Site plan review. Roof-mounted solar energy systems shall be exempt from site plan review under the local zoning code or other land use regulations. All solar energy system installations must be performed in accordance with all applicable electrical and building codes, manufacturer's instructions, and industry standards. Prior to the operation of the solar energy system, it must be inspected by the Code Enforcement Officer or by an appropriate electrical inspector or agency. When mechanical equipment, batteries, or storage cells are included as part of the solar energy system, they must be placed in a secure container or enclosure in compliance with New York State Building Code. Where site plan approval is required elsewhere in the regulations of the Town, the site plan review shall include review of the adequacy, location, arrangement, size, design, and general site compatibility of the proposed solar energy system. Although locations in side and rear yards are encouraged, a ground-mounted solar panel may be located in a front yard if the applicant can demonstrate to the satisfaction of the Planning Board that locating such solar arrays in the side or rear yard would not provide adequate coverage.