After enactment of this §
145-8.2, a nonconforming mine shall not be enlarged or expanded beyond the area, size, or scope as specifically set forth in the applicable state mining permit in effect at the time this §
145-8.2 is enacted, nor shall the use of such mine be changed (a change in the use of the mine shall include, but not be limited to, a change in the type of material extracted, the method of processing of materials, and/or the products produced) after this §
145-8.2 is enacted. A mine that is not required to have a state mining permit shall not be enlarged or expanded, nor shall the use of such mine be changed after this §
145-8.2 is enacted. In no event, however, shall mining operations (regardless of whether required to have a state mining permit) be enlarged or extended beyond the boundaries of the parcel of property on which such mine exists at the time this §
145-8.2 is enacted. Any expansion or enlargement of a mine not specifically allowed under this §
145-8.2H(2) must comply with all applicable provisions of §
145-8.2, including but not limited to §
145-8.2A and
B.