Environmental Preservation
BASE FLOOD — A flood which has a 1% chance of being equaled or exceeded in any given year (also called the "100-year flood" or "1% annual chance flood"). | |
BASE FLOOD DISCHARGE — The volume of water resulting from a base flood as it passes a given location within a given time, usually expressed in cubic feet per second (cfs). | |
BASE FLOOD ELEVATION (BFE) — The elevation shown on the Flood Insurance Rate Map (FIRM) for AE Zones that indicates the water surface elevation resulting from a flood that has a 1% or greater chance of being equaled or exceeded in any given year. Within the approximated floodplain, the base flood elevation shall be established as a point on the boundary of the approximated floodplain which is nearest to the construction site in question. | |
BASEMENT — Any area of a building having its floor below ground level on all sides. | |
COMPENSATORY STORAGE — Excavation within or directly contiguous to a flood hazard area, above the seasonal high groundwater table elevation and below the design flood elevation, of a hydraulically equivalent volume provided to balance the effects of proposed fill on the flood hazard area (no net loss of floodplain storage volume). Areas excavated for compensatory storage shall become part of the flood hazard area and not be separated from the flood hazard area by an open channel or closed conduit or culvert. | |
DEVELOPMENT — Any man-made change to improved or unimproved real estate, including, but not limited to, the construction, reconstruction, renovation, repair, expansion, or alteration of buildings or other structures; the placement of manufactured homes; streets, and other paving; utilities; filling, grading and excavation; mining; dredging; drilling operations; storage of equipment or materials; and the subdivision of land. The term shall also include, but shall not be limited to, the placement or development of a mobile (manufactured) home on a lot or the placement or development of any recreational vehicle or travel trailer on a lot for more than 180 consecutive days. | |
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION — A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community. | |
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION — The preparation of additional sites by the construction of facilities for servicing the lots on which manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads). | |
FLOOD — A temporary inundation of normally dry land areas. | |
FLOOD INSURANCE RATE MAP (FIRM) — The official map on which the Federal Emergency Management Agency has delineated both the areas of special flood hazard and the risk premium zones applicable to the community. | |
FLOOD INSURANCE STUDY (FIS) — The official report provided by the Federal Emergency Management Agency that includes flood profiles, the Flood Insurance Rate Map, the Flood Boundary and Floodway Map, and the water surface elevation of the base flood. | |
FLOODPLAIN AREA — A relatively flat or low land area which is subject to partial or complete inundation from an adjoining or nearby stream, river or watercourse; and/or any area subject to the unusual and rapid accumulation of surface waters from any source. | |
FLOODPROOFED — Watertight, with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy. | |
FLOODWAY — The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. | |
LOWEST FLOOR — The lowest floor of the lowest fully enclosed area (including basement). An unfinished, flood-resistant, partially enclosed area, used solely for parking of vehicles, building access, and incidental storage, in an area other than a basement area, is not considered the lowest floor of a building, provided that such space is not designed and built so that the structure is in violation of the applicable nonelevation design requirements of this ordinance. | |
MANUFACTURED HOME — A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes, the term "manufactured home" also includes travel trailers and other similar vehicles placed on a site for greater than 180 consecutive days. For insurance purposes, the term "manufactured home" does not include park trailers, travel trailers and other similar vehicles. The term "manufactured home" shall have the same meaning as "mobile home." | |
MANUFACTURED HOME PARK OR SUBDIVISION — For floodplain management purposes, a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale. | |
MINOR REPAIR — The replacement of existing work with equivalent materials for the purpose of its routine maintenance and upkeep, but not including the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a structure affecting the exitway requirements; nor shall minor repairs include addition to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, oil, waste, vent, or similar piping, electric wiring, mechanical or other work affecting public health or general safety. | |
NEW CONSTRUCTION — Structures for which the start of construction commenced on or after the effective start date of this floodplain management ordinance and which includes any subsequent improvements to such structures. Any construction started after June 28, 1976, and before the effective start date of this floodplain management ordinance is subject to the ordinance in effect at the time the permit was issued, provided the start of construction was within 180 days of permit issuance. Work on existing structures is covered under the definition of "substantial improvement." | |
NEW MANUFACTURED HOME PARK OR SUBDIVISION — A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by a community. | |
PERMANENT — Having a life span of six months or more at a particular location. | |
PERSON — An individual, partnership, public or private association or corporation, firm, trust, estate, municipality, governmental unit, public utility or any other legal entity whatsoever, which is recognized by law as the subject of rights and duties. | |
RECREATIONAL VEHICLE — A vehicle which is: | |
A. | Built on a single chassis; |
B. | Not more than 400 square feet, measured at the largest horizontal projections; |
C. | Designed to be self-propelled or permanently towable by a light-duty truck; and |
D. | Not designed for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. |
REGULATORY FLOOD ELEVATION — The base flood elevation (BFE) or estimated flood height as determined using simplified methods plus a freeboard safety factor of 1 1/2 feet. The freeboard safety factor also applies to utilities and ductwork. | |
SPECIAL FLOOD HAZARD AREA (SFHA) — An area in the floodplain subject to a 1% or greater chance of flooding in any given year. It is shown on the FIRM as Zone A or AE. | |
START OF CONSTRUCTION — Includes substantial improvement and other proposed new development and means the date the permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement was within 180 days after the date of the permit and shall be completed within 12 months after the date of issuance of the permit, unless a time extension is granted, in writing, by the Floodplain Administrator. The "actual start" means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the "actual start of construction" means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. | |
STRUCTURE — For floodplain management purposes, a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. | |
SUBSTANTIAL DAMAGE — Damage from any cause sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed 50% or more of the market value of the structure before the damage occurred. | |
SUBSTANTIAL IMPROVEMENT — Any repair, reconstruction or improvement of a structure, the cost of which equals or exceeds 50% of the market value of the structure. This term includes structures which have incurred "substantial damage" regardless of the actual repair work performed. This term does not include the following: | |
A. | Any project for improvement of a structure to comply with existing state or local health, sanitary or safety code specifications which are solely necessary to assure safe living conditions; or |
B. | Any exterior restoration or interior alteration of an historic structure listed on the National Register of Historic Places or a state inventory of historic places or which the Pennsylvania Historical and Museum Commission has officially determined is eligible for such listing. |
VIOLATION — The failure of a structure or other development to be fully compliant with the floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in 44 CFR 60.3(b)(5), (c)(4), (c)(10), (d)(3), (e)(2), (e)(4), or (e)(5) is presumed to be in violation until such time as that documentation is provided. | |
In lieu of the above, the Township may require the applicant to determine the elevation with hydrologic and hydraulic engineering techniques. Hydrologic and hydraulic analyses shall be undertaken only by professional engineers or others of demonstrated qualifications, who shall certify that the technical methods used correctly reflect currently accepted technical concepts. Studies, analyses, computations, etc., shall be submitted in sufficient detail to allow a thorough technical review by the Township. [See provisions for site-specific floodplain studies in Subsection H(4) below.] |
Sound Level Limits by Receiving Lands Use and Time | ||
|---|---|---|
Land Use or Zoning District Receiving Noise | Hours and Days | Maximum Permitted Sound Level (dBA) |
Principally residential lot or nursing homes | 7:00 a.m. to 10:00 p.m. other than Sundays and major legal holidays | 62 |
10:00 p.m. to 7:00 a.m. and Sundays and major legal holidays | 57 | |
Industrially developed or zoned lots | All times and days | 74 |
Any lot not listed above | 7:00 a.m. to 10:00 p.m. other than Sundays and major legal holidays | 67 |
10:00 p.m. to 7:00 a.m. and Sundays and major legal holidays | 62 | |