FEES CHARGED FOR APPLICATIONS AND/OR PERMITS PERTAINING TO THIS ORDINANCE
The following fees shall be applicable to application for the following zoning request or permits.
| TYPE: | FEE: |
|---|---|
| Zoning Certification Letters | $25.00 |
| Annexation/deannexation | $100.00 |
| SIGNS: | |
| Wall: | $50.00 |
| Ground: | $75.00 |
| Pylon: 7 ft. to 50 ft. | $100.00 |
| 51 ft. to 75 ft. | $135.00 |
| 76 ft. to 100 ft. | $175.00 |
| Over 101 ft. | $250.00 |
| VARIANCES: | Residential | $100.00 |
| Business: | $125.00 |
REZONING: Any single-family residential use, or other uses not listed below - $125.00
| Land Area Involved | Commercial/Industrial/PD | Multi-family |
|---|---|---|
| 0 > 19,999 Sq. Feet | $175.00 | $150.00 |
| 20,000 > 49,999 Sq. Feet | $200.00 | $175.00 |
| 50,000 > 74,999 Sq. Feet | $225.00 | $200.00 |
| 75,000 > 99,999 Sq. Feet | $275.00 | $225.00 |
| 100,000 > 149,999 Sq. Feet | $350.00 | $275.00 |
| 150,000 > 199,999 Sq. Feet | $400.00 | $350.00 |
| 200,000 > 299,999 Sq. Feet | $450.00 | $400.00 |
| Over 300,000 Sq. Feet | $600.00 | $450.00 |
| SPECIAL USE: | $300.00 |
| LAND DISTURBING | |
| ACTIVITY PERMIT: | $100.00 + ($40.00 per acres) |
| PRELIMINARY PLAT: | |
| 1—10 Lots | $25.00 per lot |
| 11—30 Lots | $350.00 |
| 31 or more lots | $650.00 |
| FINAL PLAT: | |
| 1—30 Lots | $150.00 |
| 31—60 Lots | $250.00 |
| >60 Lots | $350.00 |
| ENGINEERING REVIEW FEE: | |
| 1—9 Lots | $500.00 |
| 10—29 Lots | $1,500.00 |
| 30—49 Lots | $2,000.00 |
| 50—99 Lots | $2,500.00 |
| <99 Lots | $2,500.00+ $25.00 per lot |
| COMMERCIAL: |
$1,200.00
Subsequent review fees, if necessary, will be assessed based on current billing rates. |
(Ord. No. 2019-12, 12-9-2019; Ord. No. 2022-12, 7-25-2022; Ord. No. 2025-04, 2-10-2025)
The following fees shall be applicable to applications for the following building permit requests:
*BUILDING FEES
| TYPE: | FEE: _____ | |
|
Building
New, Addition, Pools, etc. |
½ of 1% of
Total Building Cost, net of following | |
| Plumbing | 2% of Plumbing Cost | |
| Electrical | 2% of Electrical Cost | |
| Low voltage electrical | 2% of Low Voltage Electrical | |
| HVAC | 2% of HVAC Cost | |
| Gas | 2% of Gas Cost | |
| Fire Suppression System | 2% of Fire Suppression System Cost | |
| Underground Utilities | 2% of Underground Utilities Cost |
*A flat fee of $50.00 shall be charged if the total permit fee for any of the above permits is less than $50.00.
FLAT FEES
| TYPE: _____ | FEE: _____ |
| Temporary Power Pole | $25.00 |
| Permanent Power | $25.00 |
| Above Ground Pools | $25.00 |
| Mobile Homes | $70.00 |
| Demolition | $200.00 |
| Land Disturbing Activities | $100.00 |
| Culvert/Additional Driveway Installation | $100.00 |
PENALTY FEES
| TYPE: _____ | FEE: _____ |
| Reinspection Fee | $20.00 |
| If any person or organization commences work prior to obtaining a permit, all fees shall be doubled | Double Fees |
(Amend. of 7-23-2007; Ord. No. 2011-01, 2-14-2011)
The following fees shall be applicable to inspection of subdivisions for acceptance of infrastructure:
| First inspection | Free |
| First reinspection | $200.00 |
| Second reinspection | $1,000.00 |
| After second reinspection | $2,000.00 |
(Amend. of 7-23-2007)
FEES CHARGED FOR APPLICATIONS AND/OR PERMITS PERTAINING TO THIS ORDINANCE
The following fees shall be applicable to application for the following zoning request or permits.
| TYPE: | FEE: |
|---|---|
| Zoning Certification Letters | $25.00 |
| Annexation/deannexation | $100.00 |
| SIGNS: | |
| Wall: | $50.00 |
| Ground: | $75.00 |
| Pylon: 7 ft. to 50 ft. | $100.00 |
| 51 ft. to 75 ft. | $135.00 |
| 76 ft. to 100 ft. | $175.00 |
| Over 101 ft. | $250.00 |
| VARIANCES: | Residential | $100.00 |
| Business: | $125.00 |
REZONING: Any single-family residential use, or other uses not listed below - $125.00
| Land Area Involved | Commercial/Industrial/PD | Multi-family |
|---|---|---|
| 0 > 19,999 Sq. Feet | $175.00 | $150.00 |
| 20,000 > 49,999 Sq. Feet | $200.00 | $175.00 |
| 50,000 > 74,999 Sq. Feet | $225.00 | $200.00 |
| 75,000 > 99,999 Sq. Feet | $275.00 | $225.00 |
| 100,000 > 149,999 Sq. Feet | $350.00 | $275.00 |
| 150,000 > 199,999 Sq. Feet | $400.00 | $350.00 |
| 200,000 > 299,999 Sq. Feet | $450.00 | $400.00 |
| Over 300,000 Sq. Feet | $600.00 | $450.00 |
| SPECIAL USE: | $300.00 |
| LAND DISTURBING | |
| ACTIVITY PERMIT: | $100.00 + ($40.00 per acres) |
| PRELIMINARY PLAT: | |
| 1—10 Lots | $25.00 per lot |
| 11—30 Lots | $350.00 |
| 31 or more lots | $650.00 |
| FINAL PLAT: | |
| 1—30 Lots | $150.00 |
| 31—60 Lots | $250.00 |
| >60 Lots | $350.00 |
| ENGINEERING REVIEW FEE: | |
| 1—9 Lots | $500.00 |
| 10—29 Lots | $1,500.00 |
| 30—49 Lots | $2,000.00 |
| 50—99 Lots | $2,500.00 |
| <99 Lots | $2,500.00+ $25.00 per lot |
| COMMERCIAL: |
$1,200.00
Subsequent review fees, if necessary, will be assessed based on current billing rates. |
(Ord. No. 2019-12, 12-9-2019; Ord. No. 2022-12, 7-25-2022; Ord. No. 2025-04, 2-10-2025)
The following fees shall be applicable to applications for the following building permit requests:
*BUILDING FEES
| TYPE: | FEE: _____ | |
|
Building
New, Addition, Pools, etc. |
½ of 1% of
Total Building Cost, net of following | |
| Plumbing | 2% of Plumbing Cost | |
| Electrical | 2% of Electrical Cost | |
| Low voltage electrical | 2% of Low Voltage Electrical | |
| HVAC | 2% of HVAC Cost | |
| Gas | 2% of Gas Cost | |
| Fire Suppression System | 2% of Fire Suppression System Cost | |
| Underground Utilities | 2% of Underground Utilities Cost |
*A flat fee of $50.00 shall be charged if the total permit fee for any of the above permits is less than $50.00.
FLAT FEES
| TYPE: _____ | FEE: _____ |
| Temporary Power Pole | $25.00 |
| Permanent Power | $25.00 |
| Above Ground Pools | $25.00 |
| Mobile Homes | $70.00 |
| Demolition | $200.00 |
| Land Disturbing Activities | $100.00 |
| Culvert/Additional Driveway Installation | $100.00 |
PENALTY FEES
| TYPE: _____ | FEE: _____ |
| Reinspection Fee | $20.00 |
| If any person or organization commences work prior to obtaining a permit, all fees shall be doubled | Double Fees |
(Amend. of 7-23-2007; Ord. No. 2011-01, 2-14-2011)
The following fees shall be applicable to inspection of subdivisions for acceptance of infrastructure:
| First inspection | Free |
| First reinspection | $200.00 |
| Second reinspection | $1,000.00 |
| After second reinspection | $2,000.00 |
(Amend. of 7-23-2007)
