Applications for occupancy permits shall be made to the Building Commissioner and shall be accompanied by a permit fee. Where a building permit is required, the application for the occupancy permit shall be made coincidentally with the application for the building permit. Each such application shall be accompanied by a drawing or plat, in triplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the size, shape and location of the building or structure to be erected, architectural plans and specifications, the use to be made of the building or structure upon completion, and such other information as may be necessary for the enforcement of this Chapter and the other ordinances of the City of Clarkson Valley. The Building Commissioner may issue a certificate of tentative occupancy to the applicant giving conditional approval of the application provided the proposed location, erection or structural alteration complies with the provisions of this Chapter, in duplicate; one (1) copy to be placed on file in the office of the Building Commissioner and the other copy to be posted in a conspicuous place on the building during the construction or alteration; stating that the proposed location, construction or structural alteration is in conformity with the provisions of this Chapter.