"HBD" HISTORIC BUSINESS DISTRICT
Table 12-1; HBD Building and Lot Development Standards | ||
|---|---|---|
HBD | HBD-I | |
Lot standards | ||
Area | ▪ 1.5K min. ▪ 15K max. | ▪ 3K min. ▪ 25K max |
Width | ▪ 25' min. ▪ 100' max. | ▪ 25' min. ▪ 150' max. |
Building Standards | ||
Front Setback | 0' - 10' | 0' - 30' |
Street Side Setback | 0' - 10' | 0' - 30' |
Side Setback | 0' | 10' |
Rear Setback | ▪ 10' ▪ 0' if abutting a publicly accessible alley. ▪ 15' if abutting residential zoned property. | ▪ 10' ▪ 0' if abutting a publicly accessible alley. ▪ 30' if abutting residential zoned property. |
Height | 40' 3 stories | 40' 3 stories |
Table 12-2: HBD Frontage Types and Design Standards. | |||
|---|---|---|---|
Main Street Frontage | Transitional Frontage | Workshop Frontage | |
Building Placement | |||
A - Front Building Line (build-to range) | 0' — 10' | 0' — 10' | 10' — 30' |
B - Required Front Building Line | 80% + | 60% + | 35% + |
Access and Parking Limits | |||
C - Access Width (max.) | 12' | 24' | 32' |
Parking Setback (min.) | Behind rear of building | Behind front building line | 6' min. |
Extent of Parking/Garage Bays | 0% | 40% | 65% |
Building Design | |||
Entry Feature Spacing | 50' max. | 75' max | 1 per building |
Massing and Modulation | 50'/500 s.f. | 100'/1,000 s.f. | 150'/2,000 s.f. |
Minimum First Story Transparency | 60% | 40% | 40% w/in 50' of entry |
Minimum Upper Story Transparency | 25% | 20% | 15% n/a for industrial buildings |