A reclamation plan, which describes the operations to be performed by the permit applicant to reclaim the land to be mined over the life of the mine. The reclamation plan shall include maps, plans, the schedule for reclamation, written material and other documents as required by the Planning Board. Prior to submitting the reclamation plan, the applicant shall submit the plan for a review by the local office of the Natural Resource Conservation Service for their report which shall be submitted with the plan. Where topsoil is removed, sufficient arable soil shall be set aside and shall be respread after the operation with a layer of earth two feet deep or the original thickness, whichever is less, and capable of supporting vegetation. Fill shall be of a suitable material approved by the Planning Board.