High Technology and Office Park HTOP District
HTOP DISTRICT. Dimensional Requirements | |
|---|---|
Minimum lot size | 30,000 sf |
Minimum lot width | 150 ft |
Minimum front setback | 70 ft1 |
Minimum side setback | 25 ft1 |
Minimum rear setback | 50 ft1 |
NOTE: | |
1 | Or 100 feet from any residential district boundary. |
HTOP DISTRICT. Bulk Requirements | |
|---|---|
Maximum Building Height | 40 ft1 |
Maximum Lot Coverage | |
Gross Impervious Surface | 50% |
Minimum Open Space or Landscaped Area | |
Share of Lot Area | 50% |
NOTE: | |
1 | Chimneys may extend 10 feet above top of structure. |
High Technology and Office Park HTOP District
HTOP DISTRICT. Dimensional Requirements | |
|---|---|
Minimum lot size | 30,000 sf |
Minimum lot width | 150 ft |
Minimum front setback | 70 ft1 |
Minimum side setback | 25 ft1 |
Minimum rear setback | 50 ft1 |
NOTE: | |
1 | Or 100 feet from any residential district boundary. |
HTOP DISTRICT. Bulk Requirements | |
|---|---|
Maximum Building Height | 40 ft1 |
Maximum Lot Coverage | |
Gross Impervious Surface | 50% |
Minimum Open Space or Landscaped Area | |
Share of Lot Area | 50% |
NOTE: | |
1 | Chimneys may extend 10 feet above top of structure. |