A building permit shall be secured from the Construction Official prior to the erection or alteration of any building or structure or part of a building or structure. All applications for building permits shall be made to the Construction Official, in writing, with a statement of the use and intended use of the property by the owner or his authorized representative. Each application shall be accompanied by a plan, in quadruplicate, drawn to scale, showing a full description of the location, shape and dimension of the lot to be built upon, its block and lot number as recorded, the size and location of existing buildings thereon, existing and new grades, lines within which the proposed building or buildings are to be erected, location and dimension of off-street parking areas, dimensions of all open spaces, the number of square feet of lot area as well as the number of square feet to be occupied by buildings, the percentage of lot coverage, the existing and intended use as well as height of each building or part thereof and the location and dimensions of proposed new construction. The applicant shall also give such other pertinent information regarding the proposed use of the property as may be necessary to determine the property of the issuance of a building permit and certificate of occupancy. If construction is not started within 12 months after issuance of a permit, the permit is void, and no fees shall be refunded. Whenever plot plans, maps or surveys are required, they shall be in accordance with the Uniform Construction Code.