General Improvement and Development Specifications
Class | Cement | Sand | Coarse Aggregate | Void Contact | |
|---|---|---|---|---|---|
A | 1 | 1.50 | 3.0 | 1.35 | |
B | 1 | 1.75 | 3.5 | 1.55 | |
C | 1 | 2.00 | 4.0 | 1.80 | |
D | 1 | 2.25 | 4.5 | 2.00 |
Electric vehicle: Any vehicle that is licensed and registered for operation on public and private highways, roads, and streets; and operates either partially or exclusively using an electric motor powered by an externally charged on-board battery. |
Table 1: Water Quality Design Storm Distribution | ||||
|---|---|---|---|---|
Time (minutes) | Cumulative Rainfall (inches) | Time (minutes) | Cumulative Rainfall (inches) | |
0 | 0.0000 | 65 | 0.8917 | |
5 | 0.0083 | 70 | 0.9917 | |
10 | 0.0166 | 75 | 1.0500 | |
15 | 0.0250 | 80 | 1.0840 | |
20 | 0.0500 | 85 | 1.1170 | |
25 | 0.0750 | 90 | 1.1500 | |
30 | 0.1000 | 95 | 1.1750 | |
35 | 0.1330 | 100 | 1.2000 | |
40 | 0.1660 | 105 | 1.2250 | |
45 | 0.2000 | 110 | 1.2334 | |
50 | 0.2583 | 115 | 1.2417 | |
55 | 0.3583 | 120 | 1.2500 | |
60 | 0.6250 | |||
R = A + B — (AXB)/100 | ||||
Where: | ||||
R | = | total TSS percent load removal from application of both BMPs | ||
A | = | the TSS percent removal rate applicable to the first BMP | ||
B | = | the TSS percent removal rate applicable to the second BMP | ||
Table 2: TSS Removal Rates for BMPs | ||
|---|---|---|
Best Management Practice | TSS Percent Removal Rate | |
Bioretention systems | 90% | |
Constructed stormwater wetland | 90% | |
Extended detention basin | 40% to 60% | |
Infiltration structure | 80% | |
Manufactured treatment device | See Subsection F(3) | |
Sand filter | 80% | |
Vegetative filter strip | 60% to 80% | |
Wet pond | 50% to 90% | |
(Note: It may be appropriate to delete the requirements in the maintenance and repair plan that are not applicable if the ordinance requires the facility to be dedicated to the municipality. If the municipality does not want to take this responsibility, the ordinance should require the posting of a two-year maintenance guarantee in accordance with N.J.S.A. 40:55D-53. Guidelines for developing a maintenance and inspection program are provided in the New Jersey Stormwater Best Management Practices Manual and the NJDEP Ocean County Demonstration Study, Stormwater Management Facilities Maintenance Manual, dated June 1989 available from the NJDEP, Watershed Management Program.) |
General Improvement and Development Specifications
Class | Cement | Sand | Coarse Aggregate | Void Contact | |
|---|---|---|---|---|---|
A | 1 | 1.50 | 3.0 | 1.35 | |
B | 1 | 1.75 | 3.5 | 1.55 | |
C | 1 | 2.00 | 4.0 | 1.80 | |
D | 1 | 2.25 | 4.5 | 2.00 |
Electric vehicle: Any vehicle that is licensed and registered for operation on public and private highways, roads, and streets; and operates either partially or exclusively using an electric motor powered by an externally charged on-board battery. |
Table 1: Water Quality Design Storm Distribution | ||||
|---|---|---|---|---|
Time (minutes) | Cumulative Rainfall (inches) | Time (minutes) | Cumulative Rainfall (inches) | |
0 | 0.0000 | 65 | 0.8917 | |
5 | 0.0083 | 70 | 0.9917 | |
10 | 0.0166 | 75 | 1.0500 | |
15 | 0.0250 | 80 | 1.0840 | |
20 | 0.0500 | 85 | 1.1170 | |
25 | 0.0750 | 90 | 1.1500 | |
30 | 0.1000 | 95 | 1.1750 | |
35 | 0.1330 | 100 | 1.2000 | |
40 | 0.1660 | 105 | 1.2250 | |
45 | 0.2000 | 110 | 1.2334 | |
50 | 0.2583 | 115 | 1.2417 | |
55 | 0.3583 | 120 | 1.2500 | |
60 | 0.6250 | |||
R = A + B — (AXB)/100 | ||||
Where: | ||||
R | = | total TSS percent load removal from application of both BMPs | ||
A | = | the TSS percent removal rate applicable to the first BMP | ||
B | = | the TSS percent removal rate applicable to the second BMP | ||
Table 2: TSS Removal Rates for BMPs | ||
|---|---|---|
Best Management Practice | TSS Percent Removal Rate | |
Bioretention systems | 90% | |
Constructed stormwater wetland | 90% | |
Extended detention basin | 40% to 60% | |
Infiltration structure | 80% | |
Manufactured treatment device | See Subsection F(3) | |
Sand filter | 80% | |
Vegetative filter strip | 60% to 80% | |
Wet pond | 50% to 90% | |
(Note: It may be appropriate to delete the requirements in the maintenance and repair plan that are not applicable if the ordinance requires the facility to be dedicated to the municipality. If the municipality does not want to take this responsibility, the ordinance should require the posting of a two-year maintenance guarantee in accordance with N.J.S.A. 40:55D-53. Guidelines for developing a maintenance and inspection program are provided in the New Jersey Stormwater Best Management Practices Manual and the NJDEP Ocean County Demonstration Study, Stormwater Management Facilities Maintenance Manual, dated June 1989 available from the NJDEP, Watershed Management Program.) |