Permits
The building inspector is hereby designated and authorized as the officer charged with the enforcement of this title; from time to time such administration may be entrusted in whole or in part to any other officer without amendment to this title.
HISTORY:
Ord. A-1, 5-21-1981
From the time of the effective date hereof, the building inspector shall not grant a permit for the construction or alteration of any building or structure or the moving of a building or structure onto a lot, if such building or structure would be in violation of any of the provisions of this title, nor shall any officer grant any permit or license for the use of any building or land if such use would be in violation of this title.
HISTORY:
Ord. A-1, 5-21-1981
It shall be the duty of the building inspector to inspect or cause to be inspected all buildings in course of construction or repair. He shall enforce all of the provisions of this title, entering actions in the court when necessary, and his failure to do so shall not legalize any permit unless the plans of and for the proposed erection, construction, reconstruction, alteration and use fully conform to all zoning regulations then in effect.
HISTORY:
Ord. A-1, 5-21-1981
This zoning title, including the maps, may be amended from time to time after thirty (30) days' notice and public hearing, but all proposed amendments shall be first proposed by the planning and zoning commission or shall be submitted to the planning and zoning commission for its recommendation.
HISTORY:
Ord. A-1, 5-21-1981
New areas annexed to the town shall be zoned at the time of annexation.
HISTORY:
Ord. A-1, 5-21-1981
The construction, alteration, repair, removal or occupancy of any structure or any part thereof, as provided or as restricted in this title, shall not be commenced or proceeded with, except after the issuance of a written permit for the same by the building inspector.
HISTORY:
Ord. A-1, 5-21-1981
No land shall be used or occupied and no building hereafter structurally altered or erected shall be used or changed in use, until a certificate of occupancy shall have been issued by the building inspector, stating that the building or the proposed use thereof, or the use of the land, complies with the provisions of this title, or for the renewing, changing or extending of a nonconforming use. A certificate of occupancy either for the whole or a part of a building or structure shall be applied for coincidentally with the application for a building permit, and shall be issued within the ten (10) days after the erection or structural alteration of such building or structure, or part thereof, shall have been completed in conformity with the provisions of this title.
HISTORY:
Ord. A-1, 5-21-1981