Zoning District | Duration of Permit | Permits per Parcel |
Residential (non-profit) | 14 days | 2 per year |
AG/RES (all other) | 14 days | 1 per year |
Commercial | 30 days | 2 per year |
Industrial | 30 days | 2 per year |
District | Type | # per parcel | Size | Setback | Maximum |
District | Type | # per parcel | Size | Setback | Maximum |
Agricultural (AG) | Nondwelling use | 1 | 32 sq. ft. | Within required yard | 5 ft. |
Small sign | 1 | 6 sq. ft. | Within required yard | 4 ft. | |
Wall sign | 1 | 32 sq. ft. | Any wall | Any wall | |
Portable/temp orary | 1 | 32 sq. ft. | Within required yard | 5 ft. | |
Integral sign | 1 | No limit | Any wall or roof | Any wall or roof | |
Single-Family and Multiple- Family Residential (R-1, R-2, MR) | Nondwelling use | 1 | 32 sq. ft. | Within required yard | 5 ft. |
Small sign | 1 | 6 sq. ft. | Within required yard | 4 ft. | |
Integral sign | 2 | 24 sq. ft. each | Within required yard | 5 ft. | |
Subdivision | 2 | 24 sq. ft. | Within required yard | ||
Portable/temp orary | 1 | 32 sq. ft. | Within required yard | 5 ft. | |
Commercial (C) | Freestanding or monument | 1 | 32 sq. ft. | Within required yard | 10' at grade of lot line |
Wall | 1 | 64 sq. ft. or 70% of any wall | Any wall facing a road | Height of highest eave | |
Marquee/cano py | 1 | 64 sq. ft. or 70% of any wall | On structure | Height of highest eave | |
Portable/temp orary | 1 | 32 sq. ft. | Within required yard | 5 ft. | |
Street banner | See notes | See notes | See notes | NA | |
Electronic message board | 1 | 32 sq. ft. | Within required yard | 10 ft. | |
Industrial (M) | Wall | 1 | 64 sq. ft. or 70% of any wall facing a road | Any wall Within required yard | Any wall Height of highest eave |
Freestanding or monument | 1 | 32 sq. ft. | Within required yard | 10' at the grade of the lot line | |
Roof | 1 | 60 sq. ft. | Within required yard | Roofline | |
Portable/temp orary | 1 | 32 sq. ft. | Within required yard | 5 ft. | |
Recreation (REC) | Monument | 1 | 32 sq. ft. | Within required yard | 6' at the grade of the lot line |
Zoning District | Duration of Permit | Permits per Parcel |
Residential (non-profit) | 14 days | 2 per year |
AG/RES (all other) | 14 days | 1 per year |
Commercial | 30 days | 2 per year |
Industrial | 30 days | 2 per year |
District | Type | # per parcel | Size | Setback | Maximum |
District | Type | # per parcel | Size | Setback | Maximum |
Agricultural (AG) | Nondwelling use | 1 | 32 sq. ft. | Within required yard | 5 ft. |
Small sign | 1 | 6 sq. ft. | Within required yard | 4 ft. | |
Wall sign | 1 | 32 sq. ft. | Any wall | Any wall | |
Portable/temp orary | 1 | 32 sq. ft. | Within required yard | 5 ft. | |
Integral sign | 1 | No limit | Any wall or roof | Any wall or roof | |
Single-Family and Multiple- Family Residential (R-1, R-2, MR) | Nondwelling use | 1 | 32 sq. ft. | Within required yard | 5 ft. |
Small sign | 1 | 6 sq. ft. | Within required yard | 4 ft. | |
Integral sign | 2 | 24 sq. ft. each | Within required yard | 5 ft. | |
Subdivision | 2 | 24 sq. ft. | Within required yard | ||
Portable/temp orary | 1 | 32 sq. ft. | Within required yard | 5 ft. | |
Commercial (C) | Freestanding or monument | 1 | 32 sq. ft. | Within required yard | 10' at grade of lot line |
Wall | 1 | 64 sq. ft. or 70% of any wall | Any wall facing a road | Height of highest eave | |
Marquee/cano py | 1 | 64 sq. ft. or 70% of any wall | On structure | Height of highest eave | |
Portable/temp orary | 1 | 32 sq. ft. | Within required yard | 5 ft. | |
Street banner | See notes | See notes | See notes | NA | |
Electronic message board | 1 | 32 sq. ft. | Within required yard | 10 ft. | |
Industrial (M) | Wall | 1 | 64 sq. ft. or 70% of any wall facing a road | Any wall Within required yard | Any wall Height of highest eave |
Freestanding or monument | 1 | 32 sq. ft. | Within required yard | 10' at the grade of the lot line | |
Roof | 1 | 60 sq. ft. | Within required yard | Roofline | |
Portable/temp orary | 1 | 32 sq. ft. | Within required yard | 5 ft. | |
Recreation (REC) | Monument | 1 | 32 sq. ft. | Within required yard | 6' at the grade of the lot line |