Schedule of Standards
Subject to the provisions of Section 3.14, the minimum standards for lot sizes and building area, setbacks, and height are listed as follows:
(view the current zoning map here (PDF))
| RR-1 Zone | RR-2 Zone | RR-3 Zone | RR-4 Zone | C-L Zone | |
| MINIMUM LOT SIZE | |||||
| Area Square feet | 11,250 | 7,500 | 13,900 | 18,000 | 8,750 |
| Width at building line | 75 | 50 | 75 | 85 | 50 |
| Width at street line | 75 | 25 | 75 | 15 | 50 |
| MAXIMUM GROUND COVERED BY BUILDINGS | |||||
| All buildings (as % of lot) | 25 | 40 | 25 | 25 | 70 |
| Accessory buildings (as % of rear yard) | 25 | 30 | 25 | 25 | None |
| MINIMUM SETBACK REQUIREMENTS (See Section 3.14) | |||||
| Main Building | |||||
| Front | 25 | 25 | 30 | 30 | None |
| Side: Sum of two sides | 20 | 20 | 30 | 30 | 20 |
| Each side | 10 | 10 | 15 | 15 | None |
| If side is adjacent to street | 15 | 15 | 15 | 15 | 25 |
| Rear | 15 | 10 | 30 | 30 | 25 |
| Accessory Building | |||||
| Front | 50 | 60 | 50 | 50 | None |
| Side | |||||
| If height is over 15 feet | 10 | 4 | 10 | 10 | None |
| If height is under 15 feet | 5 | 4 | 5 | 5 | None |
| If side is adjacent to street | 15 | 10 | 15 | 15 | None |
| Rear | 7 | 5 | 7 | 7 | 25 |
| MAXIMUM HEIGHT | |||||
| Main Building | |||||
| Stories | 2.5 | 2 | 2.5 | 2.5 | 2 |
| Feet | 30 | 30 | 30 | 30 | 40 |
| Accessory Building | |||||
| Stories | 1.5 | 1.5 | 1.5 | 1.5 | 1.5 |
| Feet | 20 | 20 | 20 | 20 | 20 |
Upon written application by the property owner for property in the RR-4 Cluster Zone, the property owner may request review and approval of the Planning Commission of development plans including architectural drawings, designs, and elevation drawings along with the proposed Plat of Subdivision. The Planning Commission, may, after its review of the application, approve the development plans and the Plat of Subdivision if the Planning Commission determines that the individual and the aggregate lots depicted on the Plat of Subdivision meet the Standard for RR-4 Cluster Zone set forth in subsection 9.21 of this Article VII; and that the submitted development plans meet the requirements of Article IV of this Code of Ordinances and, also, satisfy Criteria for Cluster Method of Development as set forth in subsection 9.22 of this Article VII.
(a) Total Density. The maximum number of dwelling units permitted shall not exceed the maximum number of dwelling units that would be allowed under the Standard Method of Development for RR-4.
(b) Minimum Lot Area. The minimum lot area of any single lot shall be at least 60% of the minimum lot area that would be required under the Standard Method of Development for RR-4.
(c) Minimum Lot Width. For any lot whose area meets or exceeds the lot area required under the Standard Method of Development for RR-4, those standards regarding minimum lot width shall apply. For all other lots, the minimum lot width at the building line and at the street line, respectively, shall be at least 60% of the minimum width that would be required under the Standard Method of Development for RR-4.
(d) Maximum Ground Covered by Buildings. For any lot that meets or exceeds the lot area required under the Standard Method of Development for RR-4, those standards regarding coverage by buildings shall apply. The Planning Commission may approve greater lot coverage for all other lots, subject to the restraints of the minimum set back requirements.
(e) Minimum Set Back Requirements. All buildings on any lot shall meet the minimum set back requirements as set forth under the Standard Method of Development for RR-4.
(f) Maximum Height. All buildings on any lot shall comply with the maximum height restrictions as set forth under the Standard Method of Development for RR-4.
(a) Each application for development of property in a cluster zone shall not be approved by the Planning Commission unless the proposed development conforms completely to the approved Plat of Subdivision for the area applied for.
(b) An application for development of property in a cluster zone shall be approved by the Planning Commission only if the Planning Commission finds that the proposed development would meet the following criteria: