Restoration. The Zoning Hearing Board shall be authorized to approve, as a special exception, the reconstruction of a nonconforming structure damaged by fire, flood, wind, tornado, earthquake, or other natural disaster, with the following limits:
(1)
The structure is properly secured after the damage or destruction;
(2)
Such reconstruction is performed within 12 months after the date of damage or destruction, unless the Zoning Hearing Board grants a time extension for good cause;
(3)
The rebuilding does not increase the intensity of the use, as determined by the number of dwelling units (for residences) or floor area or ground coverage (for nonresidential uses);
(4)
No new nonconformity is created and no existing nonconformity is increased;
(5)
An existing detached building that is accessory to a dwelling may be replaced with a new building, provided the new building is no more nonconforming than the previous building.