Land Use Regulations
The construction and operation of any proposed wind energy facility shall be consistent with all applicable local, state and federal requirements, including but not limited to all applicable safety, construction, environmental, electrical, communications and aviation (i.e. FAA) requirements. | |
A wind energy facility shall be considered an accessory use and structure, and any wind energy facility, regardless of height or rated capacity shall require the issuance of a building permit by the Building Official. Prior to the issuance of a building permit, the applicant/owner of the wind facility shall receive all other permits and approvals, as relevant. | |
A met tower is permitted by right in all zoning districts where structures of any sort are allowed and shall require the issuance of a building permit by the Building Official. A met tower is allowed up to 125 feet in height on a temporary basis not to exceed one-year from the date the building permit is issued. The Building Official may grant a single one-year extension, if justified upon a written request by the applicant. A met tower must comply with § 218-37D(4)(g), Siting Standards. |
Land Use Regulations
The construction and operation of any proposed wind energy facility shall be consistent with all applicable local, state and federal requirements, including but not limited to all applicable safety, construction, environmental, electrical, communications and aviation (i.e. FAA) requirements. | |
A wind energy facility shall be considered an accessory use and structure, and any wind energy facility, regardless of height or rated capacity shall require the issuance of a building permit by the Building Official. Prior to the issuance of a building permit, the applicant/owner of the wind facility shall receive all other permits and approvals, as relevant. | |
A met tower is permitted by right in all zoning districts where structures of any sort are allowed and shall require the issuance of a building permit by the Building Official. A met tower is allowed up to 125 feet in height on a temporary basis not to exceed one-year from the date the building permit is issued. The Building Official may grant a single one-year extension, if justified upon a written request by the applicant. A met tower must comply with § 218-37D(4)(g), Siting Standards. |