Zoneomics Logo
search icon

Pasquotank County Unincorporated
City Zoning Code

APPLICATION OF

GENERAL REGULATIONS

§ 157.090 USE.

    No building or land shall hereafter be used or occupied and no building or part thereof shall be erected, moved or structurally altered except in conformity with the uses and dimensional regulations of this chapter, or amendments thereto, for the district in which it is located.
(Ord. passed 6-21-2021)

§ 157.091 ONLY ONE PRINCIPAL BUILDING, ONE PRINCIPAL USE ON LOT AND ORIENTATION OF A BUILDING.

   (A)   Principal building.
      (1)   Residential. No more than one principal building shall be permitted on a lot. This requirement shall not apply to the multi-family zoning district.
      (2)   Non-residential. More than one principal building may be located on a lot provided a minimum 20-foot width paved access road is maintained from a public street to each principal building for use by service or emergency vehicles. A 20-foot separation shall be maintained between each principal building.
   (B)   There shall not be more than one principal use (e.g. commercial, industrial or residential) per building and lot. This requirement shall not apply to telecommunication/broadcast towers and ancillary structures or outdoor advertising signs where permitted.
(Ord. passed 6-21-2021)

§ 157.092 MINIMUM YARDS.

    The minimum yards or other open spaces required by this chapter, including those provisions regulating intensity of use, for each and every building hereafter erected or structurally altered shall not be encroached upon or considered as meeting the yard or open space requirements or the intensity of use provisions for any other building.
(Ord. passed 6-21-2021)

§ 157.093 LOT SUBDIVISION.

    No lot shall hereafter be so reduced in area as to cause any open space required by this chapter to be less in any dimension than is herein required by the minimum yard requirement of the zone in which the lot in question is situated.
(Ord. passed 6-21-2021)

§ 157.094 CERTIFICATE OF OCCUPANCY.

    No final certificate of occupancy/compliance will be issued until all required site improvements have been completed.
(Ord. passed 6-21-2021)