Temporary housing for construction purposes as defined in PMC § 17.04.020. Owner-occupied, temporary housing for property owners only during construction of a single-unit dwelling. The permit shall be limited to 180 days (six months). If an extension is needed, it must be a new application to the board of adjustment and limited to another 180 days, maximum. Only one extension may be applied for. If the approved limit has been exceeded by the owner, city utilities will be disconnected by Palouse public works staff. Additionally, at that time residing in the temporary housing will no longer be permitted. Fines may be assessed according to PMC § 1.12.010.
Before application can be made for a conditional use for temporary housing, the following criteria must be met:
a.
Building permit for the residence must be approved by the city building inspector;
b.
Only the property owner may apply for a conditional use permit to reside in temporary housing during construction of his or her single-unit dwelling;
c.
Water and sewer utilities must be extended to the property and an account set up for payment of monthly rates during construction;