Subdivision and Site Plan Review
Section 13-4.2G(1), Checklist A - See Appendix |
Section 13-4.2G(2), Checklist B - See Appendix |
Section 13-4.2G(3), Checklist C - See Appendix |
Section 13-4.2G(4), Checklist D(1) - See Appendix [Amended 10-4-2007 by Ord. No. 21-2007] |
Section 13-4.2G(4.1), Checklist D(2) - See Appendix [Amended 10-4-2007 by Ord. No. 21-2007] |
Section 13-4.2G(5), Checklist E - See Appendix |
Section 13-4.2G(6), Checklist F - See Appendix |
Borough Engineer |
Borough Planning Consultant |
Police Chief |
Shade Tree Commission |
Fire Subcode Official |
Zoning Officer |
County Planning Board if required pursuant to the County Land Development Standards |
Such other municipal, county, state and federal officials and agencies as directed by the Board |
Type of Application | Period of Time for Action by Planning Board |
|---|---|
Minor subdivision or resubdivision | 45 days |
Minor site plan | 45 days |
Preliminary plat - 10 lots or less | 45 days |
Preliminary plat - more than 10 lots | 95 days |
Preliminary site plan - 10 acres of land or less and 10 dwelling units or less | 45 days |
Preliminary site plan - more than 10 acres of land or more than 10 dwelling units | 95 days |
Final plat | 45 days |
Final site plan | 45 days |
Conditional use | 95 days |
Subdivision, site plan or conditional use with variance relief | 120 days |
Failure of the Planning Board to act within the period prescribed shall constitute approval and a certificate of the Secretary of the Planning Board to act shall be issued on request of the applicant, and it shall be sufficient in lieu of the written endorsement or other evidence or approval, herein required, and shall be so accepted by the Morris County Recording Officer for purposes of filing subdivision plats. The applicant shall be notified of the Planning Board's action within one week of its action. |
Borough Clerk |
Borough Engineer |
Zoning Officer |
Tax Assessor |
Planning Board |
County Planning Board |
Borough Clerk |
Borough Engineer |
Zoning Officer |
Tax Assessor |
County Planning Board |
Borough Planning Board |
NOTICE |
CONSTRUCTION OF ALL REQUIRED IMPROVEMENTS IS TO BE COMPLETED WITHIN THE TIME FRAME PROVIDED FOR IN THE DEVELOPER'S AGREEMENT UNLESS AN EXTENSION OF TIME HAS BEEN OBTAINED FROM THE APPROPRIATE MUNICIPAL AGENCY. THE MUNICIPALITY HAS NO OBLIGATION TO CONSTRUCT ANY IMPROVEMENTS NOT COMMENCED, NOR TO COMPLETE ANY IMPROVEMENTS COMMENCED BY DEVELOPER EXCEPT TO THE EXTENT OF FUNDS RECEIVED FROM THE PERFORMANCE GUARANTEES POSTED BY DEVELOPER WITH THE MUNICIPALITY. |
The Planning Board shall not approve a site plan when the driveway grade exceeds 15%. Recognizing that plans for individual homes may change between the time of preliminary approval and the application for a building permit, the Planning Board shall consider an amended site plan for an individual lot prior to the issuance of a building permit that will equally achieve the objectives of the originally approved site plan. |
Each lot shall be provided with a paved driveway at least 10 feet in width, with an opening at the curbline of at least 15 feet in width and a curb radius or taper between the curb opening and the drive. All driveways shall meet the abutting road at a horizontal angle of not less than 60° within 20 feet of the curbline on straight roads and radially to the curb on curved roads. Provisions shall be made for a standing area extending a distance of not less than 20 feet from the curbline at a grade not to exceed 2%, and a standing area at the garage a minimum of 20 feet in length at a grade not to exceed 5%. |
That portion of the driveway connecting the standing areas at the curbline and garage shall be constructed with a grade not to exceed 15%. All changes in center line grades shall be connected with symmetrical vertical curves not less than 12 feet in length. In no event shall the driveway opening at the curbline be located closer than 25 feet from the end of the curb return formed at the street intersection. |
Future peak-hour traffic generated by the development Future peak-hour | x | Total cost of the roadway improvements and/or extension | = | Developer's cost |
Development cubic feet per second ("cfs") Total tributary cfs | x | Total enlargement of improvement cost of drainage facilities | = | Developer's cost |
Development gallons per day ("gpd") Total tributary gpd | x | Total enlargement or improvement cost | = | Developer's cost |
Development tributary gpd Total tributary gpd | x | Total project cost | = | Developer's cost |
Use of Water (gpd) by the developer Total use of water (gpd) of area served by the improvement | x | improvement cost | = | Developer's cost |
Subdivision and Site Plan Review
Section 13-4.2G(1), Checklist A - See Appendix |
Section 13-4.2G(2), Checklist B - See Appendix |
Section 13-4.2G(3), Checklist C - See Appendix |
Section 13-4.2G(4), Checklist D(1) - See Appendix [Amended 10-4-2007 by Ord. No. 21-2007] |
Section 13-4.2G(4.1), Checklist D(2) - See Appendix [Amended 10-4-2007 by Ord. No. 21-2007] |
Section 13-4.2G(5), Checklist E - See Appendix |
Section 13-4.2G(6), Checklist F - See Appendix |
Borough Engineer |
Borough Planning Consultant |
Police Chief |
Shade Tree Commission |
Fire Subcode Official |
Zoning Officer |
County Planning Board if required pursuant to the County Land Development Standards |
Such other municipal, county, state and federal officials and agencies as directed by the Board |
Type of Application | Period of Time for Action by Planning Board |
|---|---|
Minor subdivision or resubdivision | 45 days |
Minor site plan | 45 days |
Preliminary plat - 10 lots or less | 45 days |
Preliminary plat - more than 10 lots | 95 days |
Preliminary site plan - 10 acres of land or less and 10 dwelling units or less | 45 days |
Preliminary site plan - more than 10 acres of land or more than 10 dwelling units | 95 days |
Final plat | 45 days |
Final site plan | 45 days |
Conditional use | 95 days |
Subdivision, site plan or conditional use with variance relief | 120 days |
Failure of the Planning Board to act within the period prescribed shall constitute approval and a certificate of the Secretary of the Planning Board to act shall be issued on request of the applicant, and it shall be sufficient in lieu of the written endorsement or other evidence or approval, herein required, and shall be so accepted by the Morris County Recording Officer for purposes of filing subdivision plats. The applicant shall be notified of the Planning Board's action within one week of its action. |
Borough Clerk |
Borough Engineer |
Zoning Officer |
Tax Assessor |
Planning Board |
County Planning Board |
Borough Clerk |
Borough Engineer |
Zoning Officer |
Tax Assessor |
County Planning Board |
Borough Planning Board |
NOTICE |
CONSTRUCTION OF ALL REQUIRED IMPROVEMENTS IS TO BE COMPLETED WITHIN THE TIME FRAME PROVIDED FOR IN THE DEVELOPER'S AGREEMENT UNLESS AN EXTENSION OF TIME HAS BEEN OBTAINED FROM THE APPROPRIATE MUNICIPAL AGENCY. THE MUNICIPALITY HAS NO OBLIGATION TO CONSTRUCT ANY IMPROVEMENTS NOT COMMENCED, NOR TO COMPLETE ANY IMPROVEMENTS COMMENCED BY DEVELOPER EXCEPT TO THE EXTENT OF FUNDS RECEIVED FROM THE PERFORMANCE GUARANTEES POSTED BY DEVELOPER WITH THE MUNICIPALITY. |
The Planning Board shall not approve a site plan when the driveway grade exceeds 15%. Recognizing that plans for individual homes may change between the time of preliminary approval and the application for a building permit, the Planning Board shall consider an amended site plan for an individual lot prior to the issuance of a building permit that will equally achieve the objectives of the originally approved site plan. |
Each lot shall be provided with a paved driveway at least 10 feet in width, with an opening at the curbline of at least 15 feet in width and a curb radius or taper between the curb opening and the drive. All driveways shall meet the abutting road at a horizontal angle of not less than 60° within 20 feet of the curbline on straight roads and radially to the curb on curved roads. Provisions shall be made for a standing area extending a distance of not less than 20 feet from the curbline at a grade not to exceed 2%, and a standing area at the garage a minimum of 20 feet in length at a grade not to exceed 5%. |
That portion of the driveway connecting the standing areas at the curbline and garage shall be constructed with a grade not to exceed 15%. All changes in center line grades shall be connected with symmetrical vertical curves not less than 12 feet in length. In no event shall the driveway opening at the curbline be located closer than 25 feet from the end of the curb return formed at the street intersection. |
Future peak-hour traffic generated by the development Future peak-hour | x | Total cost of the roadway improvements and/or extension | = | Developer's cost |
Development cubic feet per second ("cfs") Total tributary cfs | x | Total enlargement of improvement cost of drainage facilities | = | Developer's cost |
Development gallons per day ("gpd") Total tributary gpd | x | Total enlargement or improvement cost | = | Developer's cost |
Development tributary gpd Total tributary gpd | x | Total project cost | = | Developer's cost |
Use of Water (gpd) by the developer Total use of water (gpd) of area served by the improvement | x | improvement cost | = | Developer's cost |