 gallons per day or less is required, an impact assessment of water supply is required if the anticipated demand exceeds the available safe yield of the aquifer contained within the property limits indicated in the Borough's resource inventory. In such case the applicant must substantiate and explain the anticipated demand, present proof that the aquifer contained within the property limits can yield the desired amount of water, demonstrate that wells proposed for installation will meet acceptable standards and assess the effect of proposed withdrawals on existing and proposed wells and surface water bodies within the geologic formation. If the plan includes 50 or more dwelling units, certification of the adequacy of the proposed water supply and sewerage facilities must be obtained from the New Jersey Department of Environmental Protection and must be included in the EIS.
If the water is to be supplied from any existing private or public facility, the identification, owner and location of the facility and the location of existing distribution point to which the proposed project would be connected shall be provided. The applicant will submit documentary proof that the facility has the available excess capacity in terms of its allowable diversion and equipment to supply the proposed project and is willing to do so. The applicant must demonstrate to the satisfaction of the Planning Board or Board of Adjustment that the total consumption of groundwater from on-site and off-site sources will not exceed the available safe yield of the aquifer contained within the property limits.