Specific Criteria
Speed Limitation on Public Street (miles per hour) | Required Sight Distance (feet) | |
|---|---|---|
25 | 240 | |
30 | 275 | |
35 | 315 | |
40 | 350 | |
45 | 425 | |
50 | 475 | |
55 | 550 |
Table A.1 | ||||||
|---|---|---|---|---|---|---|
Zoning District | Comm. Towers-Current Ordinance | Tower-Based WCF in ROW | Tower-Based WCF out of ROW/40' height or less | Tower-Based WCF/out of ROW/> 40' | WCF on Existing Structure | Eligible Facilities Request |
A/RR | C* | C* | NP | P | P | |
VR | NP | C* | NP | NP | P | P |
GC | SE | C* | C* | C* | P | P |
NC | SE | C* | C* | NP | P | P |
RC | NP | C* | C* | NP | P | P |
I | SE | C* | C* | C* | P | P |
OB | NP | C* | C* | NP | P | P |
BMC | C | C* | C* | C | P | P |
PRRC | N/A | C* | NP | NP | NP** | NP** |
NOTES: | |
* | Subject to Table A.2. |
** | Not Permitted in PRRC except as provided for here. |
Table A.2 Prohibited Zoning | ||
|---|---|---|
WCF Type | Prohibited Zoning Districts | |
A | Tower-based WCF located out of the ROW | Residential lots or properties in residential zoning districts except within A/RR which is permitted by conditional use |
B | Tower-based WCF located in the ROW | Residential zoning districts where all public service utilities are primarily located underground within 100 feet of the proposed tower or base station |
Table B.1 Tower-Based WCFs | |||
|---|---|---|---|
WCF out of ROW | WCF in ROW | ||
Height | Tower-based WCFs shall be designed to minimum functional height. Applicants must submit documentation justifying the total height, not to exceed 120 feet. | Tower-based WCFs shall be designed to minimum functional height, not to exceed 40 feet. | |
The applicant shall furnish expert testimony regarding the construction methods or other measures used to prevent: | The applicant shall furnish expert testimony regarding the construction methods or other measures used to prevent: | ||
(1) The toppling of any structure onto adjoining properties and/or roads; and | (1) The toppling of any structure onto adjoining properties and/or roads; and | ||
(2) The windborne scattering of ice onto adjoining properties and/or roads. | (2) The wind-borne scattering of ice onto adjoining properties and/or roads. | ||
Lot size | Only use on lot or property: | Subject to underlying zoning district. | |
Combined with another use on lot or property in accordance with § 180-30: | Area needed to accommodate the WCF and guy wires, accessory equipment, a security fence and landscaping and screening. | Not applicable | |
Setback | Towers: | Each structure shall be set back from each property line a distance not less than three times its height or that required by the underlying district, whichever is greater. | Not applicable except as otherwise provided in the Zoning Ordinance. |
Equipment buildings/cabinets: | Subject to applicable minimum accessory use or structure setback in the underlying zoning district. | ||
Width | Not applicable | Maximum 18 inches in diameter | |
Table C.1 WCF Review Time Frames | |||
|---|---|---|---|
Municipality shall notify the applicant in writing of any information that may be required to complete application | Municipality shall approve or deny the application unless a shorter time period is applicable under the PA MPC | ||
A | New tower-based WCFs | Within 30 calendar days of the date the application was filed with the municipality | Within 150 days* of submission of a complete application for a WCF |
B | WCF on existing structures | Within 30 calendar days of the date the application was filed with the municipality | Within 90 days* of submission of a complete application for a WCF |
C | Eligible facilities requests** (as defined) | Within 30 calendar days of the date the application was filed with the municipality | Within 60 days* of submission of a complete application for a WCF |
* | The time period may be tolled by mutual agreement or in cases where the municipality informs the applicant in a timely manner that the application is incomplete. If an application is considered incomplete, the time period begins running again as soon as the applicant makes a supplemental submission, but may be tolled again if the municipality provides written notice to the applicant within 10 days that the application remains incomplete and specifically delineates which of the deficiencies specified in the original notice of incompleteness have not been addressed. |
** | The municipality shall only require the applicant to provide documentation that is reasonably related to determining whether the request is for an eligible facility. |
Number of Dwelling Units | Payment | |
|---|---|---|
Up to three dwelling units | $750 per unit | |
Over three dwelling units | $2,000 per unit |
Speed Limitation on Public Street (miles per hour) | Required Sight Distance (feet) | |
|---|---|---|
25 | 240 | |
30 | 275 | |
35 | 315 | |
40 | 350 | |
45 | 425 | |
50 | 475 | |
55 | 550 |
Number of trucks per hour x turnaround time per truck = number of required docks. |
Specific Criteria
Speed Limitation on Public Street (miles per hour) | Required Sight Distance (feet) | |
|---|---|---|
25 | 240 | |
30 | 275 | |
35 | 315 | |
40 | 350 | |
45 | 425 | |
50 | 475 | |
55 | 550 |
Table A.1 | ||||||
|---|---|---|---|---|---|---|
Zoning District | Comm. Towers-Current Ordinance | Tower-Based WCF in ROW | Tower-Based WCF out of ROW/40' height or less | Tower-Based WCF/out of ROW/> 40' | WCF on Existing Structure | Eligible Facilities Request |
A/RR | C* | C* | NP | P | P | |
VR | NP | C* | NP | NP | P | P |
GC | SE | C* | C* | C* | P | P |
NC | SE | C* | C* | NP | P | P |
RC | NP | C* | C* | NP | P | P |
I | SE | C* | C* | C* | P | P |
OB | NP | C* | C* | NP | P | P |
BMC | C | C* | C* | C | P | P |
PRRC | N/A | C* | NP | NP | NP** | NP** |
NOTES: | |
* | Subject to Table A.2. |
** | Not Permitted in PRRC except as provided for here. |
Table A.2 Prohibited Zoning | ||
|---|---|---|
WCF Type | Prohibited Zoning Districts | |
A | Tower-based WCF located out of the ROW | Residential lots or properties in residential zoning districts except within A/RR which is permitted by conditional use |
B | Tower-based WCF located in the ROW | Residential zoning districts where all public service utilities are primarily located underground within 100 feet of the proposed tower or base station |
Table B.1 Tower-Based WCFs | |||
|---|---|---|---|
WCF out of ROW | WCF in ROW | ||
Height | Tower-based WCFs shall be designed to minimum functional height. Applicants must submit documentation justifying the total height, not to exceed 120 feet. | Tower-based WCFs shall be designed to minimum functional height, not to exceed 40 feet. | |
The applicant shall furnish expert testimony regarding the construction methods or other measures used to prevent: | The applicant shall furnish expert testimony regarding the construction methods or other measures used to prevent: | ||
(1) The toppling of any structure onto adjoining properties and/or roads; and | (1) The toppling of any structure onto adjoining properties and/or roads; and | ||
(2) The windborne scattering of ice onto adjoining properties and/or roads. | (2) The wind-borne scattering of ice onto adjoining properties and/or roads. | ||
Lot size | Only use on lot or property: | Subject to underlying zoning district. | |
Combined with another use on lot or property in accordance with § 180-30: | Area needed to accommodate the WCF and guy wires, accessory equipment, a security fence and landscaping and screening. | Not applicable | |
Setback | Towers: | Each structure shall be set back from each property line a distance not less than three times its height or that required by the underlying district, whichever is greater. | Not applicable except as otherwise provided in the Zoning Ordinance. |
Equipment buildings/cabinets: | Subject to applicable minimum accessory use or structure setback in the underlying zoning district. | ||
Width | Not applicable | Maximum 18 inches in diameter | |
Table C.1 WCF Review Time Frames | |||
|---|---|---|---|
Municipality shall notify the applicant in writing of any information that may be required to complete application | Municipality shall approve or deny the application unless a shorter time period is applicable under the PA MPC | ||
A | New tower-based WCFs | Within 30 calendar days of the date the application was filed with the municipality | Within 150 days* of submission of a complete application for a WCF |
B | WCF on existing structures | Within 30 calendar days of the date the application was filed with the municipality | Within 90 days* of submission of a complete application for a WCF |
C | Eligible facilities requests** (as defined) | Within 30 calendar days of the date the application was filed with the municipality | Within 60 days* of submission of a complete application for a WCF |
* | The time period may be tolled by mutual agreement or in cases where the municipality informs the applicant in a timely manner that the application is incomplete. If an application is considered incomplete, the time period begins running again as soon as the applicant makes a supplemental submission, but may be tolled again if the municipality provides written notice to the applicant within 10 days that the application remains incomplete and specifically delineates which of the deficiencies specified in the original notice of incompleteness have not been addressed. |
** | The municipality shall only require the applicant to provide documentation that is reasonably related to determining whether the request is for an eligible facility. |
Number of Dwelling Units | Payment | |
|---|---|---|
Up to three dwelling units | $750 per unit | |
Over three dwelling units | $2,000 per unit |
Speed Limitation on Public Street (miles per hour) | Required Sight Distance (feet) | |
|---|---|---|
25 | 240 | |
30 | 275 | |
35 | 315 | |
40 | 350 | |
45 | 425 | |
50 | 475 | |
55 | 550 |
Number of trucks per hour x turnaround time per truck = number of required docks. |