Fees, Guarantees, Inspections and off-Tract Improvements
Type of Application | Administrative Fee | |
|---|---|---|
Certification of Pre-existing Non-Conforming Use | $75 | |
Appeals and Interpretations | $275 | |
Special Meeting | $1,500 | |
Conceptual/Informal Review | $575 | |
Bulk Variances | Residential | $225 per variance |
Non-Residential | $275 per variance | |
Accessory Buildings and Structures Residential Only | $225 flat fee | |
Use Variances | Residential | $750 plus $50 per dwelling unit |
Non-Residential | $800 per acre of entire tract or $50 per 1,000 square feet gross floor area, whichever is greater | |
Conditional Use | $500 | |
Tree Removal Permit | Residential | New residential building lots, $15 per tree up to a maximum of $350 per lot. |
Non-Residential | $15 per tree up to maximum of $700 for EACH acre | |
Soil Removal Permit | $40 per permit | |
Subdivision | Minor | $350 |
Major | ||
Preliminary | $650 plus $50 per lot | |
Final | 50% of preliminary fee | |
Site Plan | Minor | |
Preliminary | $650 plus $50 per lot | |
Final | $50% of preliminary fee | |
Site Plan | Major | |
Preliminary | $1,000 plus $50 per acre, plus $0.05 per square foot of proposed building area | |
Final | 50% of preliminary fee | |
Requested Waivers | ||
Environmental Impact Study | $150 | |
Traffic Study | $150 | |
Drainage/Storm Water | $150 | |
Exempt from Site Plan | $150 | |
Design (i.e. parking space size) | $100 | |
All others not included above | $100 | |
Tax Map Revision Fee | $75 per lot for minor and major subdivisions to cover the cost to revise tax map | |
Re-submission or Revision Fee | $50 or 40% of original fee, whichever is greater | |
Certified List per MLUL | $10 or $0.25 per name whichever is greater | |
Extension of Approvals | $300 | |
Type of Application | Fee | |
|---|---|---|
Appeals and Interpretations | $500 | |
Conceptual/Informal Review | $575 | |
Bulk Variances | Residential | $600 |
Non-Residential | $500 plus $100 per each variance requested | |
Use Variance | $1,500 | |
Conditional Use | $1,000 | |
Subdivision | Minor | $1,500 |
Residential/Preliminary | ||
1 - 5 unit(s) and/or lot(s) | $2,000 | |
6 - 25 unit(s) and/or lot(s) | $3,500 | |
25 - 100 unit(s) and/or lot(s) | $5,000 | |
101 plus unit(s) and/or lot(s) | $7,500 | |
Residential/Final | 50% of preliminary fee | |
Site Plan | Minor | $500 |
Preliminary | $2,000 plus $25 per dwelling unit | |
Final | 50% of preliminary fee | |
Major | ||
Commercial/Industrial/Preliminary | ||
0 - 1,250 square feet | $1,500 | |
1,251 - 10,000 square feet | $2,500 | |
10,001 - 25,000 square feet | $5,000 | |
25,001 - 75,000 square feet | $7,500 | |
Plus 75,000 square feet | $10,000 | |
Final | 50% of preliminary fee | |
Special Meeting | $500 | |
Resubmission or Revision | $50 or 40% of original fee whichever is greater | |
Tree Removal Permit | refer to 181-523 escrow | |
Extension of Approval | $1,000 | |
Soil Removal | $100 for review and inspection by Twp. Engineer, plus $0.05 per square foot of area disturbed due to removal | |
Type of Application | Administrative Fee | |
|---|---|---|
Change of Zone Request | $250 | |
Zoning Permits | ||
New Residential Single-Family Dwelling | $150 each unit | |
New Non-Residential Construction | $250 for the 1st $25,000 of construction cost or any part thereof plus $5 for each $1,000 of construction cost thereafter | |
Renovations: | ||
Residential | ||
Application Review Fee: | $25 Non-Refundable | |
Permit Fee: | $10 for the 1st $1,000 of construction cost and $5 per $1,000 thereafter; Minimum fee: $25 | |
Non-Residential (Non-refundable) | ||
Application Review Fee: | $75 | |
Permit Fee: | $10 for the 1st $1,000 of construction cost and $5 per $1,000 thereafter; Minimum fee: $25 | |
Fence | $50 flat fee | |
Retaining Wall | $50 flat fee | |
Shed | $50 flat fee | |
Signs | $1 per square foot, with minimum $25, plus application fee $75 | |
Non-Residential Use Permit/Occupancy | ||
Tenant change | $100 | |
Ownership change | $250 | |
Lot Grading and Drainage Plan | ||
Initial review by Twp. Engineer | $200 per lot | |
Revised review by Engineer | $100 per lot | |
Final As-built Survey, includes 1 inspection by Twp. Engineer | $250 | |
Revised Final As-Built | $100 | |
Re-inspect of site and report preparation | $150 | |
DRO Book | $75 | |
Colored Zoning Map | (11" x 17") | $5 |
(2'x3') | $20 | |
Photocopies | State Statue | |
No charge for records sent email or fax | ||
Copying data to disk or CD | $0 | |
Use of Tape for Transcript Purposes (Must supply their own stenographer to make transcript) | $0 | |
Duplication of Tape Recordings | $0 | |
Certificate of Occupancy [Refer to Chapter 170 of Hazlet Codes] | ||
Fees, Guarantees, Inspections and off-Tract Improvements
Type of Application | Administrative Fee | |
|---|---|---|
Certification of Pre-existing Non-Conforming Use | $75 | |
Appeals and Interpretations | $275 | |
Special Meeting | $1,500 | |
Conceptual/Informal Review | $575 | |
Bulk Variances | Residential | $225 per variance |
Non-Residential | $275 per variance | |
Accessory Buildings and Structures Residential Only | $225 flat fee | |
Use Variances | Residential | $750 plus $50 per dwelling unit |
Non-Residential | $800 per acre of entire tract or $50 per 1,000 square feet gross floor area, whichever is greater | |
Conditional Use | $500 | |
Tree Removal Permit | Residential | New residential building lots, $15 per tree up to a maximum of $350 per lot. |
Non-Residential | $15 per tree up to maximum of $700 for EACH acre | |
Soil Removal Permit | $40 per permit | |
Subdivision | Minor | $350 |
Major | ||
Preliminary | $650 plus $50 per lot | |
Final | 50% of preliminary fee | |
Site Plan | Minor | |
Preliminary | $650 plus $50 per lot | |
Final | $50% of preliminary fee | |
Site Plan | Major | |
Preliminary | $1,000 plus $50 per acre, plus $0.05 per square foot of proposed building area | |
Final | 50% of preliminary fee | |
Requested Waivers | ||
Environmental Impact Study | $150 | |
Traffic Study | $150 | |
Drainage/Storm Water | $150 | |
Exempt from Site Plan | $150 | |
Design (i.e. parking space size) | $100 | |
All others not included above | $100 | |
Tax Map Revision Fee | $75 per lot for minor and major subdivisions to cover the cost to revise tax map | |
Re-submission or Revision Fee | $50 or 40% of original fee, whichever is greater | |
Certified List per MLUL | $10 or $0.25 per name whichever is greater | |
Extension of Approvals | $300 | |
Type of Application | Fee | |
|---|---|---|
Appeals and Interpretations | $500 | |
Conceptual/Informal Review | $575 | |
Bulk Variances | Residential | $600 |
Non-Residential | $500 plus $100 per each variance requested | |
Use Variance | $1,500 | |
Conditional Use | $1,000 | |
Subdivision | Minor | $1,500 |
Residential/Preliminary | ||
1 - 5 unit(s) and/or lot(s) | $2,000 | |
6 - 25 unit(s) and/or lot(s) | $3,500 | |
25 - 100 unit(s) and/or lot(s) | $5,000 | |
101 plus unit(s) and/or lot(s) | $7,500 | |
Residential/Final | 50% of preliminary fee | |
Site Plan | Minor | $500 |
Preliminary | $2,000 plus $25 per dwelling unit | |
Final | 50% of preliminary fee | |
Major | ||
Commercial/Industrial/Preliminary | ||
0 - 1,250 square feet | $1,500 | |
1,251 - 10,000 square feet | $2,500 | |
10,001 - 25,000 square feet | $5,000 | |
25,001 - 75,000 square feet | $7,500 | |
Plus 75,000 square feet | $10,000 | |
Final | 50% of preliminary fee | |
Special Meeting | $500 | |
Resubmission or Revision | $50 or 40% of original fee whichever is greater | |
Tree Removal Permit | refer to 181-523 escrow | |
Extension of Approval | $1,000 | |
Soil Removal | $100 for review and inspection by Twp. Engineer, plus $0.05 per square foot of area disturbed due to removal | |
Type of Application | Administrative Fee | |
|---|---|---|
Change of Zone Request | $250 | |
Zoning Permits | ||
New Residential Single-Family Dwelling | $150 each unit | |
New Non-Residential Construction | $250 for the 1st $25,000 of construction cost or any part thereof plus $5 for each $1,000 of construction cost thereafter | |
Renovations: | ||
Residential | ||
Application Review Fee: | $25 Non-Refundable | |
Permit Fee: | $10 for the 1st $1,000 of construction cost and $5 per $1,000 thereafter; Minimum fee: $25 | |
Non-Residential (Non-refundable) | ||
Application Review Fee: | $75 | |
Permit Fee: | $10 for the 1st $1,000 of construction cost and $5 per $1,000 thereafter; Minimum fee: $25 | |
Fence | $50 flat fee | |
Retaining Wall | $50 flat fee | |
Shed | $50 flat fee | |
Signs | $1 per square foot, with minimum $25, plus application fee $75 | |
Non-Residential Use Permit/Occupancy | ||
Tenant change | $100 | |
Ownership change | $250 | |
Lot Grading and Drainage Plan | ||
Initial review by Twp. Engineer | $200 per lot | |
Revised review by Engineer | $100 per lot | |
Final As-built Survey, includes 1 inspection by Twp. Engineer | $250 | |
Revised Final As-Built | $100 | |
Re-inspect of site and report preparation | $150 | |
DRO Book | $75 | |
Colored Zoning Map | (11" x 17") | $5 |
(2'x3') | $20 | |
Photocopies | State Statue | |
No charge for records sent email or fax | ||
Copying data to disk or CD | $0 | |
Use of Tape for Transcript Purposes (Must supply their own stenographer to make transcript) | $0 | |
Duplication of Tape Recordings | $0 | |
Certificate of Occupancy [Refer to Chapter 170 of Hazlet Codes] | ||