[Amended 12-19-1991 by Ord. No. 317-91]
All improvements (except electric and gas) shall be installed under the supervision and inspection of the Borough Engineer, the cost thereof to be borne by the developer. Inspection costs shall be computed at 5% of the total cost of the improvement by the Borough Engineer, and such amount, in the form of cash or certified check, shall be deposited with the Borough Clerk before commencement of any construction. If construction is commenced prior to tentative or final subdivision approval, the developer shall likewise deposit a sum in the amount estimated by the Borough Engineer to be credited toward said five-percent inspection charge. No refund of the inspection deposit shall be made.