Require qualified independent geotechnical, hydrogeologic, site evaluation, engineering, and similar professional consulting services to determine adherence to best practices in planning and engineering when any portion of the development is within the direct watershed of a lake most at risk from new development as designated in Chapter 502, Direct Watersheds of Lakes Most at Risk from New Development, and Urban Impaired Streams, of the Maine Department of Environmental Protection. The project shall be reviewed in compliance with the stormwater standards included in the Maine Department of Environmental Protection Chapter 500, including basic, general, phosphorus, flooding, and other standards.[1] The review shall also ensure compliance with performance standards contained in the general standards of Chapter 500, § 4C, the basic standards described in Chapter 500, § 4B, and § 120-911C, D(2), H(1), and J of this chapter. The review shall include attendance at any scheduled Planning Board site walk.