When establishing measurements to meet the required yard sizes, or use or structure setbacks, the measurements shall be taken from the road right-of-way line, lot line or nearest high-water elevation to the point attached to the structure which is closest to the point to which measurement is being made. This shall include such projecting facilities as cornices, chimneys, eaves, porches, carports, attached garages, etc.