Application and Review Procedures
Action | Exempt | Admin Review | Site Plan Review |
|---|---|---|---|
Construction/Expansion/Alteration | |||
Residential Use | |||
Single- or two-family dwelling on an approved lot | |||
Multi-family dwelling, up to 4 units | |||
Multi-family dwelling, over 4 units | |||
Nonresidential or Mixed Use | |||
Up to 20,000 square feet or 25% of existing gross floor area2 | |||
Over 20,000 square feet or 25% of existing gross floor area2 | |||
Accessory Use or Structure1 | |||
Up to 144 square feet in gross floor area | |||
Over 144 square feet in gross floor area | |||
Accessory dwelling unit or in-law suite | |||
Outdoor assembly, seating, sales, display, or storage area | |||
Parks, Pools, or Playgrounds | |||
Commercial or public use | |||
Private residential use | |||
Landscaping, Exterior Lighting, Mechanical Equipment, or Stormwater/Green Infrastructure | |||
Residential use, up to 4 units | |||
Multi-family use, over 4 units | |||
Nonresidential or mixed use | |||
Off-Street Parking/Loading Area | |||
10 spaces or less | |||
Over 10 spaces | |||
Driveway | |||
Residential use, up to 4 units | |||
Multi-family use, over 4 units | |||
Nonresidential use, within existing curbcut, apron, or opening | |||
Nonresidential use, requiring new or altered curbcut, apron, or opening | |||
Energy systems and facilities | |||
Solar energy, small-scale | |||
Solar energy, large-scale or utility scale | |||
Wind energy conversion system | |||
Battery energy storage system, Tier 1 or 2 | |||
Battery energy storage system, Tier 3 | |||
Telecommunications equipment | |||
Other Actions | |||
Ordinary repair, maintenance, or replacement in-kind | |||
Interior building alteration | |||
Alterations to a building facade | |||
Change of use | |||
Improvement in accordance with a previously approved plan | |||
Modification or amendment to approved development plan | Return to original issuing review body | ||
Planned Unit Development (PUD) District | |||
Action involving the expansion or alteration of utility infrastructure | |||
NOTES: | |
(1) | Accessory use or structure includes decks, patios, porches, garages, sheds, etc. For full list see § 215-24.4. |
(2) | Whichever is less. |
Application and Review Procedures
Action | Exempt | Admin Review | Site Plan Review |
|---|---|---|---|
Construction/Expansion/Alteration | |||
Residential Use | |||
Single- or two-family dwelling on an approved lot | |||
Multi-family dwelling, up to 4 units | |||
Multi-family dwelling, over 4 units | |||
Nonresidential or Mixed Use | |||
Up to 20,000 square feet or 25% of existing gross floor area2 | |||
Over 20,000 square feet or 25% of existing gross floor area2 | |||
Accessory Use or Structure1 | |||
Up to 144 square feet in gross floor area | |||
Over 144 square feet in gross floor area | |||
Accessory dwelling unit or in-law suite | |||
Outdoor assembly, seating, sales, display, or storage area | |||
Parks, Pools, or Playgrounds | |||
Commercial or public use | |||
Private residential use | |||
Landscaping, Exterior Lighting, Mechanical Equipment, or Stormwater/Green Infrastructure | |||
Residential use, up to 4 units | |||
Multi-family use, over 4 units | |||
Nonresidential or mixed use | |||
Off-Street Parking/Loading Area | |||
10 spaces or less | |||
Over 10 spaces | |||
Driveway | |||
Residential use, up to 4 units | |||
Multi-family use, over 4 units | |||
Nonresidential use, within existing curbcut, apron, or opening | |||
Nonresidential use, requiring new or altered curbcut, apron, or opening | |||
Energy systems and facilities | |||
Solar energy, small-scale | |||
Solar energy, large-scale or utility scale | |||
Wind energy conversion system | |||
Battery energy storage system, Tier 1 or 2 | |||
Battery energy storage system, Tier 3 | |||
Telecommunications equipment | |||
Other Actions | |||
Ordinary repair, maintenance, or replacement in-kind | |||
Interior building alteration | |||
Alterations to a building facade | |||
Change of use | |||
Improvement in accordance with a previously approved plan | |||
Modification or amendment to approved development plan | Return to original issuing review body | ||
Planned Unit Development (PUD) District | |||
Action involving the expansion or alteration of utility infrastructure | |||
NOTES: | |
(1) | Accessory use or structure includes decks, patios, porches, garages, sheds, etc. For full list see § 215-24.4. |
(2) | Whichever is less. |