18.26.010 – Statement of Purpose

  • Special Flood Hazard Areas.
    1. Statement of Purpose. It is the purpose of this Subsection to provide property owners with the opportunity to purchase affordable flood insurance, acquire financial assistance, and promote the public health, safety, and general welfare, and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:
      1. Protect human life and health;
      2. Minimize expenditure of public money for costly flood control projects;
      3. Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the public;
      4. Minimize prolonged business interruptions;
      5. Minimize damage to public facilities and utilities (i.e., water and gas mains; electric, telephone and sewer lines; and streets and bridges) located in areas of special flood hazard;
      6. Help maintain a stable tax base by providing for the sound use and development of areas of special flood hazard so as to minimize future blighted areas caused by flood damage;
      7. Ensure that potential buyers are notified that the property is in an area of special flood hazard; and,
      8. Ensure that those who occupy the areas of special flood hazard assume responsibility for their actions.
    2. Statutory Authorization. The State Government Code Sections 65302, 65560, and 65800 conferred upon local government unit’s authority to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the Board does adopt the following floodplain management regulations.
    3. Finding of Fact. The National Flood Insurance Act of 1968 authorized the National Flood Insurance Program, which represented a new approach to assisting the victims of flooding by providing an opportunity for property owners to purchase from the Federal government insurance protection for structures exposed to the perils of flooding. Then in 1973 the Act was modified to require the purchase of flood insurance as a condition of receiving any form of Federal or Federally-related financial assistance on any improvement located in any area that has been identified by the Director of the Federal Emergency Management Agency (FEMA) as a special flood hazard area. The Act also requires Federal financial regulatory agencies subject to their regulatory authority to direct lenders to require borrowers, whose security consists of structures located in a special flood hazard area, to purchase flood insurance.
      1. FEMA has identified special flood hazard areas in the County that are subject to periodic inundation which may result in loss of life and property, cause health and safety hazards, disruption of commerce and governmental services, increase public expenditures for flood protection relief, and impairment of the tax base, all of which adversely affects the public health, safety, and general welfare.
      2. Many of the above described flood losses are caused by uses that are inadequately elevated, flood proofed, or protected from flood damage. The cumulative effect of obstructions in areas of special flood hazards which increase flood heights and velocities also contribute to the flood loss.
    4. Methods of Reducing Flood Losses. In order to accomplish its purposes, this Subsection includes methods and provisions to:
      1. Restrict or prohibit uses which are dangerous to health, safety, and property due to water or erosion hazards, or which result in damaging increases in erosion or flood heights or velocities;
      2. Require that uses vulnerable to floods, including facilities which serve these uses, be protected against flood damage at the time of initial construction;
      3. Control the alteration of natural floodplains, stream channels, and natural protective barriers, which help accommodate or channel floodwaters;
      4. Control filling, grading, dredging, and other development which may increase flood damage; and,
      5. Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards in other areas.
  • (Ord. No. 1976, 2019)

    18.26.020 – Definitions

    Unless otherwise specified below, the following words or phrases are limited to use in this Chapter. Additionally, words or phrases shall be interpreted so as to give them the meaning they have in common usage and to give this Chapter it's most reasonable application.

    18.26.030 – General Provisions

  • Lands to Which this Chapter Applies. This chapter shall apply to all areas of special flood hazards within the jurisdiction of Merced County.

  • Basis for Establishing the areas of Special Flood Hazard. The areas of special flood hazard identified by the Federal Insurance Administration (FIA) of the Federal Emergency Management Agency (FEMA) in the Flood Insurance Study (FIS) dated August 2, 1995 and accompanying Flood Insurance Rate Maps (FIRMs) dated August 2, 1995, and all subsequent amendments and/or revisions, are adopted by reference and declared to be a part of this chapter. This FIS and attendant mapping is the minimum area of applicability of this chapter and may be supplemented by studies for other areas which allow implementation of this chapter and which are recommended to the board of supervisors by the floodplain administrator. The study, and FIRMs are on file at 2222 “M” Street, County Administration Building, Community and Economic Development Department.

  • Compliance. No structure or land shall hereafter be constructed, located, extended, converted, or altered without full compliance with the term of this chapter and other applicable regulations. Violation of the requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Nothing herein shall prevent the board of supervisors from taking such lawful action as is necessary to prevent or remedy any violation.

  • Abrogation and Greater Restrictions. This chapter is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this chapter and another chapter, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail.

  • Interpretation. In the interpretation and application of this chapter, all provisions shall be:

    1. Considered as minimum requirements;

    2. Liberally construed in favor of the governing body; and,

    3. Deemed neither to limit nor repeal any other powers granted under state statutes.

  • Warning and Disclaimer of Liability. The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by man-made or natural causes. This chapter does not imply that land outside the areas of special flood hazards or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of board of supervisors, any officer or employee thereof, the state of California, or the Federal Insurance Administration, Federal Emergency Management Agency, for any flood damages that result from reliance on this chapter or any administrative decision lawfully made hereunder.

  • Severability. The ordinance codified in this chapter and the various parts thereof are declared to be severable. Should any section of said ordinance be declared by the courts to be unconstitutional or invalid, such decision shall not affect the validity of said ordinance as a whole, or any portion thereof other than the section so declared to be unconstitutional or invalid.

  • (Ord. No. 1976, 2019)

    18.26.040 – Administration

  • Establishment of Development Permit. A development permit shall be obtained before any construction or other development begins within any area of special flood hazard established in Subparagraph 18.26.030(B) (General Provisions: Basis for Establishing the Areas of Special Flood Hazard). Application for a development permit shall be made on forms furnished by the Floodplain Administrator or Director and may include, but not be limited to: plans in duplicate drawn to scale showing the nature, location, dimensions, and elevation of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities; and the location of the foregoing. Specifically, the following information is required:
    1. Site plan, including but not limited to:
      1. For all proposed structures, spot ground elevations at building corners and 20 foot or smaller intervals along the foundation footprint, or one-foot contour elevations throughout the building site;
      2. Proposed locations of water supply, sanitary sewer, and utilities;
      3. If available, the base flood elevation from the Flood Insurance Study and/or Flood Insurance Rate Map; and,
      4. If applicable, the location of the regulatory floodway;
    2. Foundation design detail, including but not limited to:
      1. Proposed elevation in relation to mean sea level, of the lowest floor (including basement) of all structures;
      2. For a crawl-space foundation, location and total net area of foundation openings as required in Section 18.26.050(A)(3) (Provisions for Flood Hazard Reduction: Elevation and Floodproofing) and FEMA Technical Bulletins 1-93 and 7-93; and,
      3. For foundations placed on fill, the location and height of fill, and compaction requirements (compacted to ninety-five (95) percent using the Standard Proctor Test method);
    3. Proposed elevation in relation to mean sea level to which any non-residential structure will be floodproofed, as required in Section 18.34.050(A)(3)(b) (Provisions for Flood Hazard Reduction: Elevation and Floodproofing) of this chapter and FEMA Technical Bulletin TB 3-93;
    4. All appropriate certifications listed in Subparagraph (C)(4) below, and,
    5. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development.
  • Designation of the Floodplain Administrator. The Director of Public Works, is designated as the Floodplain Administrator to administer, implement, and enforce this Chapter by granting or denying development permits in compliance with it's provisions.
  • Duties and Responsibilities of the Floodplain Administrator. The duties and responsibilities of the Floodplain Administrator shall include, but not be limited to, the following:
    1. Permit Review. Review all development permits to determine that:
      1. Permit requirements of this chapter have been satisfied;
      2. All other required State and Federal permits have been obtained;
      3. The site is reasonably safe from flooding; and,
      4. The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. For purposes of this chapter, “adversely affects” means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will increase the water surface elevation of the base flood more than one foot at any point.
    2. Review and Use of Any Other Base Flood Data. When base flood elevation data has not been provided in accordance with Subparagraph 18.26.030(B) (General Provisions: Basis for Establishing Areas of Special Flood Hazard), the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a Federal or State agency, or other source in order to administer Section 18.26.050 (Provisions for Flood Hazard Reduction); or,
      1. If no base flood elevation data is available from a Federal or State agency or other source, then a base flood elevation shall be obtained using one of two methods from the FEMA publication “Managing Floodplain Development in Approximate Zone A Areas - A Guide for Obtaining and Developing Base (100-year) Flood Elevations,” dated July 1995 in order to administer Section 18.26.050 (Provisions for Flood Hazard Reduction).
        1. Simplified Method. A 100 year or base flood discharge shall be obtained using the appropriate regression equation found in a U.S. Geological Survey publication, or the discharge-drainage area method. The base flood elevation shall be obtained using the Quick-2 computer program developed by FEMA; or,
        2. Detailed Method. A 100 year or base flood discharge shall be obtained using the U.S. Army Corps of Engineers’ HEC-HMS computer program. The base flood elevation shall be obtained using the U.S. Army Corps of Engineers’ HEC-RAS computer program.
    3. Notification of Other Agencies. In alteration or relocation of a watercourse, the applicant shall:
      1. Notify adjacent communities and the California Department of Water resources prior to alteration or relocation;
      2. Submit evidence the notification to the FIA, FEMA; and,
      3. Assure that the flood carrying capacity within the altered or relocated portion of the watercourse is maintained.
    4. Documentation of Floodplain Development. The applicant shall obtain and maintain for public inspection and make available as needed the following:
      1. Certification required by Section 18.26.050(A)(3)(a) (lowest floor elevation); and 18.26.050(D);
      2. Certification required by Section18.26.050(A)(3)(b) (elevation or floodproofing of nonresidential structures);
      3. Certification required by Sections 18.26.050(A)(3)(c) (wet floodproofing standard);
      4. Certification of elevation required by Section 18.26.050(C)(2) (subdivision standards);
      5. Certification required by Section 18.26.0500(F)(1) (floodway encroachments);
    5. Map Determinations. Make interpretations where needed as to the exact location of the boundaries of the areas of special flood hazard, for example, where there appears to be a conflict between a mapped boundary and actual field conditions, grade and base flood elevations shall be used to determine the boundaries of the special flood hazard area. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in subsection F of this section.
    6. Remedial Action. Take action to remedy violations of this chapter as specified in Section 18.26.010(C) (General Provisions: Compliance).
  • Duties and Responsibilities of the Planning Director. The Director shall transmit to the Floodplain Administrator all development proposals within the Special Flood Hazard Areas of Merced County for review and conditioning as related to the National Flood Insurance Program and this Chapter.
  • Floodplain Management Fee. Any person desiring a permit to develop a project or construct a structure  (including a manufactured home) located or to be located in any special flood hazard area of Merced County shall pay the applicable floodplain management fee prior to the issuance of the required building permit. 
    1. The alteration or modification of any watercourse shall be reviewed by the Floodplain Administrator and requires a deposit determined by the Floodplain Administrator. This deposit may be adjusted after the project scope is determined by the Floodplain Administrator. The actual fee paid will be the actual cost incurred by the county in processing the watercourse alteration request and any funds remaining in said deposit will be refunded to the applicant.
  •  ​​​Appeals. The Board shall hear and decide appeals when it is alleged there is an error in any requirement, decision, or determination made by the Floodplain Administrator in the enforcement or administration of this Chapter.
  • (Ord. No. 1976, 2019)

    18.26.050 – Provisions for Flood Hazard Reduction

  • Standards of Construction. In all areas of special flood hazards, the following standards are required:
    1. Anchoring.
      1. All new construction and substantial improvements shall be adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy.
      2. All manufactured homes shall meet the anchoring standards specified in Subsection D (Standards for Manufactured Homes), below.
    2. Construction Materials and Methods. All new construction and substantial improvements shall be constructed:
      1. With flood-resistant materials as specified in FEMA Technical Bulletin TB2-93, and utility equipment resistant to flood damage;
      2. Using methods and practices that minimize flood damage;
      3. With electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located to prevent water from entering or accumulating within the components during conditions of flooding; and,
      4. If located within Zones AH or AO, so that there are adequate drainage paths around structures on slopes to guide floodwaters around and away from proposed structures.
    3. Elevation and Floodproofing. (See Section 18.26.020: Definitions of “basement,” “lowest floor,” “new construction,” “substantial damage,” and “substantial improvement”.)
      1. Residential construction. New or substantial improvements, shall have the lowest floor, including the basement:
        1. In an AO zone, elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM, or elevated at least two feet above the highest adjacent grade if no depth number is specified.
        2. In an A zone, elevated to or above the base flood elevation, and the base flood elevation shall be determined by one of the methods described in Section 18.26.040 (C)(2).
        3. In all other zones, elevated to or above the base flood elevation. Upon the completion of the structure, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor and verified by the County Building Inspector to be properly elevated. The certification or verification shall be provided to the Floodplain Administrator.
      2. Nonresidential construction. New or substantial improvements, shall either be elevated to conform with Subparagraph (A)(3)(a), above or in conjunction with attendant utility and sanitary facilities standards:
        1. Be floodproofed below the elevation recommended in Subparagraph (A)(3)(a), above so that the structure is watertight with walls substantially impermeable to the passage of water;
        2. Have structural components capable of resisting hydrostatic and hydrodynamic loads and effects of buoyancy; and,
        3. Be certified by a registered professional engineer or architect that the standards of this Subsection are satisfied. The certification shall be provided to the Floodplain Administrator.
      3. All new construction and substantial improvements with fully enclosed areas below the lowest floor (excluding basements) that are usable solely for parking of vehicles, building access or storage, and which are subject to flooding, shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwater. Designs for meeting this requirement shall follow the guidelines specified in FEMA Technical Bulletins TB 1-93 and TB 7-93, and must exceed the following minimum criteria:
        1. Be certified by a registered professional engineer or architect; or,
        2. Have a minimum of two openings with a total net area of not less than one square inch for every square foot of enclosed area subject to flooding. The bottom of all openings shall be no higher than one foot above grade. Openings may be equipped with screens, louvers, valves, or other coverings or devices if they permit the automatic entry and exist of floodwater.
      4. Manufactured homes shall also meet the standards specified in Subsection (D), below.
  • Standards for Utilities.
    1. All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate:
      1. Infiltration of floodwaters into the systems; and,
      2. Discharge from the systems into floodwaters.
    2. On-site waste disposal systems shall be located to avoid impairment, or contamination during flooding.
  • Standards for Subdivisions.
    1. All preliminary subdivision maps/plans shall identify the special flood hazard area and the elevation of the base flood.
    2. All subdivision maps/plans shall provide the elevation of proposed structure(s) and pad(s). If the site is filled above the base flood elevation, the lowest floor and pad elevations shall be certified by a registered professional engineer or surveyor and provided to the Floodplain Administrator.
    3. All subdivision maps/plans shall be consistent with the need to minimize flood damage.
    4. All subdivision maps/plans shall design public utilities and facilities (i.e., sewer, gas, electrical, and water systems) located and constructed to minimize flood damage.
    5. All subdivision maps/plans shall provide adequate drainage to reduce exposure to flood hazards.
  • Standards for Manufactured Homes.
    1. All manufactured homes that are placed or substantially improved within Zones A, AO, AH, and AE on the County’s Flood Insurance Rate Map, on sites located:
      1. Outside of a manufactured home park or subdivision;
      2. In a new manufactured home park or subdivision:
      3. In an expansion to an existing manufactured home park or subdivision; or,
      4. In an existing manufactured home park or subdivision on a site upon which a manufactured home has incurred “substantial damage” as the result of a flood, shall be elevated on a permanent foundation so that the lowest floor of the manufactured home is elevated to or above the base flood elevation and be securely fastened to an adequately anchored foundation system to resist partial collapse and lateral movement.
    2. All manufactured homes to be placed or substantially improved on sites located in an existing manufactured home park or subdivision within Zones A, AO, AH, AE, on the County’s Flood Insurance Rate Map that are not subject to the provisions of this Subsection shall be securely fastened to an adequately anchored foundation system to resist partial collapse and lateral movement, and elevated so that either:
      1. The lowest floor of the manufactured home is at or above the base flood elevation; or
      2. The manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than 36 inches in height above grade.
    3. Upon the completion of installing the structure, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor and verified by the County Building Inspector to be properly elevated. The certification and verification shall be provided to the Floodplain Administrator.
  • Standards for Recreational Vehicles. All recreational vehicles placed on sites located within Zones A, AO, AH, and AE on the County’s Flood Insurance Rate Map shall either:
    1. Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use. A recreational vehicle is considered ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions; or
    2. Meet the permit requirements specified in this Subsection and the elevation and anchoring requirement for manufactured homes specified in this Subparagraph.
  • Floodways. Located within areas of special flood hazard are areas designated as floodways. Floodways are identified on the latest FIRMs and include those areas within the banks of all rivers, creeks, streams, or sloughs shown on the 15 minute Quadrangle Map which are located within the special flood hazard areas. Since the floodway is an extremely hazardous area due to the velocity of floodwaters which carry debris, potential projectiles, and erosion potential, the following provisions shall apply:
    1. Prohibit encroachments, including fill, new construction, substantial improvement, and other new development unless certification by a registered professional engineer or architect is provided demonstrating that encroachments shall not result in any increase in the base flood elevation during the occurrence of the base flood discharge.
    2. If Subparagraph (F)(1), above is satisfied, all new construction, substantial improvements, and other proposed new development shall comply with all other applicable flood hazard reduction provisions of this section.
  • (Ord. No. 1976, 2019)

    18.26.060 – Variance Procedure

  • Nature of Variances.
    1. The Variance criteria specified in this Chapter are based on the general principle of zoning law that Variances pertain to a real property and are not personal in nature. The County may grant a Variance only upon demonstration of a hardship based on unique circumstances applicable to the property and when these circumstances deprive the property of privileges enjoyed by other properties in the vicinity within the same zone.
    2. It is the duty of the County to help protect its citizens from flooding. This need is so compelling and the implications of the cost of insuring a structure built below flood level are so serious that Variances from the flood elevation or from other requirements in the flood chapter are quite rare. The long-term goal of preventing and reducing flood loss and damage can only be met if Variances are strictly limited. Therefore, the Variance guidelines provided in this Chapter are more detailed and contain multiple provisions that must be met before a Variance can be properly granted. The criteria are designed to screen out those circumstances in which alternatives other than a Variance are more appropriate.
  • Appeal Board.
    1. When evaluating Variance requests, the Board shall consider all technical evaluations, all relevant factors, standards specified in other sections of this Chapter and:
      1. Danger that materials may be swept onto other lands to the injury of others;
      2. Danger of life and property due to flooding or erosion damage;
      3. Susceptibility of the proposed facility and its contents to flood damage and the effect of the damage on the existing individual owner(s) and future owners of the property;
      4. Importance of the services provided by the proposed facility to the community;
      5. Necessity for the facility to be located near water, where applicable;
      6. Availability of alternative locations for the proposed use which are not subject to flooding or erosion damage;
      7. Compatibility of the proposed use with existing and anticipated development;
      8. Relationship of the proposed use to the General Plan and floodplain management program for that area;
      9. Safety of access to the subject property in time of flood for ordinary and emergency vehicles;
      10. Expected heights, velocity, duration, rate of rise, and sediment transport of the floodwaters expected at the site; and,
      11. Costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities (i.e., sewer, gas, electrical, water systems, streets, and bridges).
    2. Any applicant to whom a Variance is granted shall be given written notice:
      1. The issuance of a Variance to construct a structure below the base flood level will result in increased premium rates for flood insurance up to amounts as high as $25.00 for $100.00 of insurance coverage; and,
      2. The construction below the base flood level increases the risk to life and property. A copy of the notice shall be recorded by the Floodplain Administrator in the Office of the County Recorder and shall be recorded in a manner so that it appears in the chain of the title of the affected parcel(s) of land.
    3. The Floodplain Administrator shall maintain a record of all Variance actions, including justification for their issuance, and report the Variances issued in its biennial report submitted to the FIA of the FEMA.
  •  Conditions for Variances.
    1. Generally, Variances may be issued for new construction, substantial improvements, and other proposed new development to be erected on a parcel of one-half acre or less in size contiguous to and surrounded by parcels with existing structures constructed below the base flood level, if the procedures of Section 18.26.040 (Administration) and Section 18.26.050 (Provisions for Flood Hazard Reduction) have been exhausted. As the parcel size increases beyond one-half acre, the technical justification required for issuing the Variance increases.
    2. Variances may be issued for the repair or rehabilitation of historic structures (as defined in ARTICLE 8: Definitions) upon determination that the proposed repair and rehabilitation will not preclude the structure’s continued designation as an historic structure and the Variance is the minimum necessary to preserve the historic character and design of the structure.
    3. Variances shall not be issued within any mapped regulatory floodway if any increase in flood levels during the base flood discharge would result.
    4. Variances shall only be issued upon a determination that the Variance is the “minimum necessary” considering the flood hazard, to afford relief. “Minimum necessary” means to afford relief with a minimum of deviation from the requirements of this Section. For example, in the case of Variances to an elevation requirement, this means the Board need not grant permission for the applicant to build at grade, or even to whatever elevation the applicant proposes, but only to that elevation which the Board believes will both provide relief and preserve the integrity of the local requirements.
    5. Variance shall only be issued upon:
      1. Showing of good and sufficient cause;
      2. Determination that failure to grant the Variance would result in exceptional “hardship” as defined in ARTICLE 8: (Definitions) to the applicant; and,
      3. Determination that the granting of a Variance will not result in increased flood heights, additional threats to public safety, or extraordinary public expense; create a public safety nuisance, cause fraud or victimization of the public, or conflict with existing local laws (See ARTICLE 8: Definitions).
    6. Variances may be issued for new construction, substantial improvements, and other proposed new development necessary for the conduct of a functionally dependent use if the provisions of this Chapter are satisfied and that the structure or other development is protected by methods that minimize flood damages during the base flood and does not result in additional threats to public safety and does not create a public nuisance.
    7. Upon consideration of the factors of this Chapter and the purposes of this Chapter, the Board may attach conditions to the granting of Variances as it deems reasonable and necessary to further the purposes of this Chapter.
  • (Ord. No. 1976, 2019)

    Alluvial Fan.

    Alluvial Fan. A geomorphologic feature characterized by a cone or fan-shaped deposit of boulders, gravel, and fine sediments that have been eroded from mountain slopes, transported by flood flows, and then deposited on the valley floors, and which is subject to flash flooding, high velocity flows, debris flows, erosion, sediment movement and deposition, and channel migration.

    Apex.

    Apex. The point of highest elevation on an alluvial fan, which on undisturbed fans is generally the point where the major stream that formed the fan emerges from the mountain front.

    Appeal.

    Appeal. A request for a review of the floodplain administrator’s interpretation of any provision of this chapter.

    Area of Shallow Flooding.

    Area of Shallow Flooding. A designated AO or AH zone on the Flood Insurance Rate Map (FIRM). The base flood depths range from one to three feet; a clearly defined channel does not exist; the path of flooding is unpredictable and indeterminate; and velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.

    Area of Special Flood Hazard.

    Area of Special Flood Hazard. See “Special flood hazard area.”

    Base Flood.

    Base Flood. A flood which has a one percent chance of being equaled or exceeded in any given year (also called the “one hundred (100) year flood”). Base flood is the term used throughout this chapter.

    Basement.

    Basement. Any area of the building having its floor subgrade; i.e., below ground level, on all sides.

    Building.

    Building. See “Structure.”

    Development.

    Development. Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials.

    Encroachment.

    Encroachment. The advance or infringement of uses, plant growth, fill, excavation, buildings, permanent structures or development into a floodplain which may impede or alter the flow capacity of a floodplain.

    Existing Manufactured Home Park or Subdivision.

    Existing Manufactured Home Park or Subdivision. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community.

    Expansion to an Existing Manufactured Home Park or Subdivision.

    Expansion to an Existing Manufactured Home Park or Subdivision. The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).

    Flood, Flooding, or Floodwater.

    Flood, Flooding, or Floodwater.

    1. A general and temporary condition of partial or complete inundation of normally dry land areas from the overflow of inland or tidal waters; the unusual and rapid accumulation or runoff of surface waters from any source; and
    2. The condition resulting from flood related erosion (See Flood-related erosion).

    Flood Boundary and Floodway Map (FBFM).

    Flood Boundary and Floodway Map (FBFM). The official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of special flood hazards and the floodway.

    Flood Hazard Boundary Map (FHBM).

    Flood Hazard Boundary Map (FHBM). The official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated the areas of flood hazards.

    Flood Insurance Rate Map (FIRM).

    Flood Insurance Rate Map (FIRM). The official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community.

    Flood Insurance Study.

    Flood Insurance Study. The official report provided by the Federal Insurance Administration that includes flood profiles, the Flood Insurance Rate Map, the Flood Boundary and Floodway Map, and the water surface elevation of the base flood.

    Floodplain or Flood-Prone Area.

    Floodplain or Flood-Prone Area. Any land area susceptible to being inundated by water from any source (See Flooding).

    Floodplain Administrator.

    Floodplain Administrator. The individual appointed to administer and enforce the floodplain management regulations.

    Floodplain Management.

    Floodplain Management. The operation of an overall program of corrective and preventive measures for reducing flood damage and preserving and enhancing, where possible, natural resources in the floodplain, including but not limited to emergency preparedness plan, flood control works, floodplain management regulations, and open space plans.

    Floodplain Management Regulations.

    Floodplain Management Regulations. This Code, subdivision regulations, building codes, health regulations, special purpose chapters (such as grading and erosion control) and other application of police power which control development in flood-prone areas. This term describes federal, state or local regulations in any combination thereof which provide standards for preventing and reducing flood loss and damage.

    Floodproofing.

    Floodproofing. Any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures/ and their contents. (Refer to FEMA Technical Bulletins TB 1-93, TB 3-93, and TB 7-93 for guidelines on dry and wet floodproofing.)

    Flood-related Erosion.

    Flood-related Erosion. The collapse or subsidence of land along the shore of a lake or other body of water as undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as a flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding.

    Flood-related Erosion Area.

    Flood-related Erosion Area. A land area adjoining the shore of a lake or other body of water, which due to the composition of the shoreline or bank and high wind-driven currents, is likely to suffer flood-related erosion damage.

    Flood-related Erosion Area Management.

    Flood-related Erosion Area Management. The operation of an overall program of corrective and preventative measure for reducing flood-related erosion damage including but not limited to emergency preparedness plans, flood-related erosion control works, and floodplain management regulations.

    Floodway.

    Floodway. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. Also referred to as “regulatory floodway.”

    Floodway Fringe.

    Floodway Fringe. The area of the floodplain on either side of the “regulatory floodway” where encroachment may be permitted.

    Fraud and Victimization.

    Fraud and Victimization. A term related to Section 18.26.050 (Variance Procedures), of this chapter, and means that the variance granted must not cause fraud on or victimization of the public. In examining this requirement, the board of supervisors will consider the fact that every newly constructed building adds to government responsibilities and remains a part of the community for fifty to one hundred years. Buildings that are permitted to be constructed below the base flood elevation are subject during all those years to increased risk of damage from floods, while future owners of the property and the community as a whole are subject to all the costs, inconvenience, danger, and suffering that those increased flood damages bring. In addition, future owners may purchase the property, unaware that it is subject to potential flood damage, and can be insured only at very high flood insurance rates.

    Functionally Dependent Use.

    Functionally Dependent Use. A use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, and does not include long-term storage or related manufacturing facilities.

    Governing Body.

    Governing Body. The County Board of Supervisors.

    Hardship.

    Hardship. Related to Section 18.26.050 (Variances) of this chapter and means the exceptional hardship that would result from a failure to grant the requested variance. The board of supervisors requires that the variance be exceptional, unusual, and peculiar to the property involved. Mere economic or financial hardship alone is not exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or the disapproval of one’s neighbors likewise cannot, as a rule, qualify as an exceptional hardship. All of these problems can be resolved through other means without granting a variance, even if the alternative is more expensive, or requires the property owner to build elsewhere or put the parcel to a different use than originally intended.

    Highest Adjacent Grade

    Highest Adjacent Grade. The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.

    Historic Structure.

    Historic Structure. Any structure that is:

    1. Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of the Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
    2. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
    3. Individually listed on a state inventory of historic places, in states with historic preservation programs which have been approved by the Secretary of the Interior; or,
    4. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either by an approved state program as determined by the Secretary of the Interior in states with approved programs.

    Levee.

    Levee. A man-made structure, usually an earthen embankment, designed and constructed in accordance with sound engineering practices to contain, control or divert the flow of water so as to provide protection from temporary flooding.

    Levee System.

    Levee System. A flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accord with sound engineering practices.

    Lowest Floor.

    Lowest Floor. The lowest floor of the lowest enclosed area, including basement (see “Basement” definition).

    1. An unfinished or flood-resistant enclosure below the lowest floor that is usable solely for parking of vehicles, building access or storage in an area other than a basement area, is not considered a building’s lowest floor provided it conforms to applicable non-elevation design requirements, including, but not limited to the following standards:
      1. The wet floodproofing standards in Section 18.26.040(A)(3)(b);
      2. The anchoring standards in Section 18.26.040(A)(1);
      3. The construction materials and methods standards in Section 18.26.040(A)(2);
      4. The utilities standards in Section 18.26.040(B).
    2. For residential structures, all subgrade enclosed areas are prohibited as they are considered to be basements (see Basement definition). This prohibition includes below-grade garages and storage areas.

    Manufactured Home.

    Manufactured Home. A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term “manufactured home” does not include a “recreational vehicle.”

    Manufactured Home Park or Subdivision.

    Manufactured Home Park or Subdivision. A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.

    Market Value.

    Market Value. Shall be determined by estimating the cost to replace the structure in new condition and adjusting that cost figure by the amount of depreciation which has accrued since the structure was constructed. The cost of replacement of the structure shall be based on a square foot cost factor determined by reference to a building cost estimating guide recognized by the building construction industry. The amount of depreciation shall be determined by taking into account the age and physical deterioration of the structure and functional obsolescence as approved by the floodplain administrator, but shall not include economic or other forms of external obsolescence. Use of replacement costs or accrued depreciation factors different from those contained in recognized building cost estimating guides may be considered only if such factors are included in a report prepared by an independent professional appraiser and supported by written explanation of the differences.

    Mean Sea Level.

    Mean Sea Level. For purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community’s Flood Insurance Rate Map are referenced.

    New Construction.

    New Construction. For floodplain management purposes, structures for which the “start of construction” commenced on or after January 3, 1979 the effective date of floodplain management regulations adopted by this community, and includes any subsequent improvements to such structures.

    New Manufactured Home Park or Subdivision.

    New Manufactured Home Park or Subdivision. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by this community.

    Obstruction.

    Obstruction. Includes, but is not limited to, any dam, wall, wharf, embankment, levee, dike, pile, abutment, protection, excavation, channelization, bridge, conduit, culvert, building, wire, fence, rock, gravel, refuse, fill, structure, vegetation or other material in, along, across or projecting into any watercourse which may alter, impede, retard or change the direction and/or velocity of the flow of water, snare or collect debris carried by the flow of water, or is likely to be carried downstream.

    One-Hundred-Year Flood.

    One-Hundred-Year Flood. See “Base flood.”

    Public Safety and Nuisance.

    Public Safety and Nuisance. As related to Section 18.34.060, Variances, of this chapter, that the granting of a variance must not result in anything which is injurious to safety or health of an entire community, neighborhood, or any considerable number of persons, or unlawfully obstructs the free passage of use, in the customary manner, of any navigable lake, river, bay, stream, canal, or basin.

    Recreational Vehicle.

    Recreational Vehicle. A vehicle which is:

    1. Built on a single chassis;
    2. Four hundred (400) square feet or less when measured at the largest horizontal projection;
    3. Designed to be self-propelled or permanently towable by a light-duty truck; and,
    4. Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.

    Regulatory Floodway.

    Regulatory Floodway. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot.

    Remedy a Violation.

    Remedy a Violation. To bring the structure or other development into compliance with state or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its noncompliance. Ways that impacts may be reduced include protecting the structure or other affected development from flood damages, implementing the enforcement provisions of the code or otherwise deterring future similar violations, or reducing State or Federal financial exposure with regard to the structure or other development

    Riverine.

    Riverine. Relating to, formed by, or resembling a river (including tributaries), stream, brook, etc.

    Sheet Flow Area.

    Sheet Flow Area. See “Area of Shallow Flooding.”

    Special Flood Hazard Area (SFHA).

    Special Flood Hazard Area (SFHA). An area having special flood, mudslide (i.e., mudflow), or flood related hazards, and shown on an FHBM or FIRM as Zone A, AO, A1-A30, AE, or AH.

    Start of Construction.

    Start of Construction. Includes substantial improvement and other proposed new development and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement was within one hundred eighty (180) days from the date of the permit. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation of the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

    Structure.

    Structure. A walled and roofed building that is principally above ground; this includes a gas or liquid storage tank or a manufactured home.

    Substantial Damage.

    Substantial Damage. Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred.

    Substantial Improvement.

    Substantial Improvement. Any reconstruction, rehabilitation, addition, or other proposed new development of a structure, the cost of which equals or exceeds fifty (50) percent of the market value of the structure before the start of construction of the improvement. This term includes structures which have incurred substantial damage, regardless of the actual repair work performed. The term does not, however, include:

    1. Any project for improvement of a structure to correct existing violations or state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions;
    2. Any alteration of a historic structure, provided that the alteration will not preclude the structure’s continued designation as a historic structure; or,
    3. Routine maintenance activities which do not change the shape or character of the existing structure. Examples of routine maintenance include, but are not limited to replacement of electrical service panels, re-roofing, siding replacement, heating and air conditioning replacement and window replacement.

    Variance.

    Variance. A grant of relief from the requirements of this chapter which permits construction in a manner that would otherwise be prohibited by this chapter.

    Violation.

    Violation. The failure of a structure or other development to be fully compliant with this chapter. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this chapter is presumed to be in violation until such time as that documentation is provided.

    Water Surface Elevation.

    Water Surface Elevation. The height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929 (or other datum where specified) of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

    Watercourse.

    Watercourse. A lake, river, creek, stream, or slough identified on the current fifteen (15) minute Quadrangle Maps published by the U.S. Geological Survey and on file in the Merced County surveyor’s office.

    (Ord. No. 1976, 2019)