§ 200-48 Intent.

The intent of the Planned Unit Development (PUD) article is to provide greater flexibility leading to more innovative design, creative use mixes, and layout of developments than what is normally possible under conventional zoning districts and which offer the potential for a sustainable development.

§ 200-49 Objectives.

[Amended 2-10-2025 by L.L. No. 1-2025]
In order to carry out the intent of this article, a PUD shall achieve the following objectives:
A. 
Encourage land development that preserves the natural landscape and existing vegetation to the greatest extent possible;
B. 
Reduce impacts to environmentally, historically and culturally sensitive areas;
C. 
Provide for the preservation and creation of open spaces, recreational spaces and other public spaces and make them accessible to residents;
D. 
Allow for a variety of housing types and densities, neighborhood retail and services establishments, and public and recreational facilities to coherently exist within the same development as a community;
E. 
Promote the efficient use of land resulting in networks of streets, utilities and other infrastructure features;
F. 
In proposing a PUD, it is also the intent to accomplish reductions in impervious surfaces as compared to standard development of the site, preserve and protect important resources that impact drainage, and to propose designs/layouts that reflect the conditions of the site and area and potentially improve those drainage conditions.
G. 
Ensure that the development is compatible with surrounding uses and reduces spillover impacts; and,
H. 
Promote the objectives of the Town of Wheatfield Comprehensive Plan.

§ 200-50 General requirements.

[Amended 11-7-2022 by L.L. No. 3-2022; 2-10-2025 by L.L. No. 1-2025]
A. 
The creation of a PUD shall be subject to the approval of the Town Board based upon the review and recommendations of the Planning Board and upon the results of a public hearing. The approval of a PUD rezoning is at the discretion of the Town Board and should not be presumed as an allowable use in the Town. A PUD application will follow the process required for a rezoning. Amendments to a PUD shall follow the same rezoning process.
B. 
In a PUD, the use and dimensional specifications found elsewhere in this Zoning Law are herein replaced by an approval process in which an approved plan becomes the basis for continuing land use controls. The application must meet the minimum dimensional and use requirements listed in § 200-51. The uses determined by an approval process for a PUD are subject to other nondimensional provisions of this chapter, such as, but not limited to, supplementary, off-street parking, loading, and stacking and sign regulations. The PUD plan as approved shall represent the zoning of the property, and any proposed changes in the uses or layout of uses would require rezoning to a modified PUD designation (following all of the requirements of this chapter).

§ 200-51 Regulations.

[Amended 5-21-2012 by L.L. No. 1-2013; 6-2-2014 by L.L. No. 2-2014; 11-7-2022 by L.L. No. 3-2022; 2-10-2025 by L.L. No. 1-2025]
A. 
Location. The Planned Unit Development District shall be applicable to any area of the Town of Wheatfield where the applicant can demonstrate that the characteristics of his development will satisfy the objectives of this section.
B. 
Minimum area. A PUD shall include no less than 20 acres of contiguous land.
C. 
Ownership. The tract of land proposed to be rezoned to a PUD may be owned, leased, or controlled either by a single person, a corporation, or by a group of individuals or corporations. An application must be filed by the owner or jointly by owners of all properties included in the project. In the case of multiple ownership, the approved plan shall be binding on all owners.
D. 
Open space. A minimum of 25% of the site shall be reserved as common open space, including pedestrian and bicycle facilities, parks and recreation areas, and public plazas and landscaped areas. Road and utility rights-of-way, driveways, parking areas and private lawn areas shall not be considered in calculating open space. Wetlands, floodways and other nonbuildable areas are typically not considered as part of the required open space requirements. If properly integrated into the site planning and incorporated into a passive recreational feature (walkways, etc.) these could be included in the 25% requirement. Open space shall include land upon which buildings are not permitted to be constructed, but shall exclude land that is part of a lot upon which building is permitted (it being intended to exclude land required for front, side and rear year setbacks from this definition) and shall also exclude land that is not permitted to be used for building construction, including, but not limited to, wetlands and ponds. Open space may include land upon which buildings are not permitted to be constructed, provided that the open space is improved and maintained for recreational usage, and the Planning Board and the Town Board have approved the use of such land as open space.
E. 
Common property. Common property in a PUD is a parcel or parcels of land, together with the improvements thereon, for which the use and enjoyment of is shared by the owners and occupants of the individual building sites. The applicant shall provide for and establish an organization for the ownership and maintenance of any common property. Such organization shall not be dissolved nor shall it dispose of any common property by sale or otherwise.
F. 
Permitted uses.
(1) 
The following are permitted uses within a Planned Unit Development District:
(a) 
Dwelling units that are detached, semidetached, attached, clustered, multistoried, or a combination thereof;
(b) 
Retail and personal service business establishments, which provide neighborhood services and are in scale and character with the PUD in which it is located. Businesses that are permitted within a PUD include, but are not limited to, the following:
[1] 
Stores selling groceries;
[2] 
Bakeries and coffee shops;
[3] 
Drugstores and convenience stores;
[4] 
Gift shops;
[5] 
Barber and beauty shops; and
[6] 
Administrative, professional, or executive offices.
(c) 
Public and recreational facilities.
(d) 
Mixed use buildings of permitted residential and commercial uses (mixed use buildings are not allowed to have residential uses on the first floor).
(e) 
Accessory uses and structures typically associated with these uses.
(2) 
Uses not permitted include, but are not limited to, the following:
(a) 
Automotive uses; and
(b) 
Industrial uses.
G. 
Density. Gross densities for residential land uses shall not exceed those set forth in the zoning district that existed, at time of the rezoning to PUD, in which the land is located. For lands that were previously zoned commercial or industrial, the density permitted would be the same as that permitted in an R-1 District. In no case shall the minimum amount of required open space be reduced to allow for the maximum allowable density.
H. 
Dimensional requirements for lots. For single family lots, the lots may be reduced to the minimum size allowed for a cluster lot in the existing zoning district where the PUD is proposed (or R-1 if the existing zoning is not residential), and have the minimum setbacks as described in the cluster development law. These lots can also just meet the standard requirements for an R-1 lot. At the time of application, and as part of the approval process, the applicant shall submit a residential lot layout plan illustrating the required setbacks, allowable building placement area (indicating maximum size structures to be allowed on the lot), and type and general location of the driveway.

§ 200-52 Procedures.

[Amended 2-10-2025 by L.L. No. 1-2025]
Prior to any subdivision plat, or any part thereof, for a PUD being filed in the office of the Niagara County Clerk and before any construction or site improvement work or permit for erection of permanent buildings in such Planned Unit Development can be granted, the developer, or his authorized agent, shall apply for and secure approval of such PUD in accordance with the following procedures:
A. 
Preapplication meeting. To avoid delays and to allow the Town Board to advise the applicant of potential concerns that may not allow the Town Board to entertain this rezoning or issues that should be addressed with the rezoning and preliminary site plan application, it is required that the applicant meet with the Town Board regarding basic concepts of the proposed PUD, including rough sketches and tabulations. At this pre-application meeting, the Town will discuss the drainage requirements of the Town, existing drainage conditions of the proposed project site and area, and any unique drainage problems that will need to be addressed in any application. Particular attention will be paid to Subsection F in the "objectives" section of this article. The applicant will need to address these issues in the PUD application (changes to the sketch plan and/or providing documentation identifying how these issues were addressed), prior to being placed on any Planning Board agenda. Based upon this meeting, the Town Board may provide direction to the applicant on whether they should proceed with a PUD rezoning application.
Planning Board input and recommendation. If the project is allowed to proceed to a PUD rezoning application, based on the above pre-application meeting, and the applicant wants to proceed, a full rezoning application needs to be made to the Town. The application will include a rezoning application, SEQR materials, a PUD plan (see Subsection C below) and other supporting documentation. The Town Board will refer this application to the Planning Board for review, report and recommendation. The Town Board in their referral shall include the results of their drainage input and any other concerns raised at the preapplication meeting.
B. 
Application for planned unit development. The Town Board shall collect a fee, to be determined by the Town Board, for the review of the PUD rezoning application. In addition, site plan and/or subdivision review fees shall be required, as appropriate.
C. 
Preliminary site plan. A preliminary site plan shall be prepared, as outlined in Article XII of this chapter, and accompany any application for a PUD. Five copies of the preliminary site plan shall be submitted to the Planning Board, accompanied by the following information and/or documents:
(1) 
Discussion of how the development meets the goals of the Town of Wheatfield Master Plan and Greenspace Plan;
(2) 
Discussion of how the development meets the intent and objectives of the PUD section, as outlined in §§ 200-48 and 200-49;
(3) 
Description and location of all environmentally, historically and culturally sensitive areas on the property;
(4) 
A calculation of the required amount of open space and requested residential density;
(5) 
The location, size and type of the various land uses proposed for the development;
(6) 
Identification and discussion of the innovative design and layout features that warrant a potential increase in density;
(7) 
Documentation that explains the density that would be allowed under the existing traditional zoning district;
(8) 
Documentation/information on how the Plan addresses the issues raised on drainage and how the PUD Plan will not create drainage problems and potentially improve problems in the area of the project;
(9) 
A statement of how common open space will be owned and maintained;
(10) 
If the development is to be phased, a phasing plan. Whether or not the project is to be phased, the preliminary site plan shall show the intended total project;
(11) 
Evidence of any sort in the applicant's own behalf to demonstrate his competence to carry out the plan to completion and his awareness of the scope of such a project, both physical and financial; and,
(12) 
A completed Part I of the Full Environmental Assessment Form (EAF).
D. 
Planning Board action on preliminary site plan.
(1) 
The Planning Board shall review the preliminary site plan (the PUD Plan) and related documents and shall submit a recommendation to the Town Board that the PUD application be approved, approved with conditions, disapproved, or modified and resubmitted.
(2) 
A recommendation for approval or approval with conditions by the Planning Board shall be based on the following:
(a) 
The application conforms with the Town of Wheatfield Comprehensive Plan;
(b) 
The application meets the intent and objectives of the PUD section as outlined in §§ 200-48 and 200-49;
(c) 
The application meets all the regulations for a Planned Unit Development outlined in § 200-51;
(d) 
The application includes all the requirements of a Planned Unit Development outlined in § 200-52C;
(e) 
The application is conceptually sound;
(f) 
There are adequate services and utilities available to serve the development, or can be made available with costs incurred by the developer.
(3) 
A recommendation that the application be disapproved should be filed with the Town Clerk, sent to the Town Board, and accompanied with a description of the reasons for such denial and a copy thereof mailed to the applicant. A recommendation that the application be modified and resubmitted should be accompanied with a description of what changes should be made to the application. The applicant, based on this recommendation of denial, shall either withdraw the application or appear before the Town Board for an official decision (Subsection E.).
(4) 
If, in any such evaluation, the Planning Board finds that any submission requirements prescribed by this Zoning Law are inapplicable because of unusual conditions of the Planned Unit Development, or the nature and quality of the proposed design and layout, it may recommend to the Town Board that an adjustment in such requirements be made.
E. 
Town Board action on preliminary site plan.
(1) 
The determination of the Town Board to approve, approve with conditions, disapprove, or request modifications to the application for a PUD, or adjust any requirements or regulations, shall be based on its review of the preliminary site plan and related documents, the Planning Board's recommendations, and matters brought forth at a public hearing. The Town Board shall also, where required, receive input from the Niagara County Planning Board and through a SEQR coordinated review process. The Town Board may, if it feels it necessary in order to protect the public health, safety, and welfare of the community, attach to its zoning resolution any additional conditions or requirements for the applicant to meet. The Town Board shall, at this time, approve the density standards for the development.
If the PUD is approved or approved with conditions, the applicant can proceed to site plan/subdivision approvals in accordance with Subsections G through J of this section and § 200-52.1, as applicable.
(2) 
An action by the Town Board disapproving the application should be filed with the Town Clerk and accompanied with a description of the reasons for such denial and a copy thereof mailed to the applicant. An action that the application be modified and resubmitted should be accompanied with a description of what changes should be made to the application.
F. 
Zoning. Upon approval or approval with conditions of an application for a PUD by the Town Board, the property in question shall be deemed rezoned as a Planned Unit Development District, and the Zoning Map shall be noted to reflect the change in zoning.
G. 
Site plan approval. Following the approval of the PUD by the Town Board, a site plan shall be prepared, as outlined in Article XII of the Zoning Law, and five copies shall be submitted to the Planning Board. The site plan shall substantially conform to the preliminary site plan (the PUD plan), incorporating any modifications, conditions, or other features recommended by the Planning Board and/or Town Board. For subdivisions, the plan shall conform to the Town Subdivision Regulations,[1] including § 200-52.1 of this article.
[1]
Editor's Note: See Ch. 169, Subdivision of Land.
H. 
Phasing.
(1) 
If the PUD is to be implemented in phases, then the applicant may submit a site plan showing only those phases they wish to develop. Any PUD that requires more than 24 months to be completed shall be required to be phased, and a phasing plan must be developed.
(2) 
Each phase shall be provided with temporary or permanent transitional features, buffers, turn-arounds, or protective areas in order to prevent disruptions and damage to completed phases, to future phases, and to adjoining property.
(3) 
It is the intent of these phasing regulations that individual phases of the PUD will have adequate provisions for access, parking, open space, recreational areas, stormwater management facilities and other improvements so that, if for any reason, the entire PUD is not completed, those portions of the development already constructed would be sufficiently served and be an asset to the community.
I. 
Planning Board action on a site plan after PUD approval. The Planning Board shall review the site plan and related documents and, within 62 days of a complete submission, shall approve or disapprove the site plan. The applicant shall also be notified at this time of the Planning Board's decision. In determining its action, the Planning Board may seek advice and assistance from such sources as the Town Attorney, Town Engineer, Town Building Inspector, Town Planning Consultant and Town Highway Superintendent. If the application includes a subdivision, then the Planning Board, in accordance with the Town's subdivision law and § 200-52.1, shall offer a recommendation of this subdivision application to the Town Board.
J. 
Town Board action on a subdivision.
(1) 
Once the Planning Board makes their recommendation on a subdivision plat, the Town Board shall follow the procedures of the Town's Subdivision law in approving this subdivision plan.
(2) 
In this review, the Town Board shall consider the input from the Planning Board, the requirements of the Town's laws, and the PUD plan that was approved. If the Town Board determines that the subdivision plan does not comply with the requirements and regulations of this article, then the record of such determination shall be filed with the Town Clerk and delivered to the applicant accompanied by a separate statement setting forth in detail the exact nature of such noncompliance and all other factors included in the basis for the Town Board's decision.

§ 200-52.1 Other regulations.

[Amended 2-10-2025 by L.L. No. 1-2025]
A. 
For subdivisions, the applicant shall prepare sets of subdivision plats suitable for filing with the County Clerk and which satisfy all plat requirements in the Town Subdivision Regulations (Chapter 169) in addition to other drawings required. If the PUD is being developed in phases, it may be platted and filed in corresponding components.
B. 
Regulation after initial construction and occupancy. For purposes of regulating the development and use of property after completion of initial construction and occupancy, any changes shall be processed as a PUD amendment, as outlined in this law.
C. 
Commencement of construction. No construction or site improvement work may commence until site plan and/or subdivision, approval and all the requirements thereof, has been granted.
D. 
Financial responsibility. No building permits shall be issued for construction within a PUD until the required improvements are installed or, alternatively, a performance bond or a letter of credit is provided in accordance with the procedures outlined in the Town Subdivision Regulations.