Requirements Applying to All Districts
Table 8: Buffer Type Standards | ||
|---|---|---|
Buffer Type | Land Uses | Minimum Buffer Yard Setback |
Type A buffer | Minor separation shall be required between similar land developments or compatible land uses. | 20 feet |
Type B buffer | Moderate separation shall be required between single-family residential that is adjacent to more dense, smaller lot single-family, multifamily housing or rural business centers. | 30 feet |
Type C buffer | Major separation shall be required between single-family residential or multifamily housing that is adjacent to commercial areas, schools, institutional, cultural facilities, regional commercial areas, hotels, motels and office parks, or active recreation areas. | 40 feet |
Type D buffer | Major separation shall be required between single-family residential or multifamily housing that is adjacent to adjacent land uses where steep slopes of 15% or more are present. | 75 feet separation between the land use and the steep slope area |
Table 9: Octave Bond Sound Pressure | |
|---|---|
Octave Band Center Frequency (Hz) | Level (dBa) |
31.5 | 96 |
63 | 82 |
125 | 74 |
250 | 67 |
500 | 63 |
1,000 | 60 |
2,000 | 57 |
4,000 | 55 |
8,000 | 53 |
Table 10: Octave Bands | |
|---|---|
Octave Band Sound Pressure Level (dBa) | Octave Band Center Frequency (Hz) |
31.5 | 86 |
63 | 71 |
125 | 61 |
250 | 53 |
500 | 48 |
1,000 | 45 |
2,000 | 42 |
4,000 | 40 |
8,000 | 38 |
PV = 6.28 F x D |
Where: | ||
PV | = | Particle velocity (inches per second). |
F | = | Vibration frequency (cycles per second). |
D | = | Single amplitude replacement of the vibrations (inches). |
The three velocities shall be the vector sum of the three components recorded. |
Table 11: Maximum Ground-Transmitted Vibration | ||
|---|---|---|
Zone | Particle Velocity (inches per second) Adjacent Lot Line | Residential Zone |
Commercial districts | 0.10 | 0.02 |
Industrial districts | 0.15 | 0.02 |
Residential districts | 0.02 | 0.02 |
Table 12: Minimum Off Street Parking Requirements | |
|---|---|
Land Use/Activity | Minimum Vehicle Spaces |
Adult and sexually oriented business | Determined as per parking demand analysis |
Agricultural use/operation | 1 per 200 square feet of gross leasable area of building used for sale of products produced on the premises |
Animal day care | 1 per 600 square feet of floor area plus 1 per employee |
Animal hospital and veterinary service | 1 per employee on peak shift plus 1 per each 2 animal enclosures |
Bed-and-breakfast establishment (B&B) | 1 per each offered sleeping room plus 2 per each permanent resident plus 1 per each employee on peak shift |
Care facility and senior housing | |
Life care community | 2 per living unit plus 1 per each employee on peak shift |
Nursing home | 1 per each 4 beds plus 1 per each employee on peak shift |
Car wash, principal | 1 per each employee on the maximum shift and 1 per vehicle if drop off service is offered, plus vehicle queue area |
Cemetery | 1 per employee and ample accessways to the cemetery sections so as to allow parking on the accessway for gravesite services and visitations |
Civic club | 1 per 300 square feet floor area |
College/university | Parking demand analysis |
Commercial or public parking garage or lot | Not applicable |
Community center | 1 per 300 square feet floor area |
Day-care center | 1 per employee on peak shift plus 1 per each 2 of the maximum number of persons cared for at the center |
Drive-through facility, principal | 1 per employee on peak shift plus vehicle queue area |
Drug and alcohol treatment facility | 1 per 200 square feet of floor area |
Dwelling types: | |
Garden apartment | 2 per apartment unit plus 0.5 spaces per unit for guest parking |
Manufactured home | 2 per dwelling unit |
Single-family, detached | 2 per dwelling unit |
Single-family, attached (townhouse/row home) | 2 per dwelling unit |
Essential facility | 1 per service vehicle that is necessary to service the facility (if applicable) or 1 per employee plus 1 per each 3 volunteer personnel on normal shift plus 1 per 200 square feet usable office space |
Financial institution | 1 per 300 square feet floor area plus 1 per employee plus 2 per drive-through lane |
Forestry | None |
Funeral home/mortuary | 1 per 4 seats |
Gas/fuel station | 1 per 200 square feet floor area, including service bays, wash tunnels, and retail areas |
Group care facility | Parking demand analysis |
Group home | 1 per 3 beds plus 1 per each employee on peak shift |
Halfway house/recovery community | 1 per each employee on the maximum shift and 1 per each employee on the preceding shift |
Heliport | 2 per landing area |
Hospital | Parking demand analysis |
Junkyard | 1 per employee on peak shift, plus 1 per 200 square feet of floor area used for office or administrative functions |
Kennel | 1 per each employee on the maximum shift and 1 per each 200 square feet of area devoted to the kennel area |
Library | 1 per 300 square feet of floor area |
Light manufacturing, research, and testing | 1 per employee on peak shift plus 1 per 300 square feet of office area |
Logging or timber harvesting | 1 per service vehicle |
Medical clinic | 1 per 200 square feet of floor area |
Medical marijuana dispensary | 1 per 200 square feet of floor area |
Medical marijuana grower/processor | 1 per 200 square feet of floor area |
Methadone treatment facility | 1 per 200 square feet of floor area |
Microbrewery/distillery | 1 per 50 square feet of floor area plus 1 per employee on peak shift |
Mineral development | 1 per employee plus 1 per facility vehicle |
Mixed use | Combined total for the dwelling type plus the nonresidential use |
Motel or hotel | 1 per rentable room plus 1 per employee on peak shift |
Natural gas compressor station | 1 per employee |
Natural gas processing plant | 1 per employee |
Nature preserve | 1 per each acre of land, 5 spaces minimum |
Nightclub | 1 per 2 seats |
Nurserie | 1 per employee on peak shift plus 5 spaces (minimum) |
Office, business and professional | 1 per 300 square feet of floor area |
Oil and gas development | 1 per employee plus 1 per facility vehicle |
Outdoor advertising sign | 1 per site |
Park, dedicated open space, or recreational land | As determined by the Board of Supervisors, if part of a land development determined as per parking demand analysis |
Park-and-ride facility | Not applicable |
Pharmacy | 1 per 200 square feet of floor area |
Place of worship | 1 per 4 seats |
Recreation facility, commercial or private | Determined as per parking demand analysis |
Recreation facility, public | As determined by the Board of Supervisors, if part of a land development determined as per parking demand analysis |
Restaurants | 1 per 50 square feet of floor area plus 1 per employee on peak shift |
Restaurants, drive-through | 1 per 50 square feet of floor area plus vehicle queue area |
Retail sales and services | 1 per 200 square feet of floor area |
School | Determined as per parking demand analysis |
Self-storage facility | 1 per 100 storage units plus 3 for management staff |
Short-term rentals | 2 per dwelling unit |
Solar energy facilities, large | 1 per service vehicle |
Swimming pools, public/commercial, principal | Determined as per parking demand analysis |
Theater, drive-in | Determined as per parking demand analysis |
Theater, indoor | 12 per 1,000 square feet of floor area |
Trade school | Determined as per parking demand analysis |
Transit bus stop | Not applicable |
Vehicle dealership, new | 1 per each 2,000 square feet of lot area for employee and customer parking (excludes vehicle display area) |
Vehicle dealership, used | 1 per each 2,000 square feet of lot area for employee and customer parking (excludes vehicle display area) |
Vehicle repair and service station | 3 per repair bay plus 1 per each employee on peak shift |
Vehicle salvage yard | 1 per employee on peak shift, plus 1 per 200 square feet of floor area used for office or administrative functions |
Vineyard | Determined as per parking demand analysis |
Warehouses | 1 per employee on peak shift plus 1 per 300 square feet of office area |
Warehouse sales | 1 per employee on peak shift and 1 plus 200 square feet of sales area |
Wind energy facility, large | 1 per service vehicle |
Winery | Determined as per parking demand analysis |
WCF | 1 per service vehicle |
Uses not listed | Determined as per parking demand analysis; parking spot approval will be determined by the Township Traffic Engineer and Township staff |
Table 13: Minimum Parking Stall Dimension Requirements | ||||
|---|---|---|---|---|
Type of Parking | Angle | Stall Length (feet) | Stall Width (feet) | Aisle Width (feet) |
Traditional | 90 | 18 | 9 | 24 |
Traditional | 60 | 22 | 10 | 20 |
Traditional | 45 | 20 | 10 | 15 |
ADA | 90 | 19 | 13 | 24 |
ADA | 60 | 21 | 13 | 18 |
ADA | 45 | 19 | 13 | 13 |
Table 14: ADA Parking Space Requirements | |
|---|---|
Total Spaces Provided | Required Minimum Number of Accessible Spaces |
1 to 25 | 1 |
26 to 50 | 2 |
51 to 75 | 3 |
76 to 100 | 4 |
101 to 150 | 5 |
151 to 200 | 6 |
201 to 300 | 7 |
301 to 400 | 8 |
401 to 500 | 9 |
501 to 1,000 | 2% of total |
More than 1,000 | 20, plus 1 for each 100 spaces over 1,000 |
Table 15: EV Charging Station Requirements | |
|---|---|
Land Use Type | % of EV Parking Spaces |
Garden apartment (guest parking areas) | 10% |
Motel or hotel | 3% |
Retail | 1% |
Restaurant | 1% |
Office, business or professional | 3% |
Hospital | 3% |
Medical clinic | 3% |
Light research, manufacturing, testing | 1% |
School or trade school | 3% |
Place of worship | 3% |
All recreational uses (public, private, or commercial) | 1% |
Other | 3% |
Table 16: Minimum Off-Street Queuing/Stacking Requirements | ||
|---|---|---|
Land Use Type | Minimum Stacking Spaces | Measured From |
Car wash, automatic | 9 | Entrance |
Car wash, self-service | 2 | Entrance |
Financial institution, ATM lane | 3 | Teller |
Financial institution, teller lane | 4 | Teller or window |
Gas/fuel station | 4 | Pump island |
Pharmacy | 4 | Window |
Restaurant, drive-through | 6 | Order box kiosk |
Restaurant, drive-through | 4 | Order box to pick up window box kiosk |
Vehicle repair and service station | 3 | Per bay service bay |
Other | Determined by Zoning Officer | |
Table 17: Cluster Box Unit (CBU) Parking Requirements | |
|---|---|
Number of Mailboxes per Location | Number of Parking Spaces (Minimum) |
1 - 25 | 2 |
26 - 50 | 4 |
51 - 80 | 6 |
80 - 110 | 8 |
111+ | 8 + 1 per each additional 25 mailboxes |
Table 18: Ground Monument Sign Allowable Increases | ||
|---|---|---|
Setback (feet) | Height (feet) | Area (square feet) |
15 | 5 | 60 |
18 | 6 | 68 |
21 | 7 | 76 |
24 | 8 | 84 |
27 | 9 | 92 |
30 | 10 | 100 |
Table 19: Freestanding and Pole/Pylon Sign Allowable Increases | ||
|---|---|---|
Setback (feet) | Height (feet) | Area (square feet) |
15 | 10 | 30 |
20 | 14 | 40 |
25 | 18 | 50 |
30 | 22 | 60 |
Requirements Applying to All Districts
Table 8: Buffer Type Standards | ||
|---|---|---|
Buffer Type | Land Uses | Minimum Buffer Yard Setback |
Type A buffer | Minor separation shall be required between similar land developments or compatible land uses. | 20 feet |
Type B buffer | Moderate separation shall be required between single-family residential that is adjacent to more dense, smaller lot single-family, multifamily housing or rural business centers. | 30 feet |
Type C buffer | Major separation shall be required between single-family residential or multifamily housing that is adjacent to commercial areas, schools, institutional, cultural facilities, regional commercial areas, hotels, motels and office parks, or active recreation areas. | 40 feet |
Type D buffer | Major separation shall be required between single-family residential or multifamily housing that is adjacent to adjacent land uses where steep slopes of 15% or more are present. | 75 feet separation between the land use and the steep slope area |
Table 9: Octave Bond Sound Pressure | |
|---|---|
Octave Band Center Frequency (Hz) | Level (dBa) |
31.5 | 96 |
63 | 82 |
125 | 74 |
250 | 67 |
500 | 63 |
1,000 | 60 |
2,000 | 57 |
4,000 | 55 |
8,000 | 53 |
Table 10: Octave Bands | |
|---|---|
Octave Band Sound Pressure Level (dBa) | Octave Band Center Frequency (Hz) |
31.5 | 86 |
63 | 71 |
125 | 61 |
250 | 53 |
500 | 48 |
1,000 | 45 |
2,000 | 42 |
4,000 | 40 |
8,000 | 38 |
PV = 6.28 F x D |
Where: | ||
PV | = | Particle velocity (inches per second). |
F | = | Vibration frequency (cycles per second). |
D | = | Single amplitude replacement of the vibrations (inches). |
The three velocities shall be the vector sum of the three components recorded. |
Table 11: Maximum Ground-Transmitted Vibration | ||
|---|---|---|
Zone | Particle Velocity (inches per second) Adjacent Lot Line | Residential Zone |
Commercial districts | 0.10 | 0.02 |
Industrial districts | 0.15 | 0.02 |
Residential districts | 0.02 | 0.02 |
Table 12: Minimum Off Street Parking Requirements | |
|---|---|
Land Use/Activity | Minimum Vehicle Spaces |
Adult and sexually oriented business | Determined as per parking demand analysis |
Agricultural use/operation | 1 per 200 square feet of gross leasable area of building used for sale of products produced on the premises |
Animal day care | 1 per 600 square feet of floor area plus 1 per employee |
Animal hospital and veterinary service | 1 per employee on peak shift plus 1 per each 2 animal enclosures |
Bed-and-breakfast establishment (B&B) | 1 per each offered sleeping room plus 2 per each permanent resident plus 1 per each employee on peak shift |
Care facility and senior housing | |
Life care community | 2 per living unit plus 1 per each employee on peak shift |
Nursing home | 1 per each 4 beds plus 1 per each employee on peak shift |
Car wash, principal | 1 per each employee on the maximum shift and 1 per vehicle if drop off service is offered, plus vehicle queue area |
Cemetery | 1 per employee and ample accessways to the cemetery sections so as to allow parking on the accessway for gravesite services and visitations |
Civic club | 1 per 300 square feet floor area |
College/university | Parking demand analysis |
Commercial or public parking garage or lot | Not applicable |
Community center | 1 per 300 square feet floor area |
Day-care center | 1 per employee on peak shift plus 1 per each 2 of the maximum number of persons cared for at the center |
Drive-through facility, principal | 1 per employee on peak shift plus vehicle queue area |
Drug and alcohol treatment facility | 1 per 200 square feet of floor area |
Dwelling types: | |
Garden apartment | 2 per apartment unit plus 0.5 spaces per unit for guest parking |
Manufactured home | 2 per dwelling unit |
Single-family, detached | 2 per dwelling unit |
Single-family, attached (townhouse/row home) | 2 per dwelling unit |
Essential facility | 1 per service vehicle that is necessary to service the facility (if applicable) or 1 per employee plus 1 per each 3 volunteer personnel on normal shift plus 1 per 200 square feet usable office space |
Financial institution | 1 per 300 square feet floor area plus 1 per employee plus 2 per drive-through lane |
Forestry | None |
Funeral home/mortuary | 1 per 4 seats |
Gas/fuel station | 1 per 200 square feet floor area, including service bays, wash tunnels, and retail areas |
Group care facility | Parking demand analysis |
Group home | 1 per 3 beds plus 1 per each employee on peak shift |
Halfway house/recovery community | 1 per each employee on the maximum shift and 1 per each employee on the preceding shift |
Heliport | 2 per landing area |
Hospital | Parking demand analysis |
Junkyard | 1 per employee on peak shift, plus 1 per 200 square feet of floor area used for office or administrative functions |
Kennel | 1 per each employee on the maximum shift and 1 per each 200 square feet of area devoted to the kennel area |
Library | 1 per 300 square feet of floor area |
Light manufacturing, research, and testing | 1 per employee on peak shift plus 1 per 300 square feet of office area |
Logging or timber harvesting | 1 per service vehicle |
Medical clinic | 1 per 200 square feet of floor area |
Medical marijuana dispensary | 1 per 200 square feet of floor area |
Medical marijuana grower/processor | 1 per 200 square feet of floor area |
Methadone treatment facility | 1 per 200 square feet of floor area |
Microbrewery/distillery | 1 per 50 square feet of floor area plus 1 per employee on peak shift |
Mineral development | 1 per employee plus 1 per facility vehicle |
Mixed use | Combined total for the dwelling type plus the nonresidential use |
Motel or hotel | 1 per rentable room plus 1 per employee on peak shift |
Natural gas compressor station | 1 per employee |
Natural gas processing plant | 1 per employee |
Nature preserve | 1 per each acre of land, 5 spaces minimum |
Nightclub | 1 per 2 seats |
Nurserie | 1 per employee on peak shift plus 5 spaces (minimum) |
Office, business and professional | 1 per 300 square feet of floor area |
Oil and gas development | 1 per employee plus 1 per facility vehicle |
Outdoor advertising sign | 1 per site |
Park, dedicated open space, or recreational land | As determined by the Board of Supervisors, if part of a land development determined as per parking demand analysis |
Park-and-ride facility | Not applicable |
Pharmacy | 1 per 200 square feet of floor area |
Place of worship | 1 per 4 seats |
Recreation facility, commercial or private | Determined as per parking demand analysis |
Recreation facility, public | As determined by the Board of Supervisors, if part of a land development determined as per parking demand analysis |
Restaurants | 1 per 50 square feet of floor area plus 1 per employee on peak shift |
Restaurants, drive-through | 1 per 50 square feet of floor area plus vehicle queue area |
Retail sales and services | 1 per 200 square feet of floor area |
School | Determined as per parking demand analysis |
Self-storage facility | 1 per 100 storage units plus 3 for management staff |
Short-term rentals | 2 per dwelling unit |
Solar energy facilities, large | 1 per service vehicle |
Swimming pools, public/commercial, principal | Determined as per parking demand analysis |
Theater, drive-in | Determined as per parking demand analysis |
Theater, indoor | 12 per 1,000 square feet of floor area |
Trade school | Determined as per parking demand analysis |
Transit bus stop | Not applicable |
Vehicle dealership, new | 1 per each 2,000 square feet of lot area for employee and customer parking (excludes vehicle display area) |
Vehicle dealership, used | 1 per each 2,000 square feet of lot area for employee and customer parking (excludes vehicle display area) |
Vehicle repair and service station | 3 per repair bay plus 1 per each employee on peak shift |
Vehicle salvage yard | 1 per employee on peak shift, plus 1 per 200 square feet of floor area used for office or administrative functions |
Vineyard | Determined as per parking demand analysis |
Warehouses | 1 per employee on peak shift plus 1 per 300 square feet of office area |
Warehouse sales | 1 per employee on peak shift and 1 plus 200 square feet of sales area |
Wind energy facility, large | 1 per service vehicle |
Winery | Determined as per parking demand analysis |
WCF | 1 per service vehicle |
Uses not listed | Determined as per parking demand analysis; parking spot approval will be determined by the Township Traffic Engineer and Township staff |
Table 13: Minimum Parking Stall Dimension Requirements | ||||
|---|---|---|---|---|
Type of Parking | Angle | Stall Length (feet) | Stall Width (feet) | Aisle Width (feet) |
Traditional | 90 | 18 | 9 | 24 |
Traditional | 60 | 22 | 10 | 20 |
Traditional | 45 | 20 | 10 | 15 |
ADA | 90 | 19 | 13 | 24 |
ADA | 60 | 21 | 13 | 18 |
ADA | 45 | 19 | 13 | 13 |
Table 14: ADA Parking Space Requirements | |
|---|---|
Total Spaces Provided | Required Minimum Number of Accessible Spaces |
1 to 25 | 1 |
26 to 50 | 2 |
51 to 75 | 3 |
76 to 100 | 4 |
101 to 150 | 5 |
151 to 200 | 6 |
201 to 300 | 7 |
301 to 400 | 8 |
401 to 500 | 9 |
501 to 1,000 | 2% of total |
More than 1,000 | 20, plus 1 for each 100 spaces over 1,000 |
Table 15: EV Charging Station Requirements | |
|---|---|
Land Use Type | % of EV Parking Spaces |
Garden apartment (guest parking areas) | 10% |
Motel or hotel | 3% |
Retail | 1% |
Restaurant | 1% |
Office, business or professional | 3% |
Hospital | 3% |
Medical clinic | 3% |
Light research, manufacturing, testing | 1% |
School or trade school | 3% |
Place of worship | 3% |
All recreational uses (public, private, or commercial) | 1% |
Other | 3% |
Table 16: Minimum Off-Street Queuing/Stacking Requirements | ||
|---|---|---|
Land Use Type | Minimum Stacking Spaces | Measured From |
Car wash, automatic | 9 | Entrance |
Car wash, self-service | 2 | Entrance |
Financial institution, ATM lane | 3 | Teller |
Financial institution, teller lane | 4 | Teller or window |
Gas/fuel station | 4 | Pump island |
Pharmacy | 4 | Window |
Restaurant, drive-through | 6 | Order box kiosk |
Restaurant, drive-through | 4 | Order box to pick up window box kiosk |
Vehicle repair and service station | 3 | Per bay service bay |
Other | Determined by Zoning Officer | |
Table 17: Cluster Box Unit (CBU) Parking Requirements | |
|---|---|
Number of Mailboxes per Location | Number of Parking Spaces (Minimum) |
1 - 25 | 2 |
26 - 50 | 4 |
51 - 80 | 6 |
80 - 110 | 8 |
111+ | 8 + 1 per each additional 25 mailboxes |
Table 18: Ground Monument Sign Allowable Increases | ||
|---|---|---|
Setback (feet) | Height (feet) | Area (square feet) |
15 | 5 | 60 |
18 | 6 | 68 |
21 | 7 | 76 |
24 | 8 | 84 |
27 | 9 | 92 |
30 | 10 | 100 |
Table 19: Freestanding and Pole/Pylon Sign Allowable Increases | ||
|---|---|---|
Setback (feet) | Height (feet) | Area (square feet) |
15 | 10 | 30 |
20 | 14 | 40 |
25 | 18 | 50 |
30 | 22 | 60 |