If any nonconforming building shall be destroyed by reason of windstorm, fire, explosion or other act of God or the public enemy to an extent of less than 50% of the recorded true valuation, then such destruction shall be deemed partial destruction and the nonconforming building may be rebuilt, restored or repaired within one year from the date of the destruction. If such a structure is located within the Floodplain District, the development regulations cited in § 225-22B shall be utilized to the greatest extent possible; provided, however, that if such a structure is located within the floodplain, as that area is defined in § 225-22A(1), then the requirements of § 225-22B(1)(d), as amended, must be satisfied, notwithstanding the destruction of less than or more than 50% of the recorded valuation of the structure. Nothing in this chapter shall prevent strengthening or restoring to a safe condition any wall, floor or roof which has been declared unsafe by the Building Official.