Churches or other similar places of worship, rectories, parish houses, convents and elementary and secondary schools, either parochial or public, operated under the supervision of the Board of Regents of the State of New York, shall be permitted, subject, however, to the following conditions and restrictions:
(1) Building area. All buildings, including accessory buildings, shall not cover more than 20% of the area of the lot.
(2) Height. The height of any principal building shall not exceed 35 feet; the height of any accessory building shall not exceed 20 feet, except that an accessory building may be 35 feet in height, provided that it shall be distant at least 100 feet from the main building.
(3) Yards. Each lot shall have front, side and rear yards not less than the depths and widths following.
(a) Front yard depth: 110 feet.
(b) Side yard width: each one, 40 feet for a one-story building; each one, 60 feet for a two-or-more-story building; however, when a side yard abuts a street line, the width shall be 110 feet.
(c) Rear yard depth: 40 feet for a one-story building; 50 feet for a two-or-more-story building.
(4) Parking area. Off-street parking on the lot shall be provided in a paved area equal in area to two times the area occupied by buildings. Such parking area may extend into the side and rear yards but shall be distant not less than 20 feet from any lot line and 15 feet from any street line. Surfacing of such area shall be in accordance with Village ordinance.
(5) Screening. Where a parking area abuts a property line, a screen of evergreen shrubs shall be installed along said lines as specified by the Planning Board.
(6) Marginal roadway. A marginal roadway 50 feet in width shall be provided in the front yard and in any side yard abutting a street. Said marginal roadway shall extend from the road or street line into the front and side yard, shall be separated from the street by a mall 10 feet in width, and no more than two openings in the mall for access shall be made on any one street; the mall shall be curbed; the pavement in the roadway shall be 30 feet in width, and a sidewalk four feet in width shall be constructed along the inner side of the marginal roadway. All work and construction hereinabove set forth shall be in accordance with Village specifications and regulations.
(7) Plan. The plot plan required to be submitted with the application for the building permit shall, in addition, show the requirements set forth herein, together with the estimated cost of the improvements required in Subsection
A(4),
(5) and
(6).
(8) Bond. If the improvements provided in Subsection
A(4),
(5) and
(6) have not been completed prior to the application for a certificate of occupancy, a performance bond for not more than one year may be accepted by the Village Clerk in an amount estimated by the Village Engineer necessary to complete the improvements, which bond shall be a surety company bond in such company as shall be approved by the Board of Trustees and in such form as shall be approved by the Village Attorney. On the acceptance and filing of such bond, the Building Official shall be authorized to issue the certificate of occupancy.