I Industrial District
Dimensional Requirement | By-Right Permitted Uses | Class One Conditional Uses | Class Two Conditional Uses |
|---|---|---|---|
Minimum net lot size (acres) | 3 | 10 | 1 |
Minimum lot width (measured at the building line or at the point of the proposed building closest to the street and extending the full depth of the building) (feet) | 200 | 300 | 150 |
Maximum building height (maximum of 4 stories above ground level) (feet) | 65 | 45 | 35 |
Minimum front yard setback (measured from the ultimate right-of-way of each street on which the lot fronts) (feet) | 75 | 100 | 40 |
Minimum side yard setback (feet) | 25 | 50 | 25 |
Minimum rear yard setback | 40 | 75 | 40 |
Minimum building setback from residential zoning district boundary lines when no additional buffering is provided (feet) | 150 | Not applicable | 150 |
Minimum building setback from residential district boundary lines when additional buffering is provided as outlined in § 164-76A(2) (feet) | 75 | 200 | 75 |
Minimum parking area setback from residential zoning district boundary lines when no additional buffering is provided (feet) | 75 | Not applicable | 75 |
Minimum parking area setback from residential zoning district boundary lines when additional buffering is provided as outlined in § 164-76A(2) (feet) | 50 | 75 | 50 |
Minimum off-street loading area setback from residential zoning district boundary lines (feet) | 200 | 200 | 100 |
Maximum building coverage (percentage of net lot area) | 20%, plus 2.5% per acre, not to exceed 40% | 25% | 20% |
Maximum impervious coverage (percentage of net lot area) | 75% | 50% | 60% |
Minimum green space (percentage of net lot area) | 25% | 50% | 40% |
Minimum setback between buildings on the same lot (feet) | 25 | 25 | One building per lot |
Maximum Permitted Sound Pressure Level (decibels dBA scale) | |||
|---|---|---|---|
Along Boundaries with Residential Districts or Uses, between 7:00 a.m. and 10:00 p.m. | Along Boundaries with Residential Districts or Uses, between 10:00 p.m. and 7:00 a.m. | Along All Other Boundaries | |
60 | 50 | 65 | |
I Industrial District
Dimensional Requirement | By-Right Permitted Uses | Class One Conditional Uses | Class Two Conditional Uses |
|---|---|---|---|
Minimum net lot size (acres) | 3 | 10 | 1 |
Minimum lot width (measured at the building line or at the point of the proposed building closest to the street and extending the full depth of the building) (feet) | 200 | 300 | 150 |
Maximum building height (maximum of 4 stories above ground level) (feet) | 65 | 45 | 35 |
Minimum front yard setback (measured from the ultimate right-of-way of each street on which the lot fronts) (feet) | 75 | 100 | 40 |
Minimum side yard setback (feet) | 25 | 50 | 25 |
Minimum rear yard setback | 40 | 75 | 40 |
Minimum building setback from residential zoning district boundary lines when no additional buffering is provided (feet) | 150 | Not applicable | 150 |
Minimum building setback from residential district boundary lines when additional buffering is provided as outlined in § 164-76A(2) (feet) | 75 | 200 | 75 |
Minimum parking area setback from residential zoning district boundary lines when no additional buffering is provided (feet) | 75 | Not applicable | 75 |
Minimum parking area setback from residential zoning district boundary lines when additional buffering is provided as outlined in § 164-76A(2) (feet) | 50 | 75 | 50 |
Minimum off-street loading area setback from residential zoning district boundary lines (feet) | 200 | 200 | 100 |
Maximum building coverage (percentage of net lot area) | 20%, plus 2.5% per acre, not to exceed 40% | 25% | 20% |
Maximum impervious coverage (percentage of net lot area) | 75% | 50% | 60% |
Minimum green space (percentage of net lot area) | 25% | 50% | 40% |
Minimum setback between buildings on the same lot (feet) | 25 | 25 | One building per lot |
Maximum Permitted Sound Pressure Level (decibels dBA scale) | |||
|---|---|---|---|
Along Boundaries with Residential Districts or Uses, between 7:00 a.m. and 10:00 p.m. | Along Boundaries with Residential Districts or Uses, between 10:00 p.m. and 7:00 a.m. | Along All Other Boundaries | |
60 | 50 | 65 | |