Procedures and Administration 1
Lot area; |
Floor area; |
Floor area ratio; |
Impervious surface area; |
Impervious surface ratio; and |
Building height |
Process for Residential and Nonresidential Proposal Review | |||||||
|---|---|---|---|---|---|---|---|
Procedure | Type of Proposal | ||||||
Renovation1 | Design2 | Project3 | |||||
1. Optional meeting with Plan Commission to discuss proposal | No | Optional | Recommended | ||||
2. Submit zoning permit application to the Zoning Administrator, including: | Yes | Yes | Yes | ||||
a. Color photos/drawings of existing property, with close-ups of details | Yes | Yes | Yes | ||||
b. Drawings/depictions of proposed changes to the site and building exterior | Yes | Yes | Yes | ||||
c. For new projects or additions > 100 square feet, provide site plan including: i. Chapter block with name of current property owner and applicant; ii. Date of original plan graphic and date of most recent revision; iii. North arrow and graphic scale; iv. Property lines and right-of-way lines (with distances and bearings); v. Easements; vi. Existing and proposed buildings, structures and paved areas; vii. Required building setback lines; viii. Legal description of the property; ix. Location, size, type and orientation of all exterior signage; x. Location, type and orientation of all exterior lighting; xi. Location of all vehicle access drives, circulation areas, loading areas and parking stalls; xii. Location of all outdoor storage and display areas (including trash facilities); xiii. Location and purpose of all drainage facilities; xiv. Location of all permanent green space areas; and xv. Site summary data: lot area, floor area, floor area ratio, impervious surface area, impervious surface ratio | No | No | Yes | ||||
d. Landscaping plan showing the location, size and type of plants | No | No | Yes | ||||
e. Written description of proposal, including exterior materials and colors | Yes | Yes | Yes | ||||
f. Written justification of proposal answering: How does the proposal comply with the design standards? | Yes | Yes | Yes | ||||
3. Review and action by the Zoning Administrator/City staff | Yes | Yes | Yes | ||||
4. Review and action by the Design Review Commission on aesthetics | No | Yes | Yes | ||||
5. Review and action by the Plan Commission on site design | No | No | Yes | ||||
6. If proposal is approved: a. Record documents with Register of Deeds; b. Work must start within 365 days and be complete within 730 days; c. Conditions of approval run with the property. If the proposal is denied: It may not be resubmitted for 12 months. | Yes | Yes | Yes | ||||
KEY: | |
Yes: Step is required. No: Step is not required. | |
1 | Only a renovation of the exterior appearance of a property. |
2 | Only a change in the appearance of a property. |
3 | Modification to the physical configuration of a property. |
Procedures and Administration 1
Lot area; |
Floor area; |
Floor area ratio; |
Impervious surface area; |
Impervious surface ratio; and |
Building height |
Process for Residential and Nonresidential Proposal Review | |||||||
|---|---|---|---|---|---|---|---|
Procedure | Type of Proposal | ||||||
Renovation1 | Design2 | Project3 | |||||
1. Optional meeting with Plan Commission to discuss proposal | No | Optional | Recommended | ||||
2. Submit zoning permit application to the Zoning Administrator, including: | Yes | Yes | Yes | ||||
a. Color photos/drawings of existing property, with close-ups of details | Yes | Yes | Yes | ||||
b. Drawings/depictions of proposed changes to the site and building exterior | Yes | Yes | Yes | ||||
c. For new projects or additions > 100 square feet, provide site plan including: i. Chapter block with name of current property owner and applicant; ii. Date of original plan graphic and date of most recent revision; iii. North arrow and graphic scale; iv. Property lines and right-of-way lines (with distances and bearings); v. Easements; vi. Existing and proposed buildings, structures and paved areas; vii. Required building setback lines; viii. Legal description of the property; ix. Location, size, type and orientation of all exterior signage; x. Location, type and orientation of all exterior lighting; xi. Location of all vehicle access drives, circulation areas, loading areas and parking stalls; xii. Location of all outdoor storage and display areas (including trash facilities); xiii. Location and purpose of all drainage facilities; xiv. Location of all permanent green space areas; and xv. Site summary data: lot area, floor area, floor area ratio, impervious surface area, impervious surface ratio | No | No | Yes | ||||
d. Landscaping plan showing the location, size and type of plants | No | No | Yes | ||||
e. Written description of proposal, including exterior materials and colors | Yes | Yes | Yes | ||||
f. Written justification of proposal answering: How does the proposal comply with the design standards? | Yes | Yes | Yes | ||||
3. Review and action by the Zoning Administrator/City staff | Yes | Yes | Yes | ||||
4. Review and action by the Design Review Commission on aesthetics | No | Yes | Yes | ||||
5. Review and action by the Plan Commission on site design | No | No | Yes | ||||
6. If proposal is approved: a. Record documents with Register of Deeds; b. Work must start within 365 days and be complete within 730 days; c. Conditions of approval run with the property. If the proposal is denied: It may not be resubmitted for 12 months. | Yes | Yes | Yes | ||||
KEY: | |
Yes: Step is required. No: Step is not required. | |
1 | Only a renovation of the exterior appearance of a property. |
2 | Only a change in the appearance of a property. |
3 | Modification to the physical configuration of a property. |