Zoneomics Logo
search icon

Hartwell City Zoning Code

ARTICLE XX

MINIMUM DIMENSIONAL REQUIREMENTS11


Footnotes:
--- (11) ---

Editor's note— Ord. No. 2023-01, § 18, adopted August 7, 2023, renumbered the former Article XVIII as Article XX, in addition to amending § 42-499, as set out herein.


Sec. 42-499.- By zoning districts.

District
Maximum Height (in feet)

Minimum Lot Width (in feet)

Minimum Lot Size (in sq. ft.)

Maximum Lot Coverage (percentage)

Principal Building Setback

Maximum Density (in units per acre)

Minimum Gross Floor Area Per Dwelling Unit

Front

Side

Rear
R-1 35 100 ×
150
15,000 45 25 10 20 2.9 900
R-1A 35 75 × 134 10,000 45 25 10 20 4.3 750
R-1B 35 60 × 100 6,000 45 25 10 20 5.8 600
R-2 45 50 × 90 4,500 45 25 10 20 7.4 ? 8* 480
MHP 35 (See article XI of this chapter)
B-1 45 50 4,500 45 25 10 20 Conditional 480
B-2 60 N/A N/A 45 25(a) 10(a) 20(a) Conditional N/A
O-I 45 50 10,000 45 25 10 20 4.3 480
M-1 150 N/A N/A 45 40 25(b) 50(b) N/A N/A
M-2 150 N/A N/A 60 40 25(c) 50(c) N/A N/A

 

* = 7.4 units per acre without onsite parking; 8 units per acre with onsite parking.

N/A= Not applicable or no minimum

(a) = A setback shall not be required when one or more buildings or structures on an abutting lot to the side does not meet the specified setback.

(b) = When development in this district abuts a residential district, a buffer (natural undisturbed or planted) with a minimum of 50 feet in width shall be provided along the entire property line abutting the residential district.

(c) = When development in this district abuts a residential or O-I district, a buffer (natural undisturbed or planted) with a minimum of 75 feet in width shall be provided along the entire property line abutting said district.

(Ord. of 10-2-1995, § 86-1801; Ord. No. 2023-01, § 18, 8-7-2023)

_____