Dimensional Regulations
Illustration of Lot Shape Factor Calculation | ||
The diagram below illustrates the calculation of the lot shape factor. For the purpose of illustration, assume this lot is located within the Residential-60 Zoning District, which requires 60,000 square feet of dry, contiguous land for a building lot. | ||
In this example, assume the total lot area is 87,000 square feet (250 x 350 feet). Also, assume that a wetland area of 14,375 +/- square feet runs across the lot and separates a smaller dry area of 7,500 +/- square feet from the majority of dry land. Thus, 65,625 square feet of dry, contiguous land remains and, therefore, the lot meets the requirement that it have a minimum of 60,000 square feet of dry, contiguous land. However, the lot also must meet the requirement of the lot shape factor (LSF). The LSF requires that the lot contain a closed plot of land having at least 1/2 the area required by the R-60 Zoning District (in this case 30,000 square feet), and such closed plot of land must also have a lot shape factor of 22 or less. The 30,000 square foot area is used to comply with the LSF requirement. In the illustration, the perimeter of the LSF area is 700 feet. Thus, to calculate the LSF, square the perimeter and divide by the area: | ||
1. | 700 x 700 = 490,000. | |
2. | 490,000 divided by 30,000 = 16.3. | |
3. | The lot shape factor is 16.3. | |
As long as the lot shape factor is 22 or less, the lot is suitable for building. | ||
![]() | ||
Table 6.2 Dimensional Requirements |
|---|
Residential Eighty (R-80) |
Residential Sixty (R-60) |
Residential Forty (R-40) |
Village Commercial (VC) |
Village Center Core (VCC) |
Commercial (C) |
Industrial (I) |
Use | Zoning District Dimension Requirements in Feet/Square Feet* | |||||||
|---|---|---|---|---|---|---|---|---|
R-80 | R-60 | R-40 | VC | VCC | C | I | ||
Single-family dwelling (including accessory apartment if allowed) | 80,000 | 60,000 | 40,000 | 18,000 | NA | 18,000 | 45,000 | |
2 units per building | 80,000 | 80,000 | 80,000 | 26,000 | 5,000 | |||
3 or more units per building | 110,000 | 34,000 | 5,000 | |||||
Minimum continuous frontage in feet (see § 175-6.10) | 150 | 150 | 150 | 120 | 75 | 120 | 150 | |
Minimum front yard for principal building (in feet) | 50 | 40 | 40 | 10 | 101 | 50 | 40 | |
Maximum front yard | 40 | |||||||
Minimum side yard for principal building (in feet) | 35 | 25 | 25 | 10 | 101 | 15 | 30 | |
Minimum side yard for accessory building (in feet) | 10 | 10 | 10 | 10 | 101 | 10 | 10 | |
Minimum rear yard for principal building (in feet) | 25 | 15 | 15 | 20 | 20 | 20 | 40 | |
Minimum rear yard for accessory building (in feet) | 10 | 10 | 10 | 20 | 20 | 10 | 10 | |
Maximum percentage of lot covered by building | 12% | 16% | 20% | 50% | 75%2 | 33% | 33% | |
Maximum height of building (in feet) | 35 | 35 | 35 | 45 | 60 | 45 | 50 | |
Maximum height (in stories) | 3 | 3 | 3 | 3 | 4 | 3 | 3 | |
Maximum height of chimneys, domes, spires, towers, radio or television antennas in any zone (in feet) | 65 | 65 | 65 | 65 | 70 | 65 | 65 | |
Maximum height in feet for wireless communication facilities is 125 feet. * Wetlands and water bodies are not computed in lot area (see § 175-6.4). For setbacks applicable to large-scale, ground-mounted solar photovoltaic power generation installations, see Article XXII, § 175-22.3. 1Distance could be decreased pursuant to a special permit granted by the Planning Board. 2Percentage could be increased pursuant to a special permit granted by the Planning Board. | ||||||||
Dimensional Regulations
Illustration of Lot Shape Factor Calculation | ||
The diagram below illustrates the calculation of the lot shape factor. For the purpose of illustration, assume this lot is located within the Residential-60 Zoning District, which requires 60,000 square feet of dry, contiguous land for a building lot. | ||
In this example, assume the total lot area is 87,000 square feet (250 x 350 feet). Also, assume that a wetland area of 14,375 +/- square feet runs across the lot and separates a smaller dry area of 7,500 +/- square feet from the majority of dry land. Thus, 65,625 square feet of dry, contiguous land remains and, therefore, the lot meets the requirement that it have a minimum of 60,000 square feet of dry, contiguous land. However, the lot also must meet the requirement of the lot shape factor (LSF). The LSF requires that the lot contain a closed plot of land having at least 1/2 the area required by the R-60 Zoning District (in this case 30,000 square feet), and such closed plot of land must also have a lot shape factor of 22 or less. The 30,000 square foot area is used to comply with the LSF requirement. In the illustration, the perimeter of the LSF area is 700 feet. Thus, to calculate the LSF, square the perimeter and divide by the area: | ||
1. | 700 x 700 = 490,000. | |
2. | 490,000 divided by 30,000 = 16.3. | |
3. | The lot shape factor is 16.3. | |
As long as the lot shape factor is 22 or less, the lot is suitable for building. | ||
![]() | ||
Table 6.2 Dimensional Requirements |
|---|
Residential Eighty (R-80) |
Residential Sixty (R-60) |
Residential Forty (R-40) |
Village Commercial (VC) |
Village Center Core (VCC) |
Commercial (C) |
Industrial (I) |
Use | Zoning District Dimension Requirements in Feet/Square Feet* | |||||||
|---|---|---|---|---|---|---|---|---|
R-80 | R-60 | R-40 | VC | VCC | C | I | ||
Single-family dwelling (including accessory apartment if allowed) | 80,000 | 60,000 | 40,000 | 18,000 | NA | 18,000 | 45,000 | |
2 units per building | 80,000 | 80,000 | 80,000 | 26,000 | 5,000 | |||
3 or more units per building | 110,000 | 34,000 | 5,000 | |||||
Minimum continuous frontage in feet (see § 175-6.10) | 150 | 150 | 150 | 120 | 75 | 120 | 150 | |
Minimum front yard for principal building (in feet) | 50 | 40 | 40 | 10 | 101 | 50 | 40 | |
Maximum front yard | 40 | |||||||
Minimum side yard for principal building (in feet) | 35 | 25 | 25 | 10 | 101 | 15 | 30 | |
Minimum side yard for accessory building (in feet) | 10 | 10 | 10 | 10 | 101 | 10 | 10 | |
Minimum rear yard for principal building (in feet) | 25 | 15 | 15 | 20 | 20 | 20 | 40 | |
Minimum rear yard for accessory building (in feet) | 10 | 10 | 10 | 20 | 20 | 10 | 10 | |
Maximum percentage of lot covered by building | 12% | 16% | 20% | 50% | 75%2 | 33% | 33% | |
Maximum height of building (in feet) | 35 | 35 | 35 | 45 | 60 | 45 | 50 | |
Maximum height (in stories) | 3 | 3 | 3 | 3 | 4 | 3 | 3 | |
Maximum height of chimneys, domes, spires, towers, radio or television antennas in any zone (in feet) | 65 | 65 | 65 | 65 | 70 | 65 | 65 | |
Maximum height in feet for wireless communication facilities is 125 feet. * Wetlands and water bodies are not computed in lot area (see § 175-6.4). For setbacks applicable to large-scale, ground-mounted solar photovoltaic power generation installations, see Article XXII, § 175-22.3. 1Distance could be decreased pursuant to a special permit granted by the Planning Board. 2Percentage could be increased pursuant to a special permit granted by the Planning Board. | ||||||||