Site reclamation. Haul roads shall be smoothed, sloped, ditched and seeded with perennial grasses, as needed. Landings shall be smoothed, seeded and protected with waterbars, as needed. At stream crossings, temporary stream culverts and bridges shall be removed, and stream banks shall be restabilized. All reclamation efforts shall be subject to inspection by the Town to assure compliance with this provision.