Decommissioning and removal plan. To ensure the proper removal of utility-scale solar energy system, the applicant shall submit a decommissioning plan for review and approval as part of the special use permit application. The decommissioning plan shall identify the anticipated life of the project, method and process for removing all components of the solar energy system and returning the site to its preexisting condition, and estimated decommissioning costs, including any salvage value. Compliance with this plan shall be made as a condition of the issuance of a special use permit under this section. The decommissioning plan must specify that after the utility-scale solar energy system can no longer be used, it shall be removed by the applicant or any subsequent owner. The plan shall demonstrate how the removal of all infrastructures and the remediation of soil and vegetation shall be conducted to return the parcel to its original state prior to the construction. The plan shall also include an expected timeline for execution. A cost estimate detailing the projected cost of executing the decommissioning plan shall be prepared by a professional engineer or contractor. Cost estimations shall take into account inflation. To secure such removal, the applicant shall provide and maintain a form of financial surety. Such financial surety shall be provided either through a security deposit, escrow account, bond, or in a manner otherwise acceptable to the Town and shall be in an amount to be established by the Town Board upon recommendation from the Town Engineer. The bond amount will be equal to 125% of the decommissioning and reclamation cost for the entire system. The full amount of the financial security shall remain in full force and effect throughout the term of the approval and/or until any necessary site restoration is completed to restore the site to a condition comparable to that which existed prior to the issuance of the original approval. The Town may periodically review the financial security to determine if any adjustments in the bond amount are required. Removal of utility-scale solar energy system must be completed in accordance with the decommissioning plan. If the utility-scale solar energy system is not decommissioned after being considered abandoned, the municipality may remove the system and restore the property and impose a lien on the property owner to cover these costs incurred by the municipality.