An analysis showing that the development or change in use is consistent with the facilities, proposed in the study, whether built or planned, and the location of all rights-of-way required by the study on the lot or property which are to be dedicated as part of the approval process, provided however, if the Township Engineer determines that the facilities required by the study cannot be immediately constructed, the Township may accept, in lieu of dedication, a legally binding offer to dedicate the same in the future in a form approved by the Township Solicitor. Such agreement shall be in recordable form.