Principal Solar Energy Facility Overlay District
Minimum lot area | 5 acres |
Minimum front, side and rear yard setback from nearest property line for perimeter fence | 50 feet |
Minimum front, side and rear yard setback from nearest property line for solar panels and their mounting equipment except as provided below | 75 feet |
Minimum front, side and rear yard setback from nearest property line for principal and accessory buildings and/or structures (including parking facilities and other structures containing or attached with equipment which cause sound, vibration, and/or emission, including, but not limited to, odor, smoke, vapor, gas, heat, dust, dirt, air pollution of any kind, EMF, wired and wireless communications interference, light or glare1) except as otherwise provided herein. | 150 feet |
Maximum solar panel height | 15 feet |
Maximum building, structure and/or appurtenance height | 15 feet |
Maximum lot coverage2 | 60% |
1 | In no case shall any sound, vibration, and/or emission of any kind from a PSEF occur beyond the PSEF property lines. |
2 | Maximum lot coverage for the purpose of this section shall be defined as the maximum percentage obtained by dividing the total impervious surface area, including the ground floor area of all principal and accessory buildings, the area of any paved or gravel road or other surface, and the cumulative surface area of solar panels on the lot, by the total area of the lot upon which the buildings, roads, surfaces, and solar panels are located. The cumulative surface area of solar panels, regardless of the mounted angle, shall be calculated as part of the overall lot coverage. |