District Specific Standards
Table 4.1. LDR Form Standards Table 4.1.1. LDR1 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 200 feet minimum |
Lot area | 90,000 square feet minimum | |
Impervious surface | 20% maximum | |
Setbacks (See § 155-3.5, Frontages.)1 | ||
Principal Building (feet) | ||
B | Front | 100 minimum |
C | Side | 20 minimum |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)2 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 100 minimum |
G | Side | 10 minimum |
H | Rear | 10 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building3, 4 | 2 to 3 stories up to 35 feet |
Accessory building | 2 stories up to 20 feet 2 | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fence yard | Permitted | |
Shallow yard | Not permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5I.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Garage location shall be according to § 155-8.4, Parking location. |
2 | Refer to § 155- 3.4F. |
3 | A maximum of 40 feet if the required setbacks (rear and side) are increased 5 feet for every 1 foot of height increase above 35 feet |
4 | Refer to § 155-4.1C(4). |
PB | Principal building |
Table 4.1.2. LDR2 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet minimum |
Lot area | 45,000 square feet minimum | |
Impervious surface | 21% maximum | |
Setbacks (See § 155-3.5, Frontages.)1 | ||
Principal Building (feet) | ||
B | Front | 50 minimum |
C | Side | 20 minimum |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)2 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 50 minimum |
G | Side | 10 minimum |
H | Rear | 10 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building 3, 4 | 2 to 3 stories up to 35 feet |
Accessory building | 2 stories up to 20 feet 2 | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fence yard | Permitted | |
Shallow yard | Not permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5I.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
1 | Garage location shall be according to § 155-8.4, Parking location. |
2 | Refer to § 155-3.4F. |
3 | A maximum of 40 feet if the required setbacks (rear and side) are increased 5 feet for every 1 foot of height increase above 35 feet |
4 | Refer to § 155-4.1C(4). |
PB | Principal building |
Table 4.1.3. LDR3 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 100 feet minimum |
Lot area | 15,000 square feet minimum | |
Impervious surface | 28% maximum | |
Setbacks (See § 155-3.5, Frontages.)1 | ||
Principal Building (feet) | ||
B | Front | 40 minimum |
C | Side | 15 minimum |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)2 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 40 minimum |
G | Side | 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 to 3 stories up to 35 feet(3) |
Accessory building | 2 stories up to 20 feet 2 | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fenced yard | Permitted | |
Shallow yard | Not permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5I.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Garage location shall be according to § 155-8.4, Parking location. |
2 | Refer to § 155-3.4F. |
3 | Refer to § 155-4.1C(4). |
PB | Principal building |
Table 4.1.4. LDR4 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet minimum |
Lot area | 7,500 square feet minimum | |
Impervious surface | 45% maximum | |
Setbacks (See § 155-3.5, Frontages.)1 | ||
Principal Building (feet) | ||
B | Front | Predominant setback4 |
C | Side | 10 minimum |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)2 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 25 minimum |
G | Side | 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 to 3 stories up to 35 feet3 |
Accessory building | 2 stories up to 20 feet2 | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fenced yard | Permitted | |
Shallow yard | Not permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5I, Frontages.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Garage location shall be according to § 155-8.4, Parking location. |
2 | Refer to § 155-3.4F. |
3 | Refer to § 155-4.1C(4). |
4 | See § 155-3.4I, Predominant setback. Where the predominant setback does not apply, the front setback shall be a minimum of 25 feet. |
PB | Principal building |
Table 4.2. MDR Form Standards Table 4.2.1. MDR1 Dimensional Standards [Amended 1-18-2023 by Ord. No. 4258] | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet minimum (SF, DU) |
35 feet minimum per unit (TW) | ||
Lot area | 4,000 square feet minimum per unit | |
Impervious surface | 50% maximum | |
Frontage occupation | 60% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | Predominant setback3 |
C | Side | 0 or 10 minimum 4 |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)5 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 0 or 5 minimum4 |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 to 3 stories up to 35 feet6 |
Accessory building | 2 stories up to 20 feet | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fenced yard | Permitted | |
Shallow yard | Permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5, Frontages.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR, the side setback for the lot shall be that required of the abutting lot's district. |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | See § 155-3.4I, Predominant setback. Where the predominant setback does not apply, the front setback shall be a minimum of 10 feet and a maximum of 20 feet. |
4 | Zero-foot side setback only applies where there is a shared party wall. |
5 | Refer to § 155-3.4F. |
6 | Refer to § 155-4.2C(4). |
PB | Principal building |
SF | Single-family |
TW | Twin |
DU | Duplex |
Table 4.2.2. MDR2 Dimensional Standards [Amended 11-29-2023 by Ord. No. 4283] | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation) | ||
A | Lot width | 50 feet (SF, DU) |
20 feet per unit (RH) | ||
30 feet (TW) | ||
60 feet (QU) | ||
100 feet (SMF, LIMH) | ||
Lot area | 3,000 square feet minimum (SF) | |
2,000 square feet minimum per unit (TW, DU, QU, RH, SMF) | ||
800 square feet minimum per unit (LIMH) | ||
Impervious surface | 50% maximum (SF, TW, DU, QU) | |
60% maximum (RH, SMF) | ||
80% maximum (LIMH) | ||
Frontage occupation | 60% minimum | |
50% minimum (LIMH) | ||
Setbacks (See § 155-3.5, Frontages.)1, 2, 3 | ||
Principal Building (feet) | ||
B | Front | Predominant setback4 |
C | Side | 0 or 10 minimum 5 |
5 minimum (LIMH) | ||
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)6 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 3 stories up to 40 feet |
4 stories up to 52 feet (LIMH) | ||
Accessory building | 2 stories up to 20 feet | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fenced yard | Permitted | |
Shallow yard | Permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5, Frontages.) | ||
Porch | Permitted | |
Stoop | Permitted | |
Common entry | Permitted | |
Arcade/colonnade | Not permitted | |
Gallery | Not permitted | |
Storefront | Not permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR or MDR, the side setback for the lot shall be that required of the abutting lot's district. |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | Where a lot abuts a property zoned LDR or MDR1 at the side or the rear, the lot shall include a buffer of 20 feet in width. |
4 | See § 155-3.4I, Predominant setback. Where the predominant setback does not apply, the front setback shall be a minimum of 10 feet and a maximum of 20 feet. |
5 | Zero-foot side setback only applies where there is a shared party wall. |
6 | Refer to § 155-3.4F. |
PB | Principal building |
SF | Single-family |
DU | Duplex |
QU | Quad |
TW | Twin |
SMF | Small multifamily |
LIMH | Low-income multifamily housing |
RH | Row house |
Table 4.2.3. MDR3 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 50 feet (SF) |
20 feet per unit (RH) | ||
30 feet per unit (TW, DU) | ||
60 feet (QU) | ||
100 feet (SMF, LMF) | ||
Lot area (per unit) | 3,000 square feet minimum (SF) | |
2,000 square feet minimum per unit (TW, DU, QU, RH, SMF, LMF) | ||
Impervious surface | 50% maximum (SF, TW, DU, QU, RH) | |
60% maximum (SMF, LMF) | ||
Frontage occupation | 60% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal building (feet) | ||
B | Front | Predominant setback3 |
C | Side | 0 or 10 minimum4 |
D | Rear | 25 feet minimum |
Accessory Buildings and Structures (feet)5 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 0 or 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 3 stories up to 40 feet6 |
Accessory building | 2 stories up to 20 feet | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5, Frontages.) | ||
Porch | Permitted | |
Stoop | Permitted | |
Common entry | Permitted | |
Arcade/colonnade | Not permitted | |
Gallery | Not permitted | |
Storefront | Not permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR, MDR or MDR2, the side setback for the lot shall be that required of the abutting lot's district. |
Where a lot abuts a property zoned LDR, MDR1 or MDR2 at the side or the rear, the lot shall include a buffer of 20 feet in width. | |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | See § 155-3.4I, Predominant setback. Where the predominant setback does not apply, the front setback shall be a minimum of 10 feet and a maximum of 20 feet. |
4 | A minimum setback of 15 feet is required for buildings over three stories. Zero-foot side setback only applies where there is a shared party wall. |
5 | Shall comply with § 155-3.4F. |
6 | Five stories up to 65 feet maximum with a front stepback of 15 feet after the third floor or 40 feet, whichever occurs first. |
PB | Principal building |
SF | Single-family |
TW | Twin |
DU | Duplex |
QU | Quad |
RH | Row house |
SMF | Small multifamily |
LMF | Large multifamily |
Table 4.3. Commercial Center Form Standards Table 4.3.1. VC Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 16 feet minimum |
Lot area | 1,600 square feet minimum | |
Impervious surface | 70% maximum | |
Frontage occupation | 70% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | 12 minimum/15 maximum |
C | Side | 0 or 5 minimum4 |
D | Rear | None |
Accessory Buildings and Structures (feet) | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 0 or 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 stories minimum to 3 stories up to 40 feet |
Accessory building | n/a | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | Not permitted | |
Facade Type (See § 155-3.5, Frontages.) | ||
Porch | Not permitted | |
Stoop | Permitted | |
Common entry | Permitted | |
Arcade/colonnade | Permitted | |
Gallery | Permitted | |
Storefront | Permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property in an LDR, MDR1, or MDR2 District, the side and rear setback for the lot shall be that required of the abutting lot's district. The setback shall be adjusted to provide a twenty-foot-wide buffer where required. |
Where a lot abuts a property zoned LDR, MDR1, or MDR2, there shall be a buffer of 20 feet in width along the rear property line and side property line extending to the front yard setback. | |
Where a lot abuts a railroad right-of-way at the side or rear with a LDR District on the opposite side of the railroad, the portion of the VC or TC lot abutting the railroad shall include a buffer of 15 feet in width. | |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | (Reserved) |
4 | Or equal to the abutting zone, whichever is greater. Zero-foot side yard setback only applies where there is a shared party wall. |
PB | Principal building |
Table 4.3.2. TC1 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 16 feet minimum |
Lot area | 1,600 square feet minimum | |
Impervious surface | 80% maximum | |
Frontage occupation | 90% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | 12 minimum/15 maximum3 |
C | Side | 0 or 5 minimum4 |
D | Rear | None |
Accessory Buildings and Structures (feet) | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 12 minimum |
G | Side | 0 or 5 minimum |
H | Rear | None |
Building Height (maximum) (See § 55-3.3, Building height.) | ||
I | Principal building | 2 stories minimum to 4 stories maximum 5 |
Accessory building | n/a | |
Accessory structure | 1 story up to 15 feet. | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | permitted | |
Facade Types (See § 155-3.5, Frontages.) | ||
Porch | Not permitted | |
Stoop | Not permitted | |
Common entry | Permitted | |
Arcade/colonnade | Permitted | |
Gallery | Permitted | |
Storefront | Permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR, MDR1, or MDR2, there shall be a buffer of 20 feet in width along the rear property line and side property line extending to the front yard setback. |
Where a lot abuts a railroad right-of-way at the side or rear with a LDR District on the opposite side of the railroad, the VC or TC lot abutting the railroad shall include a buffer of 15 feet in width. | |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | Where adjacent to the LDR, MDR1 and MDR2 Districts, each story above the third story shall be stepped back 15 feet after the third floor or 40 feet, whichever occurs first, in the front and rear. |
4 | Or equal to the abutting zone, whichever is greater. Zero-foot side yard setback only applies where there is a shared party wall. |
5 | Four stories up to 50 feet with a front stepback of 15 feet after the third floor or 40 feet, whichever occurs first, subject to compliance with § 155-4.3C(4) or (5). |
Where adjacent to LDR, MDR1 and MDR2 Districts, each story above the third story shall be stepped back 15 feet after the third floor or 40 feet, whichever occurs first, in the front and rear. | |
PB | Principal building |
Table 4.3.3. TC2 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 25 feet minimum |
Lot area | 5,000 square feet minimum | |
Impervious surface | 70% maximum | |
Frontage occupation | 70% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | 12 minimum/15 maximum |
C | Side | 0 or 5 minimum 3 |
D | Rear | 0 |
Accessory Building and Structure (feet) | ||
E | Front (measured from rear of PB) | 5 minimum |
F | Front corner | 12 minimum |
G | Side | 0 or 5 minimum |
H | Rear | 5 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 stories minimum to 3 stories (40 feet maximum) |
Accessory building | n/a | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | Permitted | |
Facade types (See § 155-3.5, Frontages.) | ||
Porch | Not permitted | |
Stoop | Not permitted | |
Common entry | Permitted | |
Arcade/colonnade | Permitted | |
Gallery | Permitted | |
Storefront | Permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR, MDR1 or MDR2, the side and rear setback for the lot shall be that required of the abutting lot's district. The setback shall be adjusted to provide a twenty-foot-wide buffer, where required. |
Where a lot abuts a property zoned LDR, MDR1, or MDR2, there shall be a buffer of 20 feet in width along the rear property line and side property line extending to the front yard setback. | |
Where a lot abuts a railroad right-of-way at the side or rear with a LDR District on the opposite side of the railroad, the VC or TC lot abutting the railroad shall include a buffer of 15 feet in width. | |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | Or equal to the abutting zone, whichever is greater. Zero-foot side yard setback only applies where there is a shared party wall. |
PB | Principal building |
Table 4.3.4. NC Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 16 feet minimum |
Lot area | 1,600 square feet minimum | |
Impervious surface | 70% maximum | |
Frontage occupation | 70% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | 12 minimum/15 maximum |
C | Side | 0 or 5 minimum4 |
D | Rear | None |
Accessory Buildings and Structures (feet) | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 0 or 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 stories up to 35 feet |
Accessory building | n/a | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | Not permitted | |
Facade Type (See § 155-3.5, Frontages.) | ||
Porch | Not permitted | |
Stoop | Permitted | |
Common entry | Permitted | |
Arcade/colonnade | Permitted | |
Gallery | Permitted | |
Storefront | Permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
1. | Where a lot abuts a property in an LDR, MDR1, or MDR2 District, the side and rear setback for the lot shall be that required of the abutting lot's district. The setback shall be adjusted to provide a twenty-foot-wide buffer where required. |
Where a lot abuts a property zoned LDR, MDR1, or MDR2, there shall be a buffer of 20 feet in width along the rear property line and side property line extending to the front yard setback. | |
Where a lot abuts a railroad right-of-way at the side or rear with a LDR District on the opposite side of the railroad, the portion of the VC, NC or TC lot abutting the railroad shall include a buffer of 15 feet in width. | |
2. | Garage location shall be according to § 155-8.4, Parking location. |
3. | (Reserved) |
4. | Or equal to the abutting zone, whichever is greater. Zero-foot side yard setback only applies where there is a shared party wall. |
PB Principal building | |
Table 4.4. Institution Form Standards Table 4.4.1. Institution Nature Preserve (IN) Dimensional Standards | ||
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet |
Lot area | 45,000 square feet minimum | |
Impervious surface | 21% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 50 |
C | Side | 50 |
D | Rear | 50 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 40 feet2 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
1 | Setbacks may be subject to an increase based on building height. |
2 | Maximum four stories or 52 feet where setbacks are increased by an additional 50 feet. Building may be four stories or 52 feet in height without an increased setback along the primary road. |
Table 4.4.2.A. Institution Civic (IC) - IC1 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet |
Lot area | 45,000 square feet minimum | |
Impervious surface | 26% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 50 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 40 feet3 |
Parking (See Article 8, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Setback may be subject to an increase based on building height |
2 | Minimum twenty-foot buffer is required |
3 | Maximum four stories or 52 feet where setbacks are increased by 50 feet. Buildings may be four stories or 52 feet in height without an increased setback along the primary road. |
Table 4.4.2.B. Institution Civic (IC) - IC2 Dimensional Standards | |||
|---|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | |||
A | Lot width | 100 feet | |
Lot area | 15,000 square feet minimum | ||
Impervious surface | 33% maximum | ||
Setbacks (See § 155-3.5, Frontages.) (feet)1 | |||
B | Front | 40 | |
C | Side | 502 | |
D | Rear | 502 | |
Building Height (maximum) (See § 155-3.3, Building height.) | |||
E | Principal | 3 stories up to 40 feet3 | |
Parking (See Article VIII, Parking Standards.) | |||
NOTES: | |
|---|---|
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum four stories or 52 feet where setbacks are increased 50 feet. Buildings may be four stories or 52 feet in height without an increased setback along the primary road. |
Table 4.4.2.C. Institution Civic (IC) - IC3 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet |
Lot area | 7,500 square feet minimum | |
Impervious surface | 47% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 25 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 40 feet3 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum four stories or 52 feet where setbacks are increased by 50 feet. Buildings may be four stories or 52 feet in height without an increased setback along the primary road. |
Table 4.4.3.A. Institution Education (IE) - IE1 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet |
Lot area | 45,000 square feet minimum | |
Impervious surface | 26% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 50 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet3 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.3.B. Institution Education (IE) - IE2 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 100 feet |
Lot area | 15,000 square feet minimum | |
Impervious surface | 33% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 40 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet3 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.3.C. Institution Education (IE) - IE3 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet |
Lot area | 7,500 square feet minimum | |
Impervious surface | 47% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 25 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet3 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.4.A. Institutional Housing (IH) - IH1 Dimensional Standards1 | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet |
Lot area | 45,000 square feet minimum1 | |
Impervious surface | 21% maximum | |
Setbacks (See § 155-3.5, Frontage.) (feet)2 | ||
B | Front | 50 |
C | Side | 503 |
D | Rear | 503 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet4 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | For continuing-care facility standards refer to § 155-4.4F(3). |
2 | Setbacks may be subject to an increase based on building height. |
3 | Minimum twenty-foot buffer is required. |
4 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.4.B. Institutional Housing (IH) - IH2 Dimensional Standards1 | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 100 feet |
Lot area | 15,000 square feet minimum1 | |
Impervious surface | 28% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)2 | ||
B | Front | 40 |
C | Side | 503 |
D | Rear | 503 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet4 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | For continuing-care facility standards refer to § 155-4.4F(3). |
2 | Setbacks may be subject to an increase based on building height. |
3 | Minimum twenty-foot buffer is required. |
4 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.4C. Institution Housing (IH) - IH3 Dimensional Standards1 | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet |
Lot area | 7,500 square feet minimum1 | |
Impervious surface | 45% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)2 | ||
B | Front | 25 |
C | Side | 503 |
D | Rear | 503 |
Building Height (maximum) (See § 155-3.3, Building Height.) | ||
E | Principal | 3 stories up to 45 feet4 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | For continuing-care facility standards refer to § 155-4.4F(3). |
2 | Setbacks may be subject to an increase based on building height. |
3 | Minimum twenty-foot buffer is required. |
4 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.5. Light Industrial Form Standards Table 4.5.1. LI Dimensional Standards [Amended 7-21-2021 by Ord. No. 4223; 1-18-2023 by Ord. No. 4258] | |
|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | |
Lot width | 100 feet |
Lot area | 2,000 square feet per unit or nonresidential lot |
Impervious surface1 | 80% maximum |
Setbacks (See § 155-3.5, Frontages.)2 | |
Principal building (feet) | |
Front | 12 minimum to 15 |
Side | 0 or 25 minimum |
Rear | 25 minimum |
River frontage3 | 50 minimum |
Railroad right-of-way | 25 minimum |
Accessory Building and Structures (feet) | |
Front (measured from rear of PB) | 20 minimum |
Front corner | 12 minimum |
Side | 0 or 5 minimum |
Rear | None |
Building Height (maximum) (See § 155-3.3, Building height.) | |
Principal building | 2 stories minimum to 10 stories maximum up to 120 feet4 |
Accessory building | n/a |
Accessory structure | 1 story up to 15 feet |
Frontage Yard Types (See § 155-3.5, Frontages.) | |
Common yard | Not permitted |
Fenced yard | Not permitted |
Shallow yard | Permitted |
Urban yard | Permitted |
Pedestrian forecourt | Permitted |
Vehicular forecourt | Permitted |
Facade Types (See § 155-3.5, Frontages.) | |
Porch | Not permitted |
Stoop | Not permitted |
Common entry | Permitted |
Arcade/colonnade | Permitted |
Gallery | Permitted |
Storefront | Permitted |
Parking (See Article VIII, Parking Standards.) | |
NOTES: | |
|---|---|
1 | Refer to § 155-4.5C(5), Impervious surface. |
2 | See § 155-4.5C(4), Additional setbacks. |
3 | Frontage shall be measured from the top of the retaining wall abutting the edge of the Schuylkill River or from an existing street. If the wall ends or is interrupted at any point, the measurement shall be taken from the linear extension of the wall equidistant from the river's edge. |
4 | All buildings with more than two stories require compliance with § 155-4.5L(1). For buildings five stories and above, a maximum of two stories may be devoted to residential uses. |
PB | Principal building |
District Specific Standards
Table 4.1. LDR Form Standards Table 4.1.1. LDR1 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 200 feet minimum |
Lot area | 90,000 square feet minimum | |
Impervious surface | 20% maximum | |
Setbacks (See § 155-3.5, Frontages.)1 | ||
Principal Building (feet) | ||
B | Front | 100 minimum |
C | Side | 20 minimum |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)2 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 100 minimum |
G | Side | 10 minimum |
H | Rear | 10 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building3, 4 | 2 to 3 stories up to 35 feet |
Accessory building | 2 stories up to 20 feet 2 | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fence yard | Permitted | |
Shallow yard | Not permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5I.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Garage location shall be according to § 155-8.4, Parking location. |
2 | Refer to § 155- 3.4F. |
3 | A maximum of 40 feet if the required setbacks (rear and side) are increased 5 feet for every 1 foot of height increase above 35 feet |
4 | Refer to § 155-4.1C(4). |
PB | Principal building |
Table 4.1.2. LDR2 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet minimum |
Lot area | 45,000 square feet minimum | |
Impervious surface | 21% maximum | |
Setbacks (See § 155-3.5, Frontages.)1 | ||
Principal Building (feet) | ||
B | Front | 50 minimum |
C | Side | 20 minimum |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)2 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 50 minimum |
G | Side | 10 minimum |
H | Rear | 10 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building 3, 4 | 2 to 3 stories up to 35 feet |
Accessory building | 2 stories up to 20 feet 2 | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fence yard | Permitted | |
Shallow yard | Not permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5I.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
1 | Garage location shall be according to § 155-8.4, Parking location. |
2 | Refer to § 155-3.4F. |
3 | A maximum of 40 feet if the required setbacks (rear and side) are increased 5 feet for every 1 foot of height increase above 35 feet |
4 | Refer to § 155-4.1C(4). |
PB | Principal building |
Table 4.1.3. LDR3 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 100 feet minimum |
Lot area | 15,000 square feet minimum | |
Impervious surface | 28% maximum | |
Setbacks (See § 155-3.5, Frontages.)1 | ||
Principal Building (feet) | ||
B | Front | 40 minimum |
C | Side | 15 minimum |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)2 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 40 minimum |
G | Side | 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 to 3 stories up to 35 feet(3) |
Accessory building | 2 stories up to 20 feet 2 | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fenced yard | Permitted | |
Shallow yard | Not permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5I.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Garage location shall be according to § 155-8.4, Parking location. |
2 | Refer to § 155-3.4F. |
3 | Refer to § 155-4.1C(4). |
PB | Principal building |
Table 4.1.4. LDR4 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet minimum |
Lot area | 7,500 square feet minimum | |
Impervious surface | 45% maximum | |
Setbacks (See § 155-3.5, Frontages.)1 | ||
Principal Building (feet) | ||
B | Front | Predominant setback4 |
C | Side | 10 minimum |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)2 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 25 minimum |
G | Side | 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 to 3 stories up to 35 feet3 |
Accessory building | 2 stories up to 20 feet2 | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fenced yard | Permitted | |
Shallow yard | Not permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5I, Frontages.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Garage location shall be according to § 155-8.4, Parking location. |
2 | Refer to § 155-3.4F. |
3 | Refer to § 155-4.1C(4). |
4 | See § 155-3.4I, Predominant setback. Where the predominant setback does not apply, the front setback shall be a minimum of 25 feet. |
PB | Principal building |
Table 4.2. MDR Form Standards Table 4.2.1. MDR1 Dimensional Standards [Amended 1-18-2023 by Ord. No. 4258] | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet minimum (SF, DU) |
35 feet minimum per unit (TW) | ||
Lot area | 4,000 square feet minimum per unit | |
Impervious surface | 50% maximum | |
Frontage occupation | 60% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | Predominant setback3 |
C | Side | 0 or 10 minimum 4 |
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)5 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 0 or 5 minimum4 |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 to 3 stories up to 35 feet6 |
Accessory building | 2 stories up to 20 feet | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fenced yard | Permitted | |
Shallow yard | Permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5, Frontages.) | ||
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR, the side setback for the lot shall be that required of the abutting lot's district. |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | See § 155-3.4I, Predominant setback. Where the predominant setback does not apply, the front setback shall be a minimum of 10 feet and a maximum of 20 feet. |
4 | Zero-foot side setback only applies where there is a shared party wall. |
5 | Refer to § 155-3.4F. |
6 | Refer to § 155-4.2C(4). |
PB | Principal building |
SF | Single-family |
TW | Twin |
DU | Duplex |
Table 4.2.2. MDR2 Dimensional Standards [Amended 11-29-2023 by Ord. No. 4283] | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation) | ||
A | Lot width | 50 feet (SF, DU) |
20 feet per unit (RH) | ||
30 feet (TW) | ||
60 feet (QU) | ||
100 feet (SMF, LIMH) | ||
Lot area | 3,000 square feet minimum (SF) | |
2,000 square feet minimum per unit (TW, DU, QU, RH, SMF) | ||
800 square feet minimum per unit (LIMH) | ||
Impervious surface | 50% maximum (SF, TW, DU, QU) | |
60% maximum (RH, SMF) | ||
80% maximum (LIMH) | ||
Frontage occupation | 60% minimum | |
50% minimum (LIMH) | ||
Setbacks (See § 155-3.5, Frontages.)1, 2, 3 | ||
Principal Building (feet) | ||
B | Front | Predominant setback4 |
C | Side | 0 or 10 minimum 5 |
5 minimum (LIMH) | ||
D | Rear | 25 minimum |
Accessory Buildings and Structures (feet)6 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 3 stories up to 40 feet |
4 stories up to 52 feet (LIMH) | ||
Accessory building | 2 stories up to 20 feet | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Permitted | |
Fenced yard | Permitted | |
Shallow yard | Permitted | |
Urban yard | Not permitted | |
Pedestrian forecourt | Not permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5, Frontages.) | ||
Porch | Permitted | |
Stoop | Permitted | |
Common entry | Permitted | |
Arcade/colonnade | Not permitted | |
Gallery | Not permitted | |
Storefront | Not permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR or MDR, the side setback for the lot shall be that required of the abutting lot's district. |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | Where a lot abuts a property zoned LDR or MDR1 at the side or the rear, the lot shall include a buffer of 20 feet in width. |
4 | See § 155-3.4I, Predominant setback. Where the predominant setback does not apply, the front setback shall be a minimum of 10 feet and a maximum of 20 feet. |
5 | Zero-foot side setback only applies where there is a shared party wall. |
6 | Refer to § 155-3.4F. |
PB | Principal building |
SF | Single-family |
DU | Duplex |
QU | Quad |
TW | Twin |
SMF | Small multifamily |
LIMH | Low-income multifamily housing |
RH | Row house |
Table 4.2.3. MDR3 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 50 feet (SF) |
20 feet per unit (RH) | ||
30 feet per unit (TW, DU) | ||
60 feet (QU) | ||
100 feet (SMF, LMF) | ||
Lot area (per unit) | 3,000 square feet minimum (SF) | |
2,000 square feet minimum per unit (TW, DU, QU, RH, SMF, LMF) | ||
Impervious surface | 50% maximum (SF, TW, DU, QU, RH) | |
60% maximum (SMF, LMF) | ||
Frontage occupation | 60% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal building (feet) | ||
B | Front | Predominant setback3 |
C | Side | 0 or 10 minimum4 |
D | Rear | 25 feet minimum |
Accessory Buildings and Structures (feet)5 | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 0 or 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 3 stories up to 40 feet6 |
Accessory building | 2 stories up to 20 feet | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | Not permitted | |
Facade Types (See § 155-3.5, Frontages.) | ||
Porch | Permitted | |
Stoop | Permitted | |
Common entry | Permitted | |
Arcade/colonnade | Not permitted | |
Gallery | Not permitted | |
Storefront | Not permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR, MDR or MDR2, the side setback for the lot shall be that required of the abutting lot's district. |
Where a lot abuts a property zoned LDR, MDR1 or MDR2 at the side or the rear, the lot shall include a buffer of 20 feet in width. | |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | See § 155-3.4I, Predominant setback. Where the predominant setback does not apply, the front setback shall be a minimum of 10 feet and a maximum of 20 feet. |
4 | A minimum setback of 15 feet is required for buildings over three stories. Zero-foot side setback only applies where there is a shared party wall. |
5 | Shall comply with § 155-3.4F. |
6 | Five stories up to 65 feet maximum with a front stepback of 15 feet after the third floor or 40 feet, whichever occurs first. |
PB | Principal building |
SF | Single-family |
TW | Twin |
DU | Duplex |
QU | Quad |
RH | Row house |
SMF | Small multifamily |
LMF | Large multifamily |
Table 4.3. Commercial Center Form Standards Table 4.3.1. VC Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 16 feet minimum |
Lot area | 1,600 square feet minimum | |
Impervious surface | 70% maximum | |
Frontage occupation | 70% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | 12 minimum/15 maximum |
C | Side | 0 or 5 minimum4 |
D | Rear | None |
Accessory Buildings and Structures (feet) | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 0 or 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 stories minimum to 3 stories up to 40 feet |
Accessory building | n/a | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | Not permitted | |
Facade Type (See § 155-3.5, Frontages.) | ||
Porch | Not permitted | |
Stoop | Permitted | |
Common entry | Permitted | |
Arcade/colonnade | Permitted | |
Gallery | Permitted | |
Storefront | Permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property in an LDR, MDR1, or MDR2 District, the side and rear setback for the lot shall be that required of the abutting lot's district. The setback shall be adjusted to provide a twenty-foot-wide buffer where required. |
Where a lot abuts a property zoned LDR, MDR1, or MDR2, there shall be a buffer of 20 feet in width along the rear property line and side property line extending to the front yard setback. | |
Where a lot abuts a railroad right-of-way at the side or rear with a LDR District on the opposite side of the railroad, the portion of the VC or TC lot abutting the railroad shall include a buffer of 15 feet in width. | |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | (Reserved) |
4 | Or equal to the abutting zone, whichever is greater. Zero-foot side yard setback only applies where there is a shared party wall. |
PB | Principal building |
Table 4.3.2. TC1 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 16 feet minimum |
Lot area | 1,600 square feet minimum | |
Impervious surface | 80% maximum | |
Frontage occupation | 90% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | 12 minimum/15 maximum3 |
C | Side | 0 or 5 minimum4 |
D | Rear | None |
Accessory Buildings and Structures (feet) | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 12 minimum |
G | Side | 0 or 5 minimum |
H | Rear | None |
Building Height (maximum) (See § 55-3.3, Building height.) | ||
I | Principal building | 2 stories minimum to 4 stories maximum 5 |
Accessory building | n/a | |
Accessory structure | 1 story up to 15 feet. | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | permitted | |
Facade Types (See § 155-3.5, Frontages.) | ||
Porch | Not permitted | |
Stoop | Not permitted | |
Common entry | Permitted | |
Arcade/colonnade | Permitted | |
Gallery | Permitted | |
Storefront | Permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR, MDR1, or MDR2, there shall be a buffer of 20 feet in width along the rear property line and side property line extending to the front yard setback. |
Where a lot abuts a railroad right-of-way at the side or rear with a LDR District on the opposite side of the railroad, the VC or TC lot abutting the railroad shall include a buffer of 15 feet in width. | |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | Where adjacent to the LDR, MDR1 and MDR2 Districts, each story above the third story shall be stepped back 15 feet after the third floor or 40 feet, whichever occurs first, in the front and rear. |
4 | Or equal to the abutting zone, whichever is greater. Zero-foot side yard setback only applies where there is a shared party wall. |
5 | Four stories up to 50 feet with a front stepback of 15 feet after the third floor or 40 feet, whichever occurs first, subject to compliance with § 155-4.3C(4) or (5). |
Where adjacent to LDR, MDR1 and MDR2 Districts, each story above the third story shall be stepped back 15 feet after the third floor or 40 feet, whichever occurs first, in the front and rear. | |
PB | Principal building |
Table 4.3.3. TC2 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 25 feet minimum |
Lot area | 5,000 square feet minimum | |
Impervious surface | 70% maximum | |
Frontage occupation | 70% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | 12 minimum/15 maximum |
C | Side | 0 or 5 minimum 3 |
D | Rear | 0 |
Accessory Building and Structure (feet) | ||
E | Front (measured from rear of PB) | 5 minimum |
F | Front corner | 12 minimum |
G | Side | 0 or 5 minimum |
H | Rear | 5 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 stories minimum to 3 stories (40 feet maximum) |
Accessory building | n/a | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | Permitted | |
Facade types (See § 155-3.5, Frontages.) | ||
Porch | Not permitted | |
Stoop | Not permitted | |
Common entry | Permitted | |
Arcade/colonnade | Permitted | |
Gallery | Permitted | |
Storefront | Permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Where a lot abuts a property zoned LDR, MDR1 or MDR2, the side and rear setback for the lot shall be that required of the abutting lot's district. The setback shall be adjusted to provide a twenty-foot-wide buffer, where required. |
Where a lot abuts a property zoned LDR, MDR1, or MDR2, there shall be a buffer of 20 feet in width along the rear property line and side property line extending to the front yard setback. | |
Where a lot abuts a railroad right-of-way at the side or rear with a LDR District on the opposite side of the railroad, the VC or TC lot abutting the railroad shall include a buffer of 15 feet in width. | |
2 | Garage location shall be according to § 155-8.4, Parking location. |
3 | Or equal to the abutting zone, whichever is greater. Zero-foot side yard setback only applies where there is a shared party wall. |
PB | Principal building |
Table 4.3.4. NC Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 16 feet minimum |
Lot area | 1,600 square feet minimum | |
Impervious surface | 70% maximum | |
Frontage occupation | 70% minimum | |
Setbacks (See § 155-3.5, Frontages.)1, 2 | ||
Principal Building (feet) | ||
B | Front | 12 minimum/15 maximum |
C | Side | 0 or 5 minimum4 |
D | Rear | None |
Accessory Buildings and Structures (feet) | ||
E | Front (measured from rear of PB) | 20 minimum |
F | Front corner | 10 minimum |
G | Side | 0 or 5 minimum |
H | Rear | 5 minimum |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
I | Principal building | 2 stories up to 35 feet |
Accessory building | n/a | |
Accessory structure | 1 story up to 15 feet | |
Frontage Yard Types (See § 155-3.5, Frontages.) | ||
Common yard | Not permitted | |
Fenced yard | Not permitted | |
Shallow yard | Permitted | |
Urban yard | Permitted | |
Pedestrian forecourt | Permitted | |
Vehicular forecourt | Not permitted | |
Facade Type (See § 155-3.5, Frontages.) | ||
Porch | Not permitted | |
Stoop | Permitted | |
Common entry | Permitted | |
Arcade/colonnade | Permitted | |
Gallery | Permitted | |
Storefront | Permitted | |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
1. | Where a lot abuts a property in an LDR, MDR1, or MDR2 District, the side and rear setback for the lot shall be that required of the abutting lot's district. The setback shall be adjusted to provide a twenty-foot-wide buffer where required. |
Where a lot abuts a property zoned LDR, MDR1, or MDR2, there shall be a buffer of 20 feet in width along the rear property line and side property line extending to the front yard setback. | |
Where a lot abuts a railroad right-of-way at the side or rear with a LDR District on the opposite side of the railroad, the portion of the VC, NC or TC lot abutting the railroad shall include a buffer of 15 feet in width. | |
2. | Garage location shall be according to § 155-8.4, Parking location. |
3. | (Reserved) |
4. | Or equal to the abutting zone, whichever is greater. Zero-foot side yard setback only applies where there is a shared party wall. |
PB Principal building | |
Table 4.4. Institution Form Standards Table 4.4.1. Institution Nature Preserve (IN) Dimensional Standards | ||
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet |
Lot area | 45,000 square feet minimum | |
Impervious surface | 21% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 50 |
C | Side | 50 |
D | Rear | 50 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 40 feet2 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
1 | Setbacks may be subject to an increase based on building height. |
2 | Maximum four stories or 52 feet where setbacks are increased by an additional 50 feet. Building may be four stories or 52 feet in height without an increased setback along the primary road. |
Table 4.4.2.A. Institution Civic (IC) - IC1 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet |
Lot area | 45,000 square feet minimum | |
Impervious surface | 26% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 50 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 40 feet3 |
Parking (See Article 8, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Setback may be subject to an increase based on building height |
2 | Minimum twenty-foot buffer is required |
3 | Maximum four stories or 52 feet where setbacks are increased by 50 feet. Buildings may be four stories or 52 feet in height without an increased setback along the primary road. |
Table 4.4.2.B. Institution Civic (IC) - IC2 Dimensional Standards | |||
|---|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | |||
A | Lot width | 100 feet | |
Lot area | 15,000 square feet minimum | ||
Impervious surface | 33% maximum | ||
Setbacks (See § 155-3.5, Frontages.) (feet)1 | |||
B | Front | 40 | |
C | Side | 502 | |
D | Rear | 502 | |
Building Height (maximum) (See § 155-3.3, Building height.) | |||
E | Principal | 3 stories up to 40 feet3 | |
Parking (See Article VIII, Parking Standards.) | |||
NOTES: | |
|---|---|
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum four stories or 52 feet where setbacks are increased 50 feet. Buildings may be four stories or 52 feet in height without an increased setback along the primary road. |
Table 4.4.2.C. Institution Civic (IC) - IC3 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet |
Lot area | 7,500 square feet minimum | |
Impervious surface | 47% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 25 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 40 feet3 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum four stories or 52 feet where setbacks are increased by 50 feet. Buildings may be four stories or 52 feet in height without an increased setback along the primary road. |
Table 4.4.3.A. Institution Education (IE) - IE1 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet |
Lot area | 45,000 square feet minimum | |
Impervious surface | 26% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 50 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet3 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.3.B. Institution Education (IE) - IE2 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 100 feet |
Lot area | 15,000 square feet minimum | |
Impervious surface | 33% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 40 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet3 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.3.C. Institution Education (IE) - IE3 Dimensional Standards | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet |
Lot area | 7,500 square feet minimum | |
Impervious surface | 47% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)1 | ||
B | Front | 25 |
C | Side | 502 |
D | Rear | 502 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet3 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
1 | Setbacks may be subject to an increase based on building height. |
2 | Minimum twenty-foot buffer is required |
3 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.4.A. Institutional Housing (IH) - IH1 Dimensional Standards1 | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 150 feet |
Lot area | 45,000 square feet minimum1 | |
Impervious surface | 21% maximum | |
Setbacks (See § 155-3.5, Frontage.) (feet)2 | ||
B | Front | 50 |
C | Side | 503 |
D | Rear | 503 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet4 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | For continuing-care facility standards refer to § 155-4.4F(3). |
2 | Setbacks may be subject to an increase based on building height. |
3 | Minimum twenty-foot buffer is required. |
4 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.4.B. Institutional Housing (IH) - IH2 Dimensional Standards1 | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 100 feet |
Lot area | 15,000 square feet minimum1 | |
Impervious surface | 28% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)2 | ||
B | Front | 40 |
C | Side | 503 |
D | Rear | 503 |
Building Height (maximum) (See § 155-3.3, Building height.) | ||
E | Principal | 3 stories up to 45 feet4 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | For continuing-care facility standards refer to § 155-4.4F(3). |
2 | Setbacks may be subject to an increase based on building height. |
3 | Minimum twenty-foot buffer is required. |
4 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.4.4C. Institution Housing (IH) - IH3 Dimensional Standards1 | ||
|---|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | ||
A | Lot width | 60 feet |
Lot area | 7,500 square feet minimum1 | |
Impervious surface | 45% maximum | |
Setbacks (See § 155-3.5, Frontages.) (feet)2 | ||
B | Front | 25 |
C | Side | 503 |
D | Rear | 503 |
Building Height (maximum) (See § 155-3.3, Building Height.) | ||
E | Principal | 3 stories up to 45 feet4 |
Parking (See Article VIII, Parking Standards.) | ||
NOTES: | |
|---|---|
1 | For continuing-care facility standards refer to § 155-4.4F(3). |
2 | Setbacks may be subject to an increase based on building height. |
3 | Minimum twenty-foot buffer is required. |
4 | Maximum five stories, up to 65 feet where setbacks are increased by an additional 50 feet for each 10 feet above the three-story or forty-five-foot height limit. This increased setback requirement is not required along any primary road. |
Table 4.5. Light Industrial Form Standards Table 4.5.1. LI Dimensional Standards [Amended 7-21-2021 by Ord. No. 4223; 1-18-2023 by Ord. No. 4258] | |
|---|---|
Lot Occupation (See § 155-3.4, Lot occupation.) | |
Lot width | 100 feet |
Lot area | 2,000 square feet per unit or nonresidential lot |
Impervious surface1 | 80% maximum |
Setbacks (See § 155-3.5, Frontages.)2 | |
Principal building (feet) | |
Front | 12 minimum to 15 |
Side | 0 or 25 minimum |
Rear | 25 minimum |
River frontage3 | 50 minimum |
Railroad right-of-way | 25 minimum |
Accessory Building and Structures (feet) | |
Front (measured from rear of PB) | 20 minimum |
Front corner | 12 minimum |
Side | 0 or 5 minimum |
Rear | None |
Building Height (maximum) (See § 155-3.3, Building height.) | |
Principal building | 2 stories minimum to 10 stories maximum up to 120 feet4 |
Accessory building | n/a |
Accessory structure | 1 story up to 15 feet |
Frontage Yard Types (See § 155-3.5, Frontages.) | |
Common yard | Not permitted |
Fenced yard | Not permitted |
Shallow yard | Permitted |
Urban yard | Permitted |
Pedestrian forecourt | Permitted |
Vehicular forecourt | Permitted |
Facade Types (See § 155-3.5, Frontages.) | |
Porch | Not permitted |
Stoop | Not permitted |
Common entry | Permitted |
Arcade/colonnade | Permitted |
Gallery | Permitted |
Storefront | Permitted |
Parking (See Article VIII, Parking Standards.) | |
NOTES: | |
|---|---|
1 | Refer to § 155-4.5C(5), Impervious surface. |
2 | See § 155-4.5C(4), Additional setbacks. |
3 | Frontage shall be measured from the top of the retaining wall abutting the edge of the Schuylkill River or from an existing street. If the wall ends or is interrupted at any point, the measurement shall be taken from the linear extension of the wall equidistant from the river's edge. |
4 | All buildings with more than two stories require compliance with § 155-4.5L(1). For buildings five stories and above, a maximum of two stories may be devoted to residential uses. |
PB | Principal building |