DEVELOPMENT PLAN REQUIREMENTS
Effective on: 1/1/1901
Land subject to flood hazard, improper drainage, erosion or that is for topographical or other reasons unsuitable for residential use as determined by the City of Belmont, shall not be platted or developed for residential use nor for any other uses that will continue or increase the danger to health, safety, or property unless the hazards can be and are corrected.
The land designated within Special Flood Hazard Area zones and Floodway Areas in Zone AE subject to periodic inundation by 100-year flood as shown on FEMA flood insurance rate maps for the Belmont area shall be identified on all plats. Land designated as Special Flood Hazard Area Flood Zone shall be built on only in accordance with the City of Belmont Flood Damage Prevention Ordinance. No grading, clearing, removal of significant vegetation, the placement of structures, fill, or any other encroachment activity shall occur within designated Special Flood Hazard Area zones which would interfere with the natural water course without approval from the City of Belmont Planning Director based upon certification that such activity mitigates the potential adverse impact of flood hazard. Streets and utility lines and structures may be placed within the flood hazard area only if their elevation is raised above maximum flood heights or if they are otherwise flood protected.
All land located within the designated Water Supply Watershed Protection District as shown on the official Belmont Watershed Protection Map shall comply with all provisions of this Ordinance regarding Watershed Protection. The Watershed Protection provisions of this Ordinance shall take precedence over all other provisions of this ordinance with regard to density, open space dedication, and built-upon areas.
Areas that have been used for the disposal of solid waste shall not be subdivided into commercial or residential building sites. This includes areas that have been used for the disposal of trash, demolition waste, construction debris, stumps, and other waste materials.
Effective on: 1/1/1901
Effective on: 1/1/1901
Where the designation of certain significant topographical features is shown on the City of Belmont Parks and Recreation Master Plan or similarly adopted plan, all new development involving the subdivision of land under this Chapter shall make every effort to reserve those features as dedicated open space. Any open space dedication proposed to the City of Belmont or other entity as allowable by LDC Chapter 7.3.8 requires verification of planned acceptance (along with any required conditions) prior to approval of schematic plans and/or submittal of construction plan documents. The reservation of designated open space areas shall count towards the open space dedication requirements set forth in this Ordinance.
Where a proposed Development Plan includes any part of a City street or thoroughfare which has been designated as such on the official Thoroughfare Plan adopted by the City, North Carolina Department of Transportation, or Gaston-Cleveland-Lincoln Metropolitan Planning Organization (GCLMPO), or as part of any Transportation Plan adopted by the City of Belmont, a right-of-way shall be platted in the location shown on the Plan at the width specified in this Ordinance.
As a condition of approval, the Developer shall be required to construct the proposed street or thoroughfare within the borders of their Development in accordance with the adopted standards or plans for such construction. In instances where such a street is scheduled for construction by the City or the North Carolina Department of Transportation, the Developer may make a payment in lieu of construction equal to his pro-rata share of the costs of construction. Major thoroughfares and Interstate highway construction are exempted from this requirement.
If the City of Belmont or Gaston County Board of Education has determined the specific location and size of any school site or other public building to be reserved and if this information appears in any comprehensive plan over which other local governments have jurisdiction, the Planning Department shall immediately notify the appropriate authority if all or part of the reserved location is included in the proposed subdivision. The responsible authority shall promptly decide whether it still wishes the site to be reserved. The responsible authority shall then have eighteen (18) months beginning upon the date of final plat approval within which to acquire the site as provided in G.S. 160D-804. If the Belmont City Council, the Board of Education, or any other local government having jurisdiction has not accepted, purchased or begun proceedings to condemn the site within eighteen (18) months, the developer may treat the land as freed from reservation unless otherwise specified through conditional zoning, development agreement, or other acceptable documentation.
If the total development size exceeds two hundred (200) acres or five hundred (500) housing units, the developer shall reserve adequate (minimum of 16 usable acres) prominent sites for the location of schools. Sites reserved for civic uses may include up to one-half (½) of their total area towards the open space dedication requirement.
(TA2020.02, passed 05/04/2020; TA2025.01, passed 06/02/2025)
Effective on: 6/2/2025
For the sketch plan and schematic design review phase, the environmental survey requirements are:
Effective on: 1/1/1901
Effective on: 1/1/1901
In additional to information on the Environmental Survey, the sketch plan shall show in simple sketch form the proposed layout of streets, lots, buildings, public open spaces, and other features in relation to existing conditions. It shall also include the following information:
The size and number of completed applications shall be set by the Technical Review Committee.
(TA2025.01, passed 06/02/2025)
Effective on: 6/2/2025
In addition to the above required information, the following additional information may be required by the Planning Director or designee, the Planning Board, or the City Council on a discretionary site-specific basis:
(TA2025.01, passed 06/02/2025)
Effective on: 6/2/2025
The size and number of completed applications shall be set by the Technical Review Committee. No certifications other than the Certificate of Survey and Accuracy as in Section 16.12 (K) (1) must be provided in connection with the submission.
Construction Drawings must be drawn to the following specifications and must contain or be accompanied by the applicable information listed below. No processing or review of Construction Documents will proceed without all of the following information:
In addition to the above required information, the following additional information may be necessary for unique sites:
(TA2020.02, passed 05/04/2020; TA2025.01, passed 06/02/2025)
Effective on: 6/2/2025
Effective on: 1/1/1901
Effective on: 1/1/1901
No Final Plat shall be approved unless and until the subdivider has installed in the platted area all improvements required by this ordinance or has posted Improvement Guarantees in accordance with CHAPTER 15. The Final Plat shall contain the following:
"Any construction or use within the areas delineated as floodway are subject to the restrictions imposed by the Belmont Flood Damage Prevention Ordinance."
| |
| ___________________________________________ Surveyor | |
Official Seal |
___________________________________________ |
I (officer authorized to take acknowledgments) do hereby certify that (name of registered surveyor) personally appeared before me this day and acknowledged the due execution of this certificate. Witness my hand and (where an official seal is required by law) official seal this ___ day of_____, A.D., ______ (year).
| |
Official Seal | ____________________________________________ Signature of Officer |
| |
______________________ |
___________________________________________ |
| |
______________________ |
___________________________________________ |
| |
______________________ Belmont |
___________________________________________ |
OR
| |
______________________ |
________________________________________________ |
The following Certificate shall be placed on the final plat only when the proposed subdivision is not to be connected to publicly owned and operated water supply and sewage disposal systems.
| |
______________________ |
________________________________________________ |
All plats approved in the City of Belmont’s jurisdiction must have one of the following Watershed Certificates on the final plat:
| |
______________________ |
________________________________________________ |
OR
| |
______________________ |
________________________________________________ |
OR
| |
______________________ |
________________________________________________ |
| |
______________________ |
___________________________________________ |
| |
APPROVED: ________________________________ | DATE: __________________ |
Effective on: 1/1/1901
In addition, for the purpose of identification and protection of survey corners and monuments, each corner or monument within the subdivision shall have a disk attached to a ferrous rod or placed in concrete that shall be stamped to identify that point as a property corner and or control point. All monuments shall be set flush with or just below ground level and shall be made of durable materials. In addition ferrous materials will be present in sufficient mass either in the monument or in close proximity to the monument to allow for detection by electronic metal detection devices. The City Engineer will inspect all monuments prior to final approval of the subdivision.
Effective on: 1/1/1901
The TMA must be signed by the applicant, City and the NCDOT District or Division Engineer if the mitigation involves a state roadway. All off-site ROW areas shall be acquired and dedicated prior to approval of construction documents, and required mitigation measures must be implemented prior to final Certificate of Occupancy (CO) as identified in the TIA phasing plan, or the applicant(s) shall provide a payment-in-lieu in accordance with Section H (18).
The applicant shall be required to identify mitigation improvements to the roadway network if at least one of the following conditions exists when comparing future year background conditions to future year build-out conditions:
If the background LOS (intersection or approach) is inadequate (i.e., “D,” "E," or F"), the applicant will be expected to mitigate only the impact caused by the proposed project. For example if the background LOS of an approach is LOS F with 85 seconds of delay, and the project traffic increases the delay to 95 seconds at LOS F, the applicant will be required to mitigate the added 10 seconds of delay on the approach, not required to mitigate the inadequate background delay. City staff and NCDOT will review the recommendations in the final version of the TIA and will have the ultimate determination in the scope of the required mitigation measures.
For multi-phase developments, the capacity analyses scenarios shall address the phasing of improvements for each phase of development. The build-out + 5 scenario will require the analysis of only five years beyond the full build-out year. The build-out + 5 scenario analysis is not used for mitigation purposes. A narrative and table shall be prepared that summarizes the methodology and measured conditions at the intersections reported in LOS (LOS A–F) and average control delay for each intersection and approach.
A narrative and map shall also be prepared that describes and illustrates recommended improvements, by development phase if necessary, for mitigating the projected impact of the proposed development.
For multi-phase projects, requests for payment-in-lieu consideration at the time of schematic plan approval shall be limited to the first phase of development.
All payment-in-lieu requests shall include cost estimate calculations prepared by the applicant that meet the following standards:
Any requests for payment-in-lieu received following a schematic plan approval and associated traffic mitigation agreement (TMA) shall be considered an as amendment to the approved plans.
If City Council, at its discretion, agrees to accept payment-in-lieu of transportation improvements for a development, the exact payment amount shall be verified at the time of construction plan review and shall meet the following standards:
All calculated cost estimates shall not be more than two years old at the time of acceptance by the city, and payment must be received prior to approval of the associated construction plans.
| Figure 1 – South Point Peninsula Area |
![]() |
(TA2021.03, passed 10/11/2021)
Effective on: 10/11/2021
DEVELOPMENT PLAN REQUIREMENTS
Effective on: 1/1/1901
Land subject to flood hazard, improper drainage, erosion or that is for topographical or other reasons unsuitable for residential use as determined by the City of Belmont, shall not be platted or developed for residential use nor for any other uses that will continue or increase the danger to health, safety, or property unless the hazards can be and are corrected.
The land designated within Special Flood Hazard Area zones and Floodway Areas in Zone AE subject to periodic inundation by 100-year flood as shown on FEMA flood insurance rate maps for the Belmont area shall be identified on all plats. Land designated as Special Flood Hazard Area Flood Zone shall be built on only in accordance with the City of Belmont Flood Damage Prevention Ordinance. No grading, clearing, removal of significant vegetation, the placement of structures, fill, or any other encroachment activity shall occur within designated Special Flood Hazard Area zones which would interfere with the natural water course without approval from the City of Belmont Planning Director based upon certification that such activity mitigates the potential adverse impact of flood hazard. Streets and utility lines and structures may be placed within the flood hazard area only if their elevation is raised above maximum flood heights or if they are otherwise flood protected.
All land located within the designated Water Supply Watershed Protection District as shown on the official Belmont Watershed Protection Map shall comply with all provisions of this Ordinance regarding Watershed Protection. The Watershed Protection provisions of this Ordinance shall take precedence over all other provisions of this ordinance with regard to density, open space dedication, and built-upon areas.
Areas that have been used for the disposal of solid waste shall not be subdivided into commercial or residential building sites. This includes areas that have been used for the disposal of trash, demolition waste, construction debris, stumps, and other waste materials.
Effective on: 1/1/1901
Effective on: 1/1/1901
Where the designation of certain significant topographical features is shown on the City of Belmont Parks and Recreation Master Plan or similarly adopted plan, all new development involving the subdivision of land under this Chapter shall make every effort to reserve those features as dedicated open space. Any open space dedication proposed to the City of Belmont or other entity as allowable by LDC Chapter 7.3.8 requires verification of planned acceptance (along with any required conditions) prior to approval of schematic plans and/or submittal of construction plan documents. The reservation of designated open space areas shall count towards the open space dedication requirements set forth in this Ordinance.
Where a proposed Development Plan includes any part of a City street or thoroughfare which has been designated as such on the official Thoroughfare Plan adopted by the City, North Carolina Department of Transportation, or Gaston-Cleveland-Lincoln Metropolitan Planning Organization (GCLMPO), or as part of any Transportation Plan adopted by the City of Belmont, a right-of-way shall be platted in the location shown on the Plan at the width specified in this Ordinance.
As a condition of approval, the Developer shall be required to construct the proposed street or thoroughfare within the borders of their Development in accordance with the adopted standards or plans for such construction. In instances where such a street is scheduled for construction by the City or the North Carolina Department of Transportation, the Developer may make a payment in lieu of construction equal to his pro-rata share of the costs of construction. Major thoroughfares and Interstate highway construction are exempted from this requirement.
If the City of Belmont or Gaston County Board of Education has determined the specific location and size of any school site or other public building to be reserved and if this information appears in any comprehensive plan over which other local governments have jurisdiction, the Planning Department shall immediately notify the appropriate authority if all or part of the reserved location is included in the proposed subdivision. The responsible authority shall promptly decide whether it still wishes the site to be reserved. The responsible authority shall then have eighteen (18) months beginning upon the date of final plat approval within which to acquire the site as provided in G.S. 160D-804. If the Belmont City Council, the Board of Education, or any other local government having jurisdiction has not accepted, purchased or begun proceedings to condemn the site within eighteen (18) months, the developer may treat the land as freed from reservation unless otherwise specified through conditional zoning, development agreement, or other acceptable documentation.
If the total development size exceeds two hundred (200) acres or five hundred (500) housing units, the developer shall reserve adequate (minimum of 16 usable acres) prominent sites for the location of schools. Sites reserved for civic uses may include up to one-half (½) of their total area towards the open space dedication requirement.
(TA2020.02, passed 05/04/2020; TA2025.01, passed 06/02/2025)
Effective on: 6/2/2025
For the sketch plan and schematic design review phase, the environmental survey requirements are:
Effective on: 1/1/1901
Effective on: 1/1/1901
In additional to information on the Environmental Survey, the sketch plan shall show in simple sketch form the proposed layout of streets, lots, buildings, public open spaces, and other features in relation to existing conditions. It shall also include the following information:
The size and number of completed applications shall be set by the Technical Review Committee.
(TA2025.01, passed 06/02/2025)
Effective on: 6/2/2025
In addition to the above required information, the following additional information may be required by the Planning Director or designee, the Planning Board, or the City Council on a discretionary site-specific basis:
(TA2025.01, passed 06/02/2025)
Effective on: 6/2/2025
The size and number of completed applications shall be set by the Technical Review Committee. No certifications other than the Certificate of Survey and Accuracy as in Section 16.12 (K) (1) must be provided in connection with the submission.
Construction Drawings must be drawn to the following specifications and must contain or be accompanied by the applicable information listed below. No processing or review of Construction Documents will proceed without all of the following information:
In addition to the above required information, the following additional information may be necessary for unique sites:
(TA2020.02, passed 05/04/2020; TA2025.01, passed 06/02/2025)
Effective on: 6/2/2025
Effective on: 1/1/1901
Effective on: 1/1/1901
No Final Plat shall be approved unless and until the subdivider has installed in the platted area all improvements required by this ordinance or has posted Improvement Guarantees in accordance with CHAPTER 15. The Final Plat shall contain the following:
"Any construction or use within the areas delineated as floodway are subject to the restrictions imposed by the Belmont Flood Damage Prevention Ordinance."
| |
| ___________________________________________ Surveyor | |
Official Seal |
___________________________________________ |
I (officer authorized to take acknowledgments) do hereby certify that (name of registered surveyor) personally appeared before me this day and acknowledged the due execution of this certificate. Witness my hand and (where an official seal is required by law) official seal this ___ day of_____, A.D., ______ (year).
| |
Official Seal | ____________________________________________ Signature of Officer |
| |
______________________ |
___________________________________________ |
| |
______________________ |
___________________________________________ |
| |
______________________ Belmont |
___________________________________________ |
OR
| |
______________________ |
________________________________________________ |
The following Certificate shall be placed on the final plat only when the proposed subdivision is not to be connected to publicly owned and operated water supply and sewage disposal systems.
| |
______________________ |
________________________________________________ |
All plats approved in the City of Belmont’s jurisdiction must have one of the following Watershed Certificates on the final plat:
| |
______________________ |
________________________________________________ |
OR
| |
______________________ |
________________________________________________ |
OR
| |
______________________ |
________________________________________________ |
| |
______________________ |
___________________________________________ |
| |
APPROVED: ________________________________ | DATE: __________________ |
Effective on: 1/1/1901
In addition, for the purpose of identification and protection of survey corners and monuments, each corner or monument within the subdivision shall have a disk attached to a ferrous rod or placed in concrete that shall be stamped to identify that point as a property corner and or control point. All monuments shall be set flush with or just below ground level and shall be made of durable materials. In addition ferrous materials will be present in sufficient mass either in the monument or in close proximity to the monument to allow for detection by electronic metal detection devices. The City Engineer will inspect all monuments prior to final approval of the subdivision.
Effective on: 1/1/1901
The TMA must be signed by the applicant, City and the NCDOT District or Division Engineer if the mitigation involves a state roadway. All off-site ROW areas shall be acquired and dedicated prior to approval of construction documents, and required mitigation measures must be implemented prior to final Certificate of Occupancy (CO) as identified in the TIA phasing plan, or the applicant(s) shall provide a payment-in-lieu in accordance with Section H (18).
The applicant shall be required to identify mitigation improvements to the roadway network if at least one of the following conditions exists when comparing future year background conditions to future year build-out conditions:
If the background LOS (intersection or approach) is inadequate (i.e., “D,” "E," or F"), the applicant will be expected to mitigate only the impact caused by the proposed project. For example if the background LOS of an approach is LOS F with 85 seconds of delay, and the project traffic increases the delay to 95 seconds at LOS F, the applicant will be required to mitigate the added 10 seconds of delay on the approach, not required to mitigate the inadequate background delay. City staff and NCDOT will review the recommendations in the final version of the TIA and will have the ultimate determination in the scope of the required mitigation measures.
For multi-phase developments, the capacity analyses scenarios shall address the phasing of improvements for each phase of development. The build-out + 5 scenario will require the analysis of only five years beyond the full build-out year. The build-out + 5 scenario analysis is not used for mitigation purposes. A narrative and table shall be prepared that summarizes the methodology and measured conditions at the intersections reported in LOS (LOS A–F) and average control delay for each intersection and approach.
A narrative and map shall also be prepared that describes and illustrates recommended improvements, by development phase if necessary, for mitigating the projected impact of the proposed development.
For multi-phase projects, requests for payment-in-lieu consideration at the time of schematic plan approval shall be limited to the first phase of development.
All payment-in-lieu requests shall include cost estimate calculations prepared by the applicant that meet the following standards:
Any requests for payment-in-lieu received following a schematic plan approval and associated traffic mitigation agreement (TMA) shall be considered an as amendment to the approved plans.
If City Council, at its discretion, agrees to accept payment-in-lieu of transportation improvements for a development, the exact payment amount shall be verified at the time of construction plan review and shall meet the following standards:
All calculated cost estimates shall not be more than two years old at the time of acceptance by the city, and payment must be received prior to approval of the associated construction plans.
| Figure 1 – South Point Peninsula Area |
![]() |
(TA2021.03, passed 10/11/2021)
Effective on: 10/11/2021