“P” Definitions.
“Parcel”
means a legally defined area of land created through a partition.
“Parking”
means areas designed and developed in accordance with Chapter 3.3 SDC for automobile or bicycle parking, as applicable.
“Parking area”
means all the area devoted to the standing, maneuvering, and circulation of motor vehicles. Parking areas do not include driveways or areas devoted exclusively to nonpassenger loading.
“Parking bay”
means a parking area with a concrete curb forming one side of the parking stall(s). Bays are typically adjacent and accessible to a sidewalk or walkway within a development.
“Parking lot perimeter”
means the boundary of a parking lot area that usually contains a landscaped buffer area.
“Parking space”
means a space designed to provide standing area for a motor vehicle. See Chapter 3.3 SDC for parking space standards.
Parking versus storage.
“Parking” is to leave a motor vehicle for a temporary time, no longer than 72 hours. “Storage” is to place or leave in a location for maintenance, repair, sale, rental, or future use more than 72 hours in the future. See also “Exterior display.”
“Partition”
means to divide an area or tract of land into two or three parcels within a calendar year when such area or tract of land exists as a unit or contiguous units of land under single ownership at the beginning of such year. (See ORS 92.010(8))
Pathway.
See Transportation-Related Definitions.
Pedestrian Amenity(ies).
See Development-Related Definitions for examples and related definitions.
“Planning office”
means the Silverton City Hall, Silverton, Oregon.
“Planter strip”
means a landscaped area for city-approved street trees and other plantings within the public right-of-way, usually a continuous planter area between the street and a sidewalk. See also “Tree well.” Refer to the city of Silverton Street Tree and Tree Crown Area Reference List in SDC § 3.6.170.
“Plat”
means diagrams, drawings and other writing containing all the descriptions, locations, dedications, provisions, and information concerning a land division. This term includes the state law definitions of “partition plat” and “subdivision plat.” See also Chapter 4.3 SDC, Land Divisions and Property Line Adjustments.
“Plaza”
means an area generally open to the public on a controlled basis and used for passive recreational activities and relaxation. Plazas are paved areas typically provided with amenities, such as seating, drinking and ornamental fountains, art, trees, and landscaping for use by pedestrians. See also “Pedestrian amenities” under Development-Related Definitions.
“Practicable”
means capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes.
“Primary structure”
means a structure or combination of structures of chief importance or function on a site. In general, the primary use of the site is carried out in a primary structure. The difference between a primary and accessory structure is determined by comparing the size, placement, similarity of design, use of common building materials, and the orientation of the structures on a site.
“Primary use”
means an activity or combination of activities of chief importance on the site; one of the main purposes for which the land or structures are intended, designed, or ordinarily used. A site may have more than one primary use.
“Project”
means an existing or proposed use or development.
“Project, major”
means a project that requires design review (Chapter 4.2), subdivision or partition review (Chapter 4.3), conditional use review (Chapter 4.4), or planned development review (Chapter 4.5).
“Project, minor”
means a project that requires land use review but does not require design review (Chapter 4.2), subdivision or partition review (Chapter 4.3), conditional use review (Chapter 4.4), or planned development review (Chapter 4.5).
“Property line adjustment”
means the relocation of a single common property line between two abutting properties, in conformance with ORS 92.010(11). See Figure.
Property Line, Front, Rear, Interior Side, Street Side.
See “Lot lines” under “Lot.”
“Public access easement”
means an easement recorded for the purpose of providing vehicle, bicycle, and/or pedestrian access from a public street to a parcel across intervening property under separate ownership from the parcel being provided access. See also Transportation-Related Definitions.
“Public safety facility”
means a facility necessary to respond to an immediate hazard to the public health and safety, and that is owned, leased, or operated by the city of Silverton. Public safety facilities include fire and police stations, flood control facilities, water towers and pump stations needed for emergency service, and emergency communication broadcast facilities.
“Public improvements”
means development of public infrastructure, as required by the city, county, special district, or road authority, as applicable. See Chapter 3.4 SDC.
“Public right-of-way”
means land dedication or easement conveyance to the city or other public entity for public use; typically for streets, utilities, parkland and/or similar facilities. Permanent structures, objects and buildings are not allowed to project over or encroach into public rights-of-way, except as allowed by the city for landscaping and trees.