Special Provisions
Please note that antenna structures operated by licensed amateur radio operators are addressed in Sections 214-3.3C(7) and 214-4.4B(4)(h). |
Applicants to the Connecticut Siting Council are strongly encouraged to meet with the Zoning Commission within 30 days of the preapplication notice to a municipality as required by C.G.S. Section 16-501.(f)(1), to review technical reports concerning: | |
• | The need for the facility; |
• | A description of the site selection process; |
• | Any alternate sites considered; |
• | Measures to mitigate potential aesthetic impacts of the facility; and |
• | The potential environmental effects of the proposed facility. |
Such meeting with the Commission shall not be in lieu of the public informational meeting as provided for by C.G.S. Section 16-501.(f)(1). | |
Preferred | ||
Existing utility poles | Small cell or other similar telecommunication facilities on existing utility distribution poles | |
Structure-mounted (provided that such installation preserves the character and integrity of those structures) | Totally enclosed within: | |
• | An existing structure | |
• | A new steeple, chimney, or similar architecturally compatible structure | |
Externally mounted on the wall of: | ||
• | An existing structure | |
• | A new steeple, chimney, or similar architecturally compatible structure | |
Mounted on or within a new purpose-built structure designed to fit Somers's overall character (such as a structure designed to look like a barn, silo, or similar) | ||
Externally mounted on the roof of: | ||
• | An existing structure | |
• | A new steeple, chimney, or similar architecturally compatible structure | |
Internal mount on tower | New internally mounted antennas on an existing or new tower (monopole or flagpole) | |
Not Preferred | ||
Up-sized utility poles | Small cell or other similar telecommunication facilities on utility poles that are substantially larger in size or scale compared to existing utility poles | |
External mount on tower | New antennas externally mounted on existing or new pole (co-location) including monopine or monopole New lattice tower New guyed tower | |
Information | ZC | CSC | PURA | |||
|---|---|---|---|---|---|---|
(1) | Carrier identified | |||||
(a) | A statement identifying which licensed carrier is either an applicant or a co-applicant on the application | |||||
(2) | Emergency service needs considered | |||||
(a) | A statement identifying whether an authorized emergency services organization (police, fire and/or ambulance services) is either an applicant or a co-applicant on the application | |||||
(b) | If an authorized emergency services organization is not a co-applicant, statements from police, fire and ambulance services indicating whether they have any emergency service communication needs which could be addressed by the proposed facility | |||||
(c) | Documentation that the proposed facility will not cause any interference with any emergency or public safety radio system | |||||
(3) | Regulatory compliance | |||||
(a) | A statement that all towers, antennas, and/or equipment will, at all times, be operated in accordance with relevant local, state, and federal regulations | |||||
(b) | Documentation regarding noise emission from equipment and steps to be taken so that any equipment noise is inaudible at the property line | |||||
(4) | Coverage | |||||
(a) | Coverage parameters used in the analysis of potential sites | |||||
(b) | Information on all tower sites considered and the reasons for rejection of any site | |||||
(5) | Visual impact and extent | |||||
(a) | For a new tower, the boundaries of the tower's viewshed (the area within which the tower can be seen based upon topography) | |||||
(b) | For a new tower, notice of a balloon test for the proposed site shall be published in accordance with the notice provisions in C.G.S. Section 8-7. | |||||
(c) | Illustrations of the proposed tower, antennas, equipment shelters, and any other construction or development attendant to the facility | |||||
(d) | Visual simulation of the proposed tower, antennas and equipment enclosure(s) | |||||
(e) | A statement indicating whether utilities serving the facility will be overhead or underground | |||||
(f) | A statement indicating whether the site will require lighting per the FAA regulations and, if so, what type of lighting is proposed | |||||
(g) | A statement as to whether any commercial logo or identification will be placed on any equipment so as to be visible from adjacent property or a public street | |||||
(6) | Construction plans | |||||
(a) | For towers, site plans with 2-foot contour intervals showing all proposed changes to the existing property, including clearing, grading, structure and equipment location(s), temporary or permanent roads or driveways, existing and proposed stormwater management facilities, and other considerations | |||||
(b) | For utility pole installations, site plans showing all proposed changes within the street right-of-way or on nearby property, including vegetation removal, grading, and other considerations | |||||
(c) | For towers, drawings of the tower and key dimensional parameters, including any built-in yield point or other parameter | |||||
(d) | Drawings of any building, underground vault, fence, screening, or other enclosure for equipment | |||||
(e) | For towers or for any ground-based equipment or structures, landscaping drawings | |||||
(7) | Other requirements | |||||
(a) | A statement shall be submitted indicating whether there are any deed restrictions or easements or other encumbrances that would affect the installation of wireless communication facilities | |||||
(b) | For applications to PURA, the applicant shall submit a statement indicating their willingness to schedule a public information meeting in Somers if requested by the Town | |||||
(8) | Operational considerations | |||||
(a) | A statement about whether the site will require lighting per the FAA regulations or be installed for any reason and, if so, what type of lighting is proposed | |||||
(b) | The applicant's program for annual reporting of the contact person | |||||
(c) | The applicant's proposal for documenting, upon request by the Town: | |||||
• | Whether radio frequency emissions from the antennas and/or equipment exceed FCC guidelines and actions taken to correct any noncompliance | |||||
• | Whether equipment at the site complies with noise limitations and actions taken to correct any noncompliance | |||||
(d) | For new towers, the applicant shall prepare and submit an affidavit acceptable to the Commission, for recording on the land records, declaring responsibility for the orderly removal of towers, antennas and associated equipment and restoration of the site at the operator's expense. | |||||
(e) | A written maintenance plan for the site, including, but not limited to, all facilities including landscaping at the site | |||||
Existing earthwork operations may continue as nonconforming uses until the expiration of their yearly permit, but the operator must then file a statement with the Commission setting forth the area included in the operation and the nature, extent and purpose of the operation now being carried on. After such a statement is filed with and approved by the Commission, any extension, change or renewal of the operation shall be considered a new operation and shall require compliance with these regulations. |
URL active as of April 2021 |
https://portal.ct.gov/-/media/DEEP/site clean up/potable water/Blasting-Guidance-Dec2019.pdf |
Special Provisions
Please note that antenna structures operated by licensed amateur radio operators are addressed in Sections 214-3.3C(7) and 214-4.4B(4)(h). |
Applicants to the Connecticut Siting Council are strongly encouraged to meet with the Zoning Commission within 30 days of the preapplication notice to a municipality as required by C.G.S. Section 16-501.(f)(1), to review technical reports concerning: | |
• | The need for the facility; |
• | A description of the site selection process; |
• | Any alternate sites considered; |
• | Measures to mitigate potential aesthetic impacts of the facility; and |
• | The potential environmental effects of the proposed facility. |
Such meeting with the Commission shall not be in lieu of the public informational meeting as provided for by C.G.S. Section 16-501.(f)(1). | |
Preferred | ||
Existing utility poles | Small cell or other similar telecommunication facilities on existing utility distribution poles | |
Structure-mounted (provided that such installation preserves the character and integrity of those structures) | Totally enclosed within: | |
• | An existing structure | |
• | A new steeple, chimney, or similar architecturally compatible structure | |
Externally mounted on the wall of: | ||
• | An existing structure | |
• | A new steeple, chimney, or similar architecturally compatible structure | |
Mounted on or within a new purpose-built structure designed to fit Somers's overall character (such as a structure designed to look like a barn, silo, or similar) | ||
Externally mounted on the roof of: | ||
• | An existing structure | |
• | A new steeple, chimney, or similar architecturally compatible structure | |
Internal mount on tower | New internally mounted antennas on an existing or new tower (monopole or flagpole) | |
Not Preferred | ||
Up-sized utility poles | Small cell or other similar telecommunication facilities on utility poles that are substantially larger in size or scale compared to existing utility poles | |
External mount on tower | New antennas externally mounted on existing or new pole (co-location) including monopine or monopole New lattice tower New guyed tower | |
Information | ZC | CSC | PURA | |||
|---|---|---|---|---|---|---|
(1) | Carrier identified | |||||
(a) | A statement identifying which licensed carrier is either an applicant or a co-applicant on the application | |||||
(2) | Emergency service needs considered | |||||
(a) | A statement identifying whether an authorized emergency services organization (police, fire and/or ambulance services) is either an applicant or a co-applicant on the application | |||||
(b) | If an authorized emergency services organization is not a co-applicant, statements from police, fire and ambulance services indicating whether they have any emergency service communication needs which could be addressed by the proposed facility | |||||
(c) | Documentation that the proposed facility will not cause any interference with any emergency or public safety radio system | |||||
(3) | Regulatory compliance | |||||
(a) | A statement that all towers, antennas, and/or equipment will, at all times, be operated in accordance with relevant local, state, and federal regulations | |||||
(b) | Documentation regarding noise emission from equipment and steps to be taken so that any equipment noise is inaudible at the property line | |||||
(4) | Coverage | |||||
(a) | Coverage parameters used in the analysis of potential sites | |||||
(b) | Information on all tower sites considered and the reasons for rejection of any site | |||||
(5) | Visual impact and extent | |||||
(a) | For a new tower, the boundaries of the tower's viewshed (the area within which the tower can be seen based upon topography) | |||||
(b) | For a new tower, notice of a balloon test for the proposed site shall be published in accordance with the notice provisions in C.G.S. Section 8-7. | |||||
(c) | Illustrations of the proposed tower, antennas, equipment shelters, and any other construction or development attendant to the facility | |||||
(d) | Visual simulation of the proposed tower, antennas and equipment enclosure(s) | |||||
(e) | A statement indicating whether utilities serving the facility will be overhead or underground | |||||
(f) | A statement indicating whether the site will require lighting per the FAA regulations and, if so, what type of lighting is proposed | |||||
(g) | A statement as to whether any commercial logo or identification will be placed on any equipment so as to be visible from adjacent property or a public street | |||||
(6) | Construction plans | |||||
(a) | For towers, site plans with 2-foot contour intervals showing all proposed changes to the existing property, including clearing, grading, structure and equipment location(s), temporary or permanent roads or driveways, existing and proposed stormwater management facilities, and other considerations | |||||
(b) | For utility pole installations, site plans showing all proposed changes within the street right-of-way or on nearby property, including vegetation removal, grading, and other considerations | |||||
(c) | For towers, drawings of the tower and key dimensional parameters, including any built-in yield point or other parameter | |||||
(d) | Drawings of any building, underground vault, fence, screening, or other enclosure for equipment | |||||
(e) | For towers or for any ground-based equipment or structures, landscaping drawings | |||||
(7) | Other requirements | |||||
(a) | A statement shall be submitted indicating whether there are any deed restrictions or easements or other encumbrances that would affect the installation of wireless communication facilities | |||||
(b) | For applications to PURA, the applicant shall submit a statement indicating their willingness to schedule a public information meeting in Somers if requested by the Town | |||||
(8) | Operational considerations | |||||
(a) | A statement about whether the site will require lighting per the FAA regulations or be installed for any reason and, if so, what type of lighting is proposed | |||||
(b) | The applicant's program for annual reporting of the contact person | |||||
(c) | The applicant's proposal for documenting, upon request by the Town: | |||||
• | Whether radio frequency emissions from the antennas and/or equipment exceed FCC guidelines and actions taken to correct any noncompliance | |||||
• | Whether equipment at the site complies with noise limitations and actions taken to correct any noncompliance | |||||
(d) | For new towers, the applicant shall prepare and submit an affidavit acceptable to the Commission, for recording on the land records, declaring responsibility for the orderly removal of towers, antennas and associated equipment and restoration of the site at the operator's expense. | |||||
(e) | A written maintenance plan for the site, including, but not limited to, all facilities including landscaping at the site | |||||
Existing earthwork operations may continue as nonconforming uses until the expiration of their yearly permit, but the operator must then file a statement with the Commission setting forth the area included in the operation and the nature, extent and purpose of the operation now being carried on. After such a statement is filed with and approved by the Commission, any extension, change or renewal of the operation shall be considered a new operation and shall require compliance with these regulations. |
URL active as of April 2021 |
https://portal.ct.gov/-/media/DEEP/site clean up/potable water/Blasting-Guidance-Dec2019.pdf |