Establishment of Zones
Suburban Residential Zones to be known as SR Zones. |
Coastal Residential Zones to be known as CR Zones. |
Residential Zones to be known as R Zones. |
Business Zones to be known as B Zones. |
Industrial Zones to be known as I Zones. |
Waterfront Zones to be known as W Zones. |
Rural-Farm Zones to be known as R-F Zones. |
Limited Rural-Farm Zones to be known as LR-F Zones. |
Medical Zones to be known as M Zones. |
Shoreland Zones to be known as RP-1, RP, LR, GD-1, GD-2, CFMA, and LC Zones. |
Contract Zones to be known as CZ Zones. |
Institutional Zones to be known as IN Zones. |
Office Residential Zones to be known as OR Zones. |
Main Street Revitalization District zones to be known as MSRD Zones. |
Aquifer Protection Overlay Zones to be known as APO Zones. |
R-1-A: These areas are limited to single-family and duplex/two-family residential uses These areas are served by water and sewer. These districts are best characterized as in-town single-family and duplex/two-family neighborhoods. | |
R-1-B: These areas are limited to single-family and duplex/two-family residential uses. These areas are served by water and sewer. These districts are best characterized as in-town single-family and duplex/two-family neighborhoods. | |
R-2: These areas are higher-density multifamily neighborhoods which allow for a mixture of residential uses. These areas are served by water and sewer. | |
R-3: This zone is intended to provide maximum flexibility in terms of residential use; it allows for a mixture of housing types on varying lot sizes. |
B-1: This in the in-town commercial area. It allows for a mixture of commercial and multifamily residential uses. The intent is to support commercial activities to the maximum extent possible, while providing space and opportunities to develop multifamily housing in vacant factory structures and the upper stories of the existing and new structures. | |
B-2: These are highway-oriented commercial areas. Residential development is prohibited from this zone. |
I-1: This district allows for general commercial and industrial uses. | |
I-2: A more defined industrial zone that allows for selected industrial uses. Requires review/recommendation by the Economic Improvement Commission. | |
I-3: Is a gateway zone for a major entrance to the City, as such, appearance of structures and properties is a major consideration in the Planning Board's review process. Land use proposals in this area must meet more stringent design and landscaping standards; facades of new or rehabilitated structures shall be of brick or stone, other materials may be considered on a case-by-case basis; residential styled structures may be allowed on a case-by-case basis. The general zone allows a mixture of commercial and industrial uses. Exterior storage and display is prohibited except on those parcels of land that abut Pomerleau Street but do not abut either Barra Road or Alfred street (Route 111). |
W-1: Allows for a mixture of water-dependent or oriented commercial uses, including residential uses. | |
W-2: Allows for commercial water-dependent uses. | |
W-3: The Biddeford Pool Village Waterfront Zone that allows both water and non-water dependent or oriented commercial uses, including residential uses. |
MSRD-1: The commercial core district where the intent is to preserve the historic character of Biddeford while promoting the growth of businesses and residences in the district. | |
MSRD-2: The residential conservation district where the intent is to provide for areas of medium density while preserving the residential and historical character of the existing buildings while still providing opportunities for maintenance and remodeling of residences. | |
MSRD-3: The high-density and mixed-use district where the intent is to preserve the historic character of buildings while facilitating the redevelopment of vacant and underused mill buildings into a vibrant residential and commercial community which contributes to the revitalization of the City’s downtown. |
Table C Lot Size Requirements for Coastal Residential (CR) District | |||
|---|---|---|---|
The minimum area in square feet required for single-family residential use as permitted in this zone shall be according to the following4, 5: | |||
Chart 9B1 Minimum Square Feet Lot Size2 | |||
Soil Profile1 | Soil Condition | ||
A | B | C | |
1 | 40,000 | 30,000 | 30,000 |
2 | 30,000 | 25,000 | 30,000 |
3 | 30,000 | 30,000 | 35,000 |
4 | 25,000 | 20,000 | 25,000 |
5 | 40,000 | 40,000 | 80,000 |
6 | 40,000 | 40,000 | 80,000 |
7 | 35,000 | 35,000 | 35,000 |
8 | 30,000 | 30,000 | 30,000 |
9 | 35,000 | 35,000 | 35,000 |
NOTES: | ||
|---|---|---|
1 | Soil condition and soil profile as indicated on the application for the private wastewater disposal system (Form HE 200). | |
2 | Source: Appendix E. Subsurface Wastewater Disposal Rules. | |
3 | The above square foot requirements are established for lots created within the Coastal Residential Zone requiring the use of private subsurface sewage disposal systems and served by a municipal water supply. | |
4 | For lots not served by municipal water supply, the minimum lot size within this zone shall be 80,000 square feet. | |
5 | For lots served by municipal sewer, the minimum lot size within this zone shall be 20,000 square feet. | |
The Code Enforcement Officer may grant administrative variances for setbacks within the Coastal Residential (CR) Zone under the following conditions: | ||
1. | Lots existed prior to June 8, 1988; | |
2. | Are in separate ownership from abutting lots or parcels; | |
3. | The setback variances shall result in a situation where the setback shall be no less than: | |
Front yard: 40 feet; | ||
Side and rear yard setbacks: 10 feet. | ||
The Code Enforcement Officer shall document the reasons for his decision and maintain on file with any other pertinent information pertaining to the issue and property. | ||
Determination of the adequacy of visual screening shall be based on line of sight observations from existing structures. Upon request of the Planning Board the proponent of the zone change shall present an accurate vertical and horizontal control map depicting existing buildings and structures adjacent to the proposed contract and zone base elevation and proposed improvements in the proposed zone change area. | |
The following adjustments to the MDEP Site Location of Development methodology apply to the required groundwater analysis: |
In its review of projects in the institutional zone, the Planning Board shall be guided by the approved institutional master plan and shall not impose conditions or requirements on an applicant that are in conflict with the approved institutional master plan. In those areas where the master plan addresses issues that are also covered by site plan review, the Planning Board shall be guided by the overall direction provided in the approved institutional master plan and shall limit the scope of its review under the site plan provisions to how the projects contained in the master plan are designed and constructed to conform to the standards of Section B of Article XI. The following chart outlines the respective areas of concern for the review of an institutional master plan and the site plans for individual projects contained in the master plan for those areas covered in both reviews: |
Review Topic | Institutional Master Plan Review Focus | Site Plan Review Focus | |
|---|---|---|---|
Buildings, athletic facilities, and supporting structures | The need for the facilities is related to program growth and changes supported in the master plan, and the general sizes and locations are appropriate based upon those needs | The buildings and/or facilities generally conform to the approved master plan and meet the specific zoning and site plan review standards | |
Road network and traffic | The primary road network providing access to the campus and within the campus will be adequate to handle the anticipated increase in traffic safely and efficiently while minimizing the impact on other users as a result of the identified improvements | Any road or traffic improvements that are identified in the overall traffic management program in the master plan that are needed to support the specific development project will be built and will meet the technical standards set out in the ordinance | |
Parking | The amount of parking and general parking locations will be adequate to accommodate the anticipated increase in parking demand resulting from the growth and changes anticipated in the master plan | Any parking improvements that are identified in the overall parking program in the master plan that are needed to support the specific development project will be built and will meet the technical standards set out in the ordinance | |
Water and sewer | The water and sewer systems will be adequate to accommodate the anticipated increase in demand resulting from the growth and changes anticipated in the master plan | The location and design of the water and sewer facilities associated with the specific development proposal are consistent with the master plan and meet the technical standards set out in the ordinance | |
Landscaping, lighting, signs, noise, scenic views | The master plan establishes appropriate standards for the design of these elements and to minimize the impact on surrounding neighborhoods | The location and design of these elements are consistent with the standards set out in the master plan and meet any other applicable technical standards set out in the ordinance | |
Pedestrian and bicycle facilities | The pedestrian and bicycle facilities will be adequate to accommodate the anticipated increase in demand resulting from the growth and changes anticipated in the master plan and standards are established for the design of these elements | The location and design of these elements are consistent with the master plan, meet the standards set out in the master plan, and any other technical standards set out in ordinance |
The institutional master plan shall contain at least the following information and exhibits: |
Establishment of Zones
Suburban Residential Zones to be known as SR Zones. |
Coastal Residential Zones to be known as CR Zones. |
Residential Zones to be known as R Zones. |
Business Zones to be known as B Zones. |
Industrial Zones to be known as I Zones. |
Waterfront Zones to be known as W Zones. |
Rural-Farm Zones to be known as R-F Zones. |
Limited Rural-Farm Zones to be known as LR-F Zones. |
Medical Zones to be known as M Zones. |
Shoreland Zones to be known as RP-1, RP, LR, GD-1, GD-2, CFMA, and LC Zones. |
Contract Zones to be known as CZ Zones. |
Institutional Zones to be known as IN Zones. |
Office Residential Zones to be known as OR Zones. |
Main Street Revitalization District zones to be known as MSRD Zones. |
Aquifer Protection Overlay Zones to be known as APO Zones. |
R-1-A: These areas are limited to single-family and duplex/two-family residential uses These areas are served by water and sewer. These districts are best characterized as in-town single-family and duplex/two-family neighborhoods. | |
R-1-B: These areas are limited to single-family and duplex/two-family residential uses. These areas are served by water and sewer. These districts are best characterized as in-town single-family and duplex/two-family neighborhoods. | |
R-2: These areas are higher-density multifamily neighborhoods which allow for a mixture of residential uses. These areas are served by water and sewer. | |
R-3: This zone is intended to provide maximum flexibility in terms of residential use; it allows for a mixture of housing types on varying lot sizes. |
B-1: This in the in-town commercial area. It allows for a mixture of commercial and multifamily residential uses. The intent is to support commercial activities to the maximum extent possible, while providing space and opportunities to develop multifamily housing in vacant factory structures and the upper stories of the existing and new structures. | |
B-2: These are highway-oriented commercial areas. Residential development is prohibited from this zone. |
I-1: This district allows for general commercial and industrial uses. | |
I-2: A more defined industrial zone that allows for selected industrial uses. Requires review/recommendation by the Economic Improvement Commission. | |
I-3: Is a gateway zone for a major entrance to the City, as such, appearance of structures and properties is a major consideration in the Planning Board's review process. Land use proposals in this area must meet more stringent design and landscaping standards; facades of new or rehabilitated structures shall be of brick or stone, other materials may be considered on a case-by-case basis; residential styled structures may be allowed on a case-by-case basis. The general zone allows a mixture of commercial and industrial uses. Exterior storage and display is prohibited except on those parcels of land that abut Pomerleau Street but do not abut either Barra Road or Alfred street (Route 111). |
W-1: Allows for a mixture of water-dependent or oriented commercial uses, including residential uses. | |
W-2: Allows for commercial water-dependent uses. | |
W-3: The Biddeford Pool Village Waterfront Zone that allows both water and non-water dependent or oriented commercial uses, including residential uses. |
MSRD-1: The commercial core district where the intent is to preserve the historic character of Biddeford while promoting the growth of businesses and residences in the district. | |
MSRD-2: The residential conservation district where the intent is to provide for areas of medium density while preserving the residential and historical character of the existing buildings while still providing opportunities for maintenance and remodeling of residences. | |
MSRD-3: The high-density and mixed-use district where the intent is to preserve the historic character of buildings while facilitating the redevelopment of vacant and underused mill buildings into a vibrant residential and commercial community which contributes to the revitalization of the City’s downtown. |
Table C Lot Size Requirements for Coastal Residential (CR) District | |||
|---|---|---|---|
The minimum area in square feet required for single-family residential use as permitted in this zone shall be according to the following4, 5: | |||
Chart 9B1 Minimum Square Feet Lot Size2 | |||
Soil Profile1 | Soil Condition | ||
A | B | C | |
1 | 40,000 | 30,000 | 30,000 |
2 | 30,000 | 25,000 | 30,000 |
3 | 30,000 | 30,000 | 35,000 |
4 | 25,000 | 20,000 | 25,000 |
5 | 40,000 | 40,000 | 80,000 |
6 | 40,000 | 40,000 | 80,000 |
7 | 35,000 | 35,000 | 35,000 |
8 | 30,000 | 30,000 | 30,000 |
9 | 35,000 | 35,000 | 35,000 |
NOTES: | ||
|---|---|---|
1 | Soil condition and soil profile as indicated on the application for the private wastewater disposal system (Form HE 200). | |
2 | Source: Appendix E. Subsurface Wastewater Disposal Rules. | |
3 | The above square foot requirements are established for lots created within the Coastal Residential Zone requiring the use of private subsurface sewage disposal systems and served by a municipal water supply. | |
4 | For lots not served by municipal water supply, the minimum lot size within this zone shall be 80,000 square feet. | |
5 | For lots served by municipal sewer, the minimum lot size within this zone shall be 20,000 square feet. | |
The Code Enforcement Officer may grant administrative variances for setbacks within the Coastal Residential (CR) Zone under the following conditions: | ||
1. | Lots existed prior to June 8, 1988; | |
2. | Are in separate ownership from abutting lots or parcels; | |
3. | The setback variances shall result in a situation where the setback shall be no less than: | |
Front yard: 40 feet; | ||
Side and rear yard setbacks: 10 feet. | ||
The Code Enforcement Officer shall document the reasons for his decision and maintain on file with any other pertinent information pertaining to the issue and property. | ||
Determination of the adequacy of visual screening shall be based on line of sight observations from existing structures. Upon request of the Planning Board the proponent of the zone change shall present an accurate vertical and horizontal control map depicting existing buildings and structures adjacent to the proposed contract and zone base elevation and proposed improvements in the proposed zone change area. | |
The following adjustments to the MDEP Site Location of Development methodology apply to the required groundwater analysis: |
In its review of projects in the institutional zone, the Planning Board shall be guided by the approved institutional master plan and shall not impose conditions or requirements on an applicant that are in conflict with the approved institutional master plan. In those areas where the master plan addresses issues that are also covered by site plan review, the Planning Board shall be guided by the overall direction provided in the approved institutional master plan and shall limit the scope of its review under the site plan provisions to how the projects contained in the master plan are designed and constructed to conform to the standards of Section B of Article XI. The following chart outlines the respective areas of concern for the review of an institutional master plan and the site plans for individual projects contained in the master plan for those areas covered in both reviews: |
Review Topic | Institutional Master Plan Review Focus | Site Plan Review Focus | |
|---|---|---|---|
Buildings, athletic facilities, and supporting structures | The need for the facilities is related to program growth and changes supported in the master plan, and the general sizes and locations are appropriate based upon those needs | The buildings and/or facilities generally conform to the approved master plan and meet the specific zoning and site plan review standards | |
Road network and traffic | The primary road network providing access to the campus and within the campus will be adequate to handle the anticipated increase in traffic safely and efficiently while minimizing the impact on other users as a result of the identified improvements | Any road or traffic improvements that are identified in the overall traffic management program in the master plan that are needed to support the specific development project will be built and will meet the technical standards set out in the ordinance | |
Parking | The amount of parking and general parking locations will be adequate to accommodate the anticipated increase in parking demand resulting from the growth and changes anticipated in the master plan | Any parking improvements that are identified in the overall parking program in the master plan that are needed to support the specific development project will be built and will meet the technical standards set out in the ordinance | |
Water and sewer | The water and sewer systems will be adequate to accommodate the anticipated increase in demand resulting from the growth and changes anticipated in the master plan | The location and design of the water and sewer facilities associated with the specific development proposal are consistent with the master plan and meet the technical standards set out in the ordinance | |
Landscaping, lighting, signs, noise, scenic views | The master plan establishes appropriate standards for the design of these elements and to minimize the impact on surrounding neighborhoods | The location and design of these elements are consistent with the standards set out in the master plan and meet any other applicable technical standards set out in the ordinance | |
Pedestrian and bicycle facilities | The pedestrian and bicycle facilities will be adequate to accommodate the anticipated increase in demand resulting from the growth and changes anticipated in the master plan and standards are established for the design of these elements | The location and design of these elements are consistent with the master plan, meet the standards set out in the master plan, and any other technical standards set out in ordinance |
The institutional master plan shall contain at least the following information and exhibits: |