LAND APPLICATION OF SLUDGE
Additional analysis may be required by the Township Engineer from time to time during the application program to insure sludge content remains within the limits established by the Pennsylvania Department of Environmental Protection. At minimum, the monitoring program shall include four samples a year. | |
Sludge analysis shall show recommended rates and lifetime loading. |
The amount of the indemnification bond shall be equal to the cost of removal and/or clean up of any site and any engineering or legal fees pertaining thereto as estimated by the Township Engineer and Township Solicitor at the time of issuance of any permit, plus 15% per year thereof for the useful life of the site plus five years. |
LAND APPLICATION OF SLUDGE
Additional analysis may be required by the Township Engineer from time to time during the application program to insure sludge content remains within the limits established by the Pennsylvania Department of Environmental Protection. At minimum, the monitoring program shall include four samples a year. | |
Sludge analysis shall show recommended rates and lifetime loading. |
The amount of the indemnification bond shall be equal to the cost of removal and/or clean up of any site and any engineering or legal fees pertaining thereto as estimated by the Township Engineer and Township Solicitor at the time of issuance of any permit, plus 15% per year thereof for the useful life of the site plus five years. |