Definitions.
Is the legal entity, including successors and assigns, that files an application under this section.
A residential subdivision for which all applicable land use permits have been issued, provided that the time for beginning construction under such permits has not expired.
Elements of a wind energy facility other than its generating facilities that are necessary to the proper operation and maintenance of the wind energy facility, including but not limited to buildings, access roads, generator lead lines and substations.
A certification issued by the Department of Environmental Protection pursuant to 35-A M.R.S.A. § 3456 for a wind energy development.
Wind turbines and electrical lines, not including generator lead lines that are immediately associated with the wind turbines.
A "generator interconnection transmission facility" as defined by 35-A M.R.S.A. § 3132 (1-B).
An Historic Site administered by the Bureau of Parks and Lands in the Department of Agriculture, Conservation and Forestry, with the exception of the Arnold Trail.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II)]
Any site, structure, district or archaeological site which has been officially included on the National Register of Historic Places and/or on the Maine Historic Resource Inventory, or which is established by qualified testimony as being of historic significance.
Any site or area designated by a municipality for passive recreation that is open and maintained for public use and which:
Is owned in fee simple by a municipality or is accessible by virtue of public easement;
Is identified and described in a local comprehensive plan; and
Has been identified and designated at least nine months prior to the submission of the applicant's wind energy facility permit application.
A tower used for the measurement and collection of wind data that supports various types of equipment, including but not limited to anemometers, data recorders, and solar power panels. MET towers may also include wildlife related equipment such as ANABAT detectors, bird diverts and wildlife entanglement protectors.
The municipal Planning Board, agency or office, or if none, the municipal officers.
The frame and housing at the top of the tower that encloses the gearbox and generator.
Any landowner, other than a participating landowner whose land is located within Winslow.
A residence, school, hospital, house of worship, public library or other building that is occupied or in use as a primary residence or is customarily frequented by the public at the time when the permit application is submitted.
One or more persons that hold title in fee or a leasehold interest with sublease rights to property on which generating facilities or associated facilities are proposed to be located pursuant to an agreement with the applicant or an entity that has entered into an appropriate agreement with the applicant allowing the applicant to demonstrate the requisite right, title and interest in such property.
An individual, corporation, partnership, firm, organization or other legal entity.
A residence for which all applicable building and land use permits have been issued, provided that the time for beginning construction under such permits has not expired.
Any location that is:
Accessible by foot, on a parcel of land owned by a nonparticipating landowner containing a residence or planned residence, or an approved residential subdivision, house of worship, academic school, college, library, duly licensed hospital or nursing home near the development site at the time an application for a wind energy facility is submitted under this section;
Within a State Park, Baxter State Park, a National Park, a nature preserve owned by a land trust, the Maine Audubon Society or the Maine chapter of the Nature Conservancy, the Appalachian Trail, the Moosehorn National Wildlife refuge, a federally designated wilderness area, a state wilderness area designated by statute, a municipal park or a locally designated passive recreation area, or any location within consolidated public reserve lands designated by rule by the Bureau of Parks and Lands as a protected location; or
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II)]
A hotel, motel, campsite or duly licensed campground that the municipal authority responsible for review and approval of the pending application under Subsection H(1) has designated a protected location after making a determination that the health and welfare of the guests or the economic viability of the establishment will be unreasonably impacted by noise in excess of that allowed under Subsection L(3)(b).
A building or structure, including manufactured housing, maintained for permanent or seasonal residential occupancy providing living, cooking and sleeping facilities and having permanent indoor or outdoor sanitary facilities, excluding recreational vehicles, tents and watercraft.
Either a scenic resource of state or national significance, as defined in 35-A M.R.S.A. § 3451(9) or a scenic resource of local significance located within the municipality and identified as such in a comprehensive plan, open space plan or scenic inventory adopted by the municipal legislative body.
Alternating changes in light intensity caused by the movement of wind turbine blades casting shadows on the ground or a stationary object.
A sequence of repetitive sounds which occur more than once within an hour, each clearly discernible as an event and causing an increase in the sound level of at least six dBA on the fast meter response above the sound level observed immediately before and after the event, each typically less than 10 seconds in duration, and which are inherent to the process or operation of the development and are foreseeable.
A profile drawing showing prominent features, including but not limited to topography, buildings, and trees, along and in relation to a line of sight extending from an observer's eye to the lowest point visible on a proposed tower.
A significant wildlife habitat as defined in 38 M.R.S.A. § 480-B(10).
That construction shall be considered to be substantially commenced when any work beyond excavation, including but not limited to, the pouring of a slab or footings, the installation of piles, the construction of columns, or the placement of a tower on a foundation has begun.
The freestanding structure on which a wind measuring or energy conversion system is mounted.
The distance measured from the surface of the tower foundation to the highest point of any turbine rotor blade measured at the highest arc of the blade.
A facility that uses one or more wind turbines to convert wind energy to electrical energy. A wind energy facility includes generating facilities and associated facilities.
A wind energy facility having a maximum generating capacity of less than 100 kW, a maximum of one wind turbine and a maximum turbine height of 80 feet.
A wind energy facility having a maximum generating capacity of less than 100 kW and either more than one wind turbine, or one or more wind turbines with a turbine height greater than 80 feet.
A wind energy facility having a maximum generating capacity of 100 kW or greater and which does not require a state permit issued by the Department of Environmental Protection under the Site Location of Development Act, 38 M.R.S.A. § 481 et seq.
A wind energy facility having a generating capacity of 100 kW or greater and which requires a state permit issued by the Department of Environmental Protection under the Site Location of Development Act, 38 M.R.S.A. § 481 et seq.
A system for the conversion of wind energy into electricity which is comprised of a tower, generator, nacelle, rotor and transformer.