Administration and Procedures
Figure 300-10.20a |
Key: |
RE = Review and evaluate |
IP = Issues permit |
RR = Review and recommend |
PH = Public hearing |
PM = Public meeting |
A = Final action |
Review and Approval Activities and Bodies | |||||
|---|---|---|---|---|---|
Application Process | Staff | Plan Commission | City Council | Board of Zoning Appeals | Historic Preservation Commission |
Zoning Ordinance amendment (§ 300-10.30) | RR | PH, RR | RE, A | ||
Zoning Map amendment (§ 300-10.31) | PM1, RR | PH, RR | RE, A | ||
Conditional use permit (§ 300-10.32) | PM1, RR | RE, A | Appeal only | RR2 | |
Temporary use permit (§ 300-10.40) | RE, IP | ||||
Land use permit (§ 300-10.41) | RE, IP | ||||
Site plan (§ 300-10.42) | RE, A | ||||
Special area design review (§ 300-10.43) | See § 300-10.43 | ||||
Planned unit development (§ 300-10.44) | PM1, RR | PH, RR | RE, A | ||
Interpretation (§ 300-10.50) | RE, A | Appeal only | |||
Variance (§ 300-10.51) | RR | PH, RE, A | |||
Appeal (§ 300-10.52) | RR | PH, RE, A | |||
Violations and penalties (§ 300-10.60) | RE, A | ||||
Official mapping [Wis. Stats. § 62.23(6)] | PM, RR | PH, RR | RE, A | ||
Land interest transfer | RE, A | ||||
Land division-CSM/no new lot (Chapter 70) | RE, A | ||||
Land division-CSM/new lot (Chapter 70) | RR | RE, A | |||
Land division-preliminary plat (Chapter 70) | RR | RR | RE, A | ||
Land division-final plat (Chapter 70) | RR | RR | A | ||
Design standard variance (§ 300-07.01) | RR | RE, A | RR2 | ||
Historic preservation: landmarking (Chapter 42) | PM, RR | RR | RE, A | PH, RR | |
Historic preservation: certificate of appropriateness (Chapter 42) | RE, A | PH, A, Appeal Only | PH, RE, A | ||
Planning document/plans | PM, RR | RR | RE, A | RR2 | |
Annexation (Wis. Stats. § 66.0217) | RR | PH, RR | RE, A | ||
Attachment | Refer to adopted agreement | ||||
Street vacation/discontinuance (Wis. Stats. § 66.1003) | RR | RR | PH, RE, A | ||
Floodplain map amendment (Chapter 30) | Refer to Wisconsin DNR/FEMA | ||||
Privilege in the right-of-way (Wis. Stats. § 62.23) | RE, A | RR | RE, A | ||
Easement acceptance/release (Wis. Stats. § 62.23) | RE, A | RR | RE, A | ||
Sign permit (Article IX) | Refer to Article IX. | ||||
Building permit | RE, IP | See Chapter 120 of the Municipal Code | |||
Certificate of occupancy (§ 300-10.42) | RE, IP | ||||
NOTES: | |
This table is not exhaustive. Some procedures may not be covered within this table. | |
1 | If determined to be necessary by the Building/Zoning Inspector. |
2 | Historic Preservation Commission review and recommendation necessary if site/building is locally landmarked, individually listed or part of the State or National Register of Historic Places. |
Figure 300-10.44a |
Process for Special Area Design Review | ||||
|---|---|---|---|---|
KEY: Yes = Step is required. No = Step is not required Maybe = Step may be required at the discretion of the Building/Zoning Inspector. | ||||
Procedure | Type of Proposal | |||
Renovation1 | Design2 | Project3 | ||
1. | Consultation with Building/Zoning Inspector, to confirm type of proposal | Yes | Yes | Yes |
2. | Submit proposed and existing building elevations | No | Yes | Yes |
3. | Submit site plan application | No | No | Yes |
4. | Submit conditional use permit application | No | No | Yes |
5. | Review and action by Building/Zoning Inspector | No | Yes | Yes |
6. | Review and action by Plan Commission | No | Maybe | Yes |
NOTES: | |
1 | Only a replacement to or maintenance of the exterior of a property |
2 | Only a change in the appearance of a property |
3 | Modification to the physical configuration of a property, i.e., new building, addition, or demolition |
Administration and Procedures
Figure 300-10.20a |
Key: |
RE = Review and evaluate |
IP = Issues permit |
RR = Review and recommend |
PH = Public hearing |
PM = Public meeting |
A = Final action |
Review and Approval Activities and Bodies | |||||
|---|---|---|---|---|---|
Application Process | Staff | Plan Commission | City Council | Board of Zoning Appeals | Historic Preservation Commission |
Zoning Ordinance amendment (§ 300-10.30) | RR | PH, RR | RE, A | ||
Zoning Map amendment (§ 300-10.31) | PM1, RR | PH, RR | RE, A | ||
Conditional use permit (§ 300-10.32) | PM1, RR | RE, A | Appeal only | RR2 | |
Temporary use permit (§ 300-10.40) | RE, IP | ||||
Land use permit (§ 300-10.41) | RE, IP | ||||
Site plan (§ 300-10.42) | RE, A | ||||
Special area design review (§ 300-10.43) | See § 300-10.43 | ||||
Planned unit development (§ 300-10.44) | PM1, RR | PH, RR | RE, A | ||
Interpretation (§ 300-10.50) | RE, A | Appeal only | |||
Variance (§ 300-10.51) | RR | PH, RE, A | |||
Appeal (§ 300-10.52) | RR | PH, RE, A | |||
Violations and penalties (§ 300-10.60) | RE, A | ||||
Official mapping [Wis. Stats. § 62.23(6)] | PM, RR | PH, RR | RE, A | ||
Land interest transfer | RE, A | ||||
Land division-CSM/no new lot (Chapter 70) | RE, A | ||||
Land division-CSM/new lot (Chapter 70) | RR | RE, A | |||
Land division-preliminary plat (Chapter 70) | RR | RR | RE, A | ||
Land division-final plat (Chapter 70) | RR | RR | A | ||
Design standard variance (§ 300-07.01) | RR | RE, A | RR2 | ||
Historic preservation: landmarking (Chapter 42) | PM, RR | RR | RE, A | PH, RR | |
Historic preservation: certificate of appropriateness (Chapter 42) | RE, A | PH, A, Appeal Only | PH, RE, A | ||
Planning document/plans | PM, RR | RR | RE, A | RR2 | |
Annexation (Wis. Stats. § 66.0217) | RR | PH, RR | RE, A | ||
Attachment | Refer to adopted agreement | ||||
Street vacation/discontinuance (Wis. Stats. § 66.1003) | RR | RR | PH, RE, A | ||
Floodplain map amendment (Chapter 30) | Refer to Wisconsin DNR/FEMA | ||||
Privilege in the right-of-way (Wis. Stats. § 62.23) | RE, A | RR | RE, A | ||
Easement acceptance/release (Wis. Stats. § 62.23) | RE, A | RR | RE, A | ||
Sign permit (Article IX) | Refer to Article IX. | ||||
Building permit | RE, IP | See Chapter 120 of the Municipal Code | |||
Certificate of occupancy (§ 300-10.42) | RE, IP | ||||
NOTES: | |
This table is not exhaustive. Some procedures may not be covered within this table. | |
1 | If determined to be necessary by the Building/Zoning Inspector. |
2 | Historic Preservation Commission review and recommendation necessary if site/building is locally landmarked, individually listed or part of the State or National Register of Historic Places. |
Figure 300-10.44a |
Process for Special Area Design Review | ||||
|---|---|---|---|---|
KEY: Yes = Step is required. No = Step is not required Maybe = Step may be required at the discretion of the Building/Zoning Inspector. | ||||
Procedure | Type of Proposal | |||
Renovation1 | Design2 | Project3 | ||
1. | Consultation with Building/Zoning Inspector, to confirm type of proposal | Yes | Yes | Yes |
2. | Submit proposed and existing building elevations | No | Yes | Yes |
3. | Submit site plan application | No | No | Yes |
4. | Submit conditional use permit application | No | No | Yes |
5. | Review and action by Building/Zoning Inspector | No | Yes | Yes |
6. | Review and action by Plan Commission | No | Maybe | Yes |
NOTES: | |
1 | Only a replacement to or maintenance of the exterior of a property |
2 | Only a change in the appearance of a property |
3 | Modification to the physical configuration of a property, i.e., new building, addition, or demolition |