All uses and development, present and future, within any ten-acre or larger tract fronting on Route 130 shall be in accordance with the overall plan. The overall plan shall not replace the site plan as called for by Chapter 205, Land Subdivision and Site Plan Review, Article V, Site Plan Approval, for each specific structure or development, except at the discretion of the developer. The overall plan shall show the manner in which access will be provided to the entire tract, the manner in which protective buffering will be afforded to any adjacent residential areas and building placement for the required minimum initial construction. In cases where the entire tract is not to be developed immediately, alternatives for future development may be included. A maximum of two curb cuts shall be permitted on Route 130 for each full 435 feet of frontage, and they shall be subject to the approval of the New Jersey Department of Transportation. Such curb cuts shall be not closer than 200 feet to each other at their points of intersection with Route 130, measured center line to center line. Interior driveways or access points off main driveways connecting with Route 130 shall be at least 30 feet from a property line which is also a street line of Route 130.